About this file

This is a bid form pricing attachment for arborist services issued by the City of Portland, Oregon. The invitation to bid (ITB #0000XXXX) requires proposers to submit pricing for a comprehensive range of tree maintenance and removal services, including pruning crews (ground/ladder and climbing), tree removal crews (ground/ladder and climbing), additional laborers, ISA arborist consultations and assessments, stump treatment and herbicide application, pesticide application, stump grinding (both hourly and per-inch diameter), aerial lift truck services, and skid steer/material loader equipment. The bid form presents two distinct rate schedules: one for BOLI projects with PCEF pricing and one for non-BOLI projects. Quantities listed are estimates only and do not represent guaranteed orders; the City reserves the right to increase or decrease quantities as requirements vary. All hourly rates must include labor, consumable materials and supplies, overhead, supervision, mileage, travel time, and related expenses.

The pricing structure differentiates between standard work (Monday–Friday, 7:00 a.m.–5:30 p.m.) and special conditions, which include climbing trees with poison oak/ivy within 25 feet, inclement weather, high winds, and work outside standard hours. Special conditions pricing must be approved by the City Project Manager prior to work commencement and cannot be combined with emergency service rates. Emergency services, defined as response within six hours, have separate pricing provisions. Reimbursable costs at actual expense include traffic control, pesticide or herbicide materials, backfill soil, utility assist work, pre-approved equipment rentals (billed on crane-time basis with no mobilization fees), and waste disposal including one-way travel to approved sites. Non-reimbursable costs include mark-ups, consumable materials already included in hourly rates, management or travel fees for traffic control device rental and return, OSHA job site requirements, and contractor-provided safety equipment and personal protective equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT 2 - BID FORM
ARBORIST SERVICES ITB #0000XXXX
Proposer must enter pricing on ALL lines. Quantities listed here are estimates only. They do not represent actual orders that will be made under this contract. The City of Portland reserves the right to increase or decrease the quantitites shown, as requirements may vary.
Hourly rates include labor, consumables materials and supplies, overhead, supervision, mileage, travel time and any other items listed below.

No fees shall be invoiced outside of the rates in this Attachment without specific written City authorization.

RATES FOR BOLI PROJECTS (PCEF PRICING)
QTYUNIT OF ISSUESUNIT PRICEEXTENDED PRICESPECIAL CONDITIONS*EMERGENCY **
Pruning Creww _ Ground or Ladder
includes three (3) persons50Hour$0.00
Pruning Crew - Climbing
includes team of three (3) including certified climber20Hour$0.00
Tree Removal Crew - Ground or Ladder
includes three (3) persons20Hour$0.00
Tree Removal Crew - Climbing
includes team of three (3) including certified climber75Hour$0.00
One (1) Additional Laborer40Hour$0.00
One (1) ISA Arborist Laborer10Hour$0.00
ISA Arborist Consultation, Assessments, Reports10Hour$0.00
Stump Treatment/Other Herbicide Application
includes licenses herbicide applicator50Tree$0.00
Pesticide Application
includes licenses pesticide applicator50Tree$0.00
Stump Grinding per hour
includes one (1)ground person and necessary machinery50Hour$0.00
Stump Grinding per inch diameter of stump
includes one (1) ground person and necessary machinery50Inch$0.00
Aerial Lift Truck
inludes one (1) truck and operator100Hour$0.00
Skid steer or comparable material loader (Includes equipment and (1) operator)20Hour$0.00
Total$0.00
RATES FOR NON-BOLI PROJECTS
QTYUNIT OF ISSUESUNIT PRICEEXTENDED PRICESPECIAL CONDITIONS*EMERGENCY **
Pruning Creww - Ground or Ladder
includes three (3) persons50Hour$0.00
Pruning Crew - Climbing
includes team of three (3) including certified climber20Hour$0.00
Tree Removal Crew - Ground or Ladder
includes three (3) persons20Hour$0.00
Tree Removal Crew - Climbing
includes team of three (3) including certified climber75Hour$0.00
One (1) Additional Laborer40Hour$0.00
One (1) ISA Arborist Laborer10Hour$0.00
ISA Arborist Consultation, Assessments, Reports10Hour$0.00
Stump Treatment/Other Herbicide Application
includes licenses herbicide applicator50Tree$0.00
Pesticide Application
includes licenses pesticide applicator50Tree$0.00
Stump Grinding per inch diameter of stump
includes one (1) ground person and necessary machinery50Inch$0.00
Aerial Lift Truck
inludes one (1) truck and operator100Hour$0.00
Skid steer or comparable material loader (Includes equipment and (1) operator)Hour
TOTAL$0.00
* Special Conditions: Climbing trees with poison oad or poison oak on the groun within 25ft. Of the tree, inclement weather (snow or ice strom) and high winds. Any work outside of standard work days and hours (7-5:30 pm, Monday- Friday). The existance of these special condision must be determined and approved by the City Project Manager prior to commencement of work. special condistion and emergency services are mutually exclusive and pricing cannot be combined.
** Emergency Service: response within six (6) hours, see Attachment 1, Scope of Work
REIMBURSABLE COSTS
The following items may be reimbursed AT COST.

To receive reimursement, Contractor must submit itemized documentation of costs and inoices with their regular invoice.

Traffic Control: sub-contracted flagges, PBOT permit(s), and rental of non-standard traffic control devices
Pesticide or Herbicide materials
Backfill soil: Materials spesified to meet the stump grinding backfill
Utility assist: sub-contracted work needed to clear required clearences from high-volage utility lines
Rentals:

Rental of non-standard equipment that was pre-approved in writing by a City representative. City will reimurse for the rental cost per City of Portland Standard Construction Specifications, Section 00197.20(k) Hourly rates for non-standard equipment shall be billed on a "crane time" basis, meaning Contractor may only bill for hours equipment is used on site. Equipment hourly cost shall be inclusive. No mobilization fees will be paid.

Waste Disposal: One-way travel time to approved disposal sites for disposal of chippings and waste and direct cost of tipping or disposal fees.

NON-REIMBURSABLE COSTS
The following items will NOT be paid.
Mark-ups
Consumable materials and supplies, overhead, supervision, mieage and travel time
Management or travel fees associated with rental and return of traffic control devices
Any supplies or services to meet OSHA job site requirements
Contractor-provided safety and compliance equipment required by OSHA and applicable regulations, including PPE, portable sanitation facilities (porta-johns), first aid supplies, and any other equipment mandated for worker health and safety