Attachment 2 CPT Requirements.docx
DOCX document 23 KB Posted
- Attached to
- FY26 Geotechnical Drill Rig
- Solicitation number
- 300000216828196
- Issued by
- Missouri
About this file
This document outlines the Cone Penetration Test (CPT) equipment requirements for the Missouri Department of Transportation's FY26 Geotechnical Drill Rig procurement. The specifications detail a comprehensive equipment package including a Geoprobe 3135GT Tracked Geotechnical Drill Rig with a Geoprobe 105DP Drill Mast and GR10 Geotech Head Assembly. The required CPT system must feature a minimum cone capacity of 20 tons downforce and 30 tons pullback, with dual anchor points to provide symmetrical resistance against push forces. The equipment package includes a 10-ton digital seismic cone, friction reducers (both segmented and continuous configurations), 40 one-meter sounding rods, 45-meter EFCS Series sounding cable, and a 20-ton CPT rod auto clamp system. Additional requirements include an automatic seismic hammer, CPT data acquisition hardware and software capable of capturing seismic and dissipation data, auxiliary swing arm or swivel control area, an AC power unit inverter with multiple power outlets, and an engine design that allows easy accessibility for routine maintenance.
MoDOT has determined that Geoprobe Systems is the sole source capable of meeting all specified requirements, making this a one-time purchase through a single-source procurement. The specifications are restrictive by design, as Geoprobe Systems is identified as the only distributor meeting the comprehensive technical requirements outlined in the attachment. Interested parties or those seeking clarification regarding this solicitation should contact Ashten Lorts, the designated buyer, at ashten.lorts@modot.mo.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MODOT 0000000214SL_SUPPLIER.pdf | ||
| Quote.pdf | ||
| Attachment 1 Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CPT Requirements Multiple Anchor Points – At lease two anchor points to give symmetrical resistance against push forces. (Augers) Cone Requirements
· Cone is required to have a minimum of 20 tons downforce and 30 tons pullback
· 10 T Cone Digital (Seismic)
· 10 T Friction Reducer, Segmented
· 10 T Friction Reducer, Continuous
· 20 T Sounding Rods, 1 meter, (40)
· EFCS Series Sounding Cable, 45 meters
· 20 T CPT Rod Auto Clamp
· Automatic Seismic Hammer CPT Data CPT data acquisition hardware and software for seismic and dissipation etc. data Controls and Auxiliary Swing arm or swivel control area Auxiliary AC power unit (inverter) with power outlets Engine Access - Must be easily accessible for routine maintenance