Attachment 2 - Contract Surveillance Plan.docx
DOCX document 59 KB Posted
- Solicitation number
- N00421-18-R-0053
About this file
This document contains a contract surveillance plan and related federal contract opportunity. The contract surveillance plan outlines quality assurance methods for a contract to provide global radio frequency and intelligence network services to the Naval Air Warfare Center Aircraft Division Integrated Command and Control and Intelligence Division. It details responsibilities of government resources including the contracting officer, contracting officer's representative, and project leads. It also includes methods for monitoring contractor performance, deliverables, and metrics.
The related federal contract opportunity is a draft pre-solicitation for the global radio frequency and intelligence network services. It provides an overview of the requirement, describes the scope of work to include systems engineering support, and notes the solicitation number, NAICS code, product service code, and that it is a follow-on to a previous Seaport-e task order. Comments on the draft solicitation are requested to be submitted by a specified date.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-18-R-0018 Enclosure (3) Enclosure (3) Contract Surveillance Plan for Global Radio Frequency and Intelligence Networks
1. Purpose
This Contract Surveillance Plan (CSP) document is developed and applied by the Government to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs In Accordance With (IAW) the Statement of Work (SOW), and the Government receives the quality of services called for in each Task Order (TO) SOW.
The Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Integrated Command and Control (C2) and Intelligence (IC2&I) Division integrates and delivers products for Command, Control, Communications, Computers, Combat, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems. These critical C5ISR solutions are funded by a broad range of Department of Defense (DoD) and non-DoD customers, including joint forces commands, warfighters, and disaster recovery/first responders. The IC2&I Division is the organic Lead Systems Integrator (oLSI), using a rapid engineering process to provide solutions with a blend of Commercial-off-the-Shelf (COTS), Government-off-the-Shelf (GOTS), and fully customized solutions. The IC2&I Division will be integrally involved in the design, integration, and installation required for Global Radio Frequency and Intelligence Networks (GRFIN).
This Contract will have Cost Plus Fixed Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODC). The Contract will have one (1) five-year ordering period. A properly executed CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this CSP is provided under Contract Section E - Inspection and Acceptance which provides for inspections and acceptance of the services, products and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant orders.
The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)) and make related determinations and findings on behalf of the Government. The PCO for this contract is Ms. Kristen Ferro. The ACO will be designated in the resulting Contract. Contracting officers are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates individual GPLs to assist in administering of specific efforts under the Contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this CSP:
KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract and safeguards the interests of the United States in the contractual relationship. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
GPL: The GPL is responsible for assisting in administering of specific efforts under the Contract. A GPL cannot, in any manner, alter the scope of the Contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one (1) determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.
b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC).
7. Surveillance
Enclosure (2) sets forth the performance standards, incentives and surveillance methods for the Contractor, the COR and GPLs while Enclosures (1) and (3) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations and any actions related to the Contractor’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR will forward these records to the KO via the Surveillance and Performance Monitoring (SPM) tool.
9. Enclosures
Enclosure (1): SAC Enclosure (2): Quarterly Evaluation by CDRLs Enclosure (3): Annual Surveillance Summary N00421-16-R-0059
| N00421-18-R-0053 |
| Attachment 2 |
Source Selection Information 2 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
ENCLOSURE (1): SURVEILLANCE ACTIVITY CHECKLIST (SAC)
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of SB, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
QUARTERLY EVALUATION – BY SOW Paragraph
| Description |
| Surveillance Method/Measure |
| Dates |
| Quality Assessment |
| Schedule Assessment |
| Cost Control Assessment |
| Business Relations Assessment |
| Management Assessment |
| Utilization of SB Assessment |
| Other Areas Assessment |
| Provide research, development, design, verification, and validation of new, production or in-service systems support IAW paragraph 3.3.1 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide systems engineering, assimilation, and installation support IAW paragraph 3.3.2 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide installation, integration, verification, and Test and Evaluation (T&E) support IAW paragraph 3.3.3 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide operations, maintenance, and training support IAW paragraph 3.3.4 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide technical and project management support IAW paragraph 3.3.5 |
| 100% Inspection by COR/ACOR and/or GPLs |
Enclosure (1) Enclosure (1)
Source Selection Information 8 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
ENCLOSURE (2): QUARTERLY EVALUATION BY CDRL
| Description |
| Surveillance Method/Measure |
| Dates Due |
| Dates Completed |
| No. Submittals |
| No. of Req’d Rework |
| Percentage On Time |
| Comments |
| A001 – Contracting Officer’s Management Report; Segregation of Costs and Invoice Requirements Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A002 – Contractor’s Progress and Status Report; Financial Progress Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A003 – Contractor’s Progress and Status Report; Contractor’s Personnel Roster/Workforce Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A004 – Report, Record of Meeting/Minutes; Trip/Meeting Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A005 – Phase-Out Transition Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A006 – Accident Incident Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A007 – Operations Security (OPSEC) Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A008 – Technical Report – Study/Services |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A009 – Presentation Material |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A010 – Technical Report – Study/Services; Requirement Traceability Matrix |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A011 – Conceptual Design Drawings / Models; System Concepts Documentation |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A012 – System/Subsystem Specifications (SSS) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A013 – Site Survey Report (SSR); Site Survey Results |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A014 – Product Drawings/Models and Associated Lists |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A015 – Standardized Material Equipment List (MEL) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A016 – Technical Report – Study/Services; Technical Manuals and Materials |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A017 – Job Manual; Operations and Maintenance Manuals and Materials |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A018 – Training Materials; Operator Training Manuals and Materials and Course Curriculum |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A019 - Test Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A020 – Test Procedures |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A021 - Test/Inspection Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A022 - Technical Report – Study/Services; After Action Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A023 – Integrated Logistics Support (ILS) Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A024 – Supplier’s Configuration Management (CM) Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A025 – Engineering Change Proposal (ECP) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A026 – Program Management Plan; Project Requirements |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A027 – Implementation Plan; Integration/Installation Report |
| 100% Inspection by COR/ACOR and/or GPLs |
| A028 – Technical Data Report |
| 100% Inspection by COR/ACOR and/or GPLs |
Metric Summary:
Current Period
Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Enclosure (2) Enclosure (2)
ENCLOSURE (3): ANNUAL SURVEILLANCE SUMMARY
The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.
| Description |
| Surveillance Method/Measure |
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Quarterly Ratings |
| Schedule |
| Review of Quarterly Ratings |
| Cost Control |
| Review of Quarterly Ratings |
| Business Relations |
| Review of Quarterly Ratings |
| Management |
| Review of Quarterly Ratings |
| Utilization of SB |
| Review of Quarterly Ratings |
| Other Areas |
| Review of Quarterly Ratings |
Annual Surveillance Completed By: _______________________
Date Completed: ________________
All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.
Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes and assess the effectiveness of Contractor corrective actions.
Cost Control: Assess the Contractor’s effectiveness in forecasting, managing and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations: Assess the timelines, completeness and quality of problem identification; corrective action plans; proposal submittals; the Contractor’s reasonable and cooperative behavior; effective business relations; and customer satisfaction.
Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Utilization of SB: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned SBs (WOSBs), HUBZone, Veteran Owned SBs (VOSBs), Service Disabled Veteran Owned SB (SDVOSB), and ANCs and Indian Tribes that are not Small Disadvantaged Businesses (SDBs) or SBs) to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the Contract required targets and the Contractor’s submitted SB plan.
Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Source Selection Information 11 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
File details come from the government source that posted it. Updated .