Attachment_2-B08-Bid_Schedule_Revision_1_Cabo_Rojo_NWR_-_Salt_Flats_Friends_Building_Rehabilitation.pdf

PDF 59 KB Posted

Attached to
Audio-Visual Salt Flats Friends Building
Solicitation number
140FHR24R0004
Issued by

About this file

This document is a Schedule of Items for the Salt Flats Friends Building Rehabilitation project at the Cabo Rojo National Wildlife Refuge in Puerto Rico. The schedule lists the required construction services, including performing mold detection and mitigation, repairing damaged exterior and interior walls, and providing electrical services. Bidders are required to provide detailed pricing and cost breakdowns for each line item. Failure to enter prices on all line items will result in bid rejection.

The related federal contract opportunity is for Audio-Visual services for the Salt Flats Friends Building, solicited by the Department of the Interior Fish and Wildlife Service under Solicitation Number 140FHR24R0004. No additional details about the contract opportunity are provided in the given information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

for

Construction Services for Salt Flats Friends Building Rehabilitation Project at the Cabo Rojo NWR, Cabo Rojo, Puerto Rico

CLIN Number Description Unit Amount

NOTE Please use the Attached Fee Proposal Spreadsheet to show Proposed Construction Costs for this Project in detail in addition to completing items below.

00 General Requirements Lump Sum $

10 Perform Mold Detection and Mitigation

Lump Sum $

20 Repair Damaged Exterior Walls

Lump Sum $

30 Repair Damaged Interior Walls

Lump Sum $

40 Perform Electrical Services Lump Sum $

TOTAL AMOUNT

NOTE:

Provide pricing and cost element break downs for each of the items listed, down to the sub item level in the Scope of Work, in enough detail to allow adequate price analysis.

This could include, but is not limited to, labor, materials, equipment, competitive subcontractor quotes, overhead, bonding and profit.

FAILURE TO ENTER PRICES ON ALL LINE ITEMS SHALL BE CAUSE FOR

REJECTION OF THE BID.

SCHEDULE OF ITEMS
NOTE:
FAILURE TO ENTER PRICES ON ALL LINE ITEMS SHALL BE CAUSE FOR REJECTION OF THE BID.