Attachment 2- CTK Salient Characteristics.pdf

PDF 77 KB Posted

Attached to
EE CTK
Solicitation number
FA480924Q0099
Issued by

About this file

This document outlines the salient characteristics for Composite Tool Kits (CTK) required under a federal contract opportunity. The key requirements include:

The contractor must provide on-site assistance with delivery and inventory of the CTKs, as well as bi-weekly assistance for upkeep of the cabinets and tools. The contractor must also provide a lifetime warranty for applicable hand tools and cabinets. Specific requirements are provided for the tool box construction, including powder-coating, drawer slides, casters, stainless steel top, and tool control foam inserts. The contractor must also provide and install brackets to hold engine shutdown fuel drain hose assemblies and a 4' fiberglass ladder on each CTK. All tools must be laser etched with a provided code. The CTK cabinets must be preloaded with the required tools prior to delivery. Partial compliance with the salient characteristics will not be acceptable.

The related federal contract opportunity is Solicitation Number FA480924Q0099 for "EE CTK", issued by the Department of the Air Force Air Combat Command. This is a brand new requirement with no incumbent.

View the file

Other files

File Type Posted
Solicitation - FA480924Q0099.pdf PDF
Attachment 1- EE CTK Tools.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CTK Salient Characteristics

A. Contractor shall provide on-site assistance with the delivery and initial inventory of all composite tool kits, (CTK)s.

B. Contractor shall provide bi-weekly assistance for the upkeep of the cabinets/tools

C. Contractor shall provide lifetime warranty replacement of applicable hand tools and cabinets as per standard manufacturer’s warranty policies.

D. Contractor tool boxes shall be powder-coated. Painted tool boxes will not be accepted.

E. Contractor shall provide cabinets with a locking device that incorporates using an external padlock with an internal lock bar for locking the drawers An external “hinge bar to cover the drawers for locking” will not be acceptable.

F. Contractor shall provide cabinets that incorporate a roller cage style drawer slide, no ball bearing style drawer slides will be accepted.

G. Drawer slides must have a minimum of 400 lb capacity.

H. Contractor shall provide cabinets that incorporate individual drawer locking devices that the entire handle front face of the drawer lifts up to be used to unlock the drawer not just a side flip lever at either edge of the drawer.

I. Contractor shall provide two swivel, (with external locking devices), and two rigid casters that are “Foreign Object Damage” FOD free design using a Kingpinless construction medium heavy duty cold-forged steel to reduce shock on the tool box, and the wheels must be manufactured from Miratek 95 red dura-polyurethane to reduce degradation from exposure to existing chemicals on Seymour Johnson Air Force Base, 4th AMXS flightline, and a minimum of 820lbs capacity for each caster.

J. Box must come with a 1.75” thick 16 gauge stainless steel top with full wood core and #4 brushed finish.

K. Contractor shall provide exact tools and quantities listed in the requirement section of this proposal.

L. Contractor shall provide and install on the back portion of cabinet a bracket to hang two each

“Engine Shutdown Fuel Drain Hose Assemblies” IAW 4 MXG/MXQ Memorandum for Record dated 2 Jun 04 so they do not drag or fall off during travel from hangar to aircraft location on each CTK.

M. Contractor shall provide two each for every APG Box: Engine Shutdown Fuel Drain Hose

Assemblies in accordance with 4 MXG/MXQ Memorandum for Record dated 2 Jun 04.

N. Contractor shall provide and mount on cabinet, opposite side from push handle a bracket to hang 4’ fiberglass ladder that has a maximum capacity of 300 lbs so it does not drag or fall off during travel from hangar to aircraft location on each CTK.

O. Both mounting brackets listed above should be attached in a manner as to not void the manufacturer warranty or the integrity of the tool box in any way.

P. Both mounting brackets shall be powder-coated to match the color of the tool box.

Q. Contractor shall provide tool control foam inserts consisting of grade black ½” thick crosslinked polyethylene foam and green hard composite plastic backing with a cutout of each tool that is assigned to this CTK.

R. Layouts for tool control foam inserts shall be designed in conjunction with the end user’s input and provided for review and approval before manufacturing.

S. All tools shall be laser etched in a permanent manner with a code that will be supplied upon award of contract, but in a way as not to penetrate the chrome plating, or affect the tool in any way as to void the warranty, nor impede the function of the tool.

T. Tool cabinets shall be preloaded with tools inserted into foam cutouts and loaded in their corresponding drawers to be delivered as a turn key and ready to use.

U. All screwdrivers must include Lasertip design to reduce slipping risk and higher torque transfer on fasteners.

V. Contractor shall meet all of the requirements for the “Salient Characteristics”. Partial requirement compliance will not be acceptable.

File details come from the government source that posted it. Updated .