Attachment 2 - A-G PRS Deliverables 20220913.pdf

PDF 510 KB Posted

Attached to
Fire Sprinkler, Fire Alarm Maintenance, Inspection, and Testing Services
Solicitation number
W9124C-23-R-0009
Issued by

About this file

This presolicitation notice seeks fire sprinkler and fire alarm maintenance, inspection, and testing services. The services are required at the Moncrief Army Health Clinic on Fort Jackson in South Carolina. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other non-personal services necessary to perform the work. A draft performance work statement and associated attachments included provide additional details on the required capabilities. The NAICS code is 561621 with a small business size standard of $22 million. The product service code is H912. The period of performance consists of a base year plus four 12-month option periods starting in December 2022. The contract type will be firm fixed price. The proposed contract may include service contract labor categories.

View the file

Other files

File Type Posted
W9124C23R0009v3.docx DOCX document
Attachment 1 - Draft Fire Alarm Sprinkler Testing PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft Attachment "A"

Building List Installation Asset No. Asset Street City zip Sprinkler Fire Alarm

1 Fort Jackson 4575 McWethy Troop Medical Clinic Stuart Street Fort Jackson 29207 Yes Simplex 4100U 2 Fort Jackson 1890 Physical Examination Station Washington Road Fort Jackson 29207 Yes Simplex 4002 3 Fort Jackson 4590 Caldwell Dental Clinic Strom Thurmond Blvd Fort Jackson 29207 Yes Simplex 4010 4 Fort Jackson 4323 Oliver Dental Clinic Hill Street Fort Jackson 29207 Yes Simplex 4100U 5 Fort Jackson 5330 Hagen Dental Clinic Moseby Street Fort Jackson 29207 Yes Simplex 4020 6 Fort Jackson D2445 Vet Facility Knight Road Fort Jackson 29207 Yes EST-3 7 Fort Jackson 4500 Moncrief Army Community Hospital Stuart Street Fort Jackson 29207 Yes EST-3 8 Fort Jackson 4503 Boiler Plant Stuart Street Fort Jackson 29207 No EST-3 9 Fort Jackson 4504 Chiller Plant Stuart Street Fort Jackson 29207 No EST-3

10 Fort Jackson 2498 Vet Admin Knight Road Fort Jackson 29207 No EST-3 DPW maintains all Monacos

Contract covers Sprinkler and Fire Alarm in all Bldgs except the Fire Alarm in Bldg. 4500

D raft

O utbuildings Device Testing List

This contract includes, but is not lim ited to, the follow ing devices.

Type

Total Sprinkler Flow /Tam per Total Fire Alarm

Building

Duct Sm oke Detector

Heat Detector

Photo Sm oke Detector

Pull Station-Single Action

Alarm Indicating device

Fire Alarm Panel

Control Valve (PIV)

Backflow

(O S&

Y)

City Connection

Inspectors test

Alarm received flow test

Type Total Sprinkler Flow

/Tam oke Detector

Heat Detector

Photo Sm oke Detector

Pull Station-Single Action

Alarm

Indicating device

Fire Alarm

Panel

Control Valve (PIV)

Backflow (O

S& Y)

City Connection

Inspectors test

Alarm received flow test

Type

Total Sprinkler Flow /Tam oke Detector

Heat Detector

Photo Sm oke Detector

Pull Station-Single Action

Alarm Indicating device

Fire Alarm Panel

Control Valve (PIV)

Backflow

(O S&

Y)

City Connection

Butterfly

Inspectors test

Alarm received flow test

Type

Total Sprinkler Flow /Tam oke Detector

Heat Detector

Photo Sm oke Detector

Pull Station-Single Action

Alarm Indicating device

Fire Alarm Panel

Control Valve (PIV)

O utbuildings Device Testing List

This contract includes, but is not lim ited to, the follow ing devices.

Backflow

(O S&

Y)

Control Valve (Butterfly)

City Connection

Inspectors test

Alarm received flow test

Supervised Tam per Signals

Type

Total Sprinkler Flow /Tam oke Detector

Heat Detector

Photo Sm oke Detector

Pull Station-Single Action

Alarm Indicating device

Fire Alarm Panel

Control Valve (PIV)

Backflow

(O S&

Y)

Control Valve (Butterfly)

City Connection

Inspectors test

Alarm received flow test

Supervised Tam per Signals

Type

Total Sprinkler Flow /Tam oke Detector

Heat Detector

Photo Sm oke Detector

Pull Station-Single Action

Alarm Indicating device

Fire Control Panel (LO C,M

NS,FACP,FAAP)

Control Valve (PIV)

Backflow (O

S& Y)

Control Valve (Butterfly)

City Connection

Inspectors test

Alarm received flow test

Supervised Tam per Signals

Type Total Sprinkler Flow

/Tam oke Detector

Heat Detector

Photo Sm oke Detector

Pull Station-Single Action

Alarm

Indicating device

Fire Alarm

Panel

Type

Total Sprinkler Flow /Tam oke Detector

Heat Detector

O utbuildings Device Testing List

This contract includes, but is not lim ited to, the follow ing devices.

Photo Sm oke Detector

Pull Station-Single Action

Alarm Indicating device

Fire Alarm Panel

Type Total Sprinkler Flow

/Tam oke Detector

Heat Detector

Photo Sm oke Detector

Pull Station-Single Action

Alarm

Indicating device

Fire Alarm

Panel

Draft MACH Fire Pump 15 Jul 2011

Log. (System/Presure/Flow)

System/Presure/Flow

Attachment "C" Fire Pump Test Sheet

Sprinkler Demand

1000 1770 65 Combined Curve 1500 1770 43 System/Presure/Flow

Factory/Presure/Flow

P 130 r e 120 s u r 100

Hose Suction

PSI

Discharge

PSI

Pitot

PSI GPM Total GPM RPM NET PSI

Churn 113 185 0 0 0 1791 72 1 104 172 32 504 504 1783 68 2 80 145 32,32 504,504 1008 1773 65 3 70 125 22,28,24 430,433,472 1335 1768 55

0 75

Attachm ent "D

Q uarterly Flow and Tam per W ork Sheet for Building 4500

Main drain Valve PSI

D evice

D evice D escription

Checked Confirm Shut Open

06 05 0135

W aterflow

Penthouse Level C enter

06 05 0136

Valve Tam per C enter Penthouse

06 05 0137

W aterflow

Penthouse Level W est

06 05 0138

Valve Tam perW est

Penthouse

06 04 0154 Valve Tam per 12th FlrEast Stair #4

06 04 0131 Valve Tam per 12th FlrEast Stair #4

06 04 0130 W aterflow 12th Floor East Stair #4

06 02 0132

W aterflow

11th Floor East Stair #4

06 02 0133 Valve Tam per 11th FlrEast Stair #4

05 04 0131 W aterflow 10th Floor East Stair #4

05 04 0132

Valve Tam per 10th FlrEast Stair #4

05 02 0132

W aterflow

9th Floor East Stair #4

05 02 0133 Valve Tam per 9th Flr East Stair #4

04 05 0132 W aterflow 8th Floor East Stair #4

04 05 0133

Valve Tam per 8th Flr East Stair #4

04 04 0132

W aterflow

7th Floor East Stair #4

04 04 0133 Valve Tam per 7th Flr East Stair #4

04 02 0133 W aterflow 6th Floor East Stair #4

04 02 0134

Valve Tam per 6th Flr East Stair #4

03 04 0128

W aterflow

5th Floor East Stair #4

03 04 0129 Valve Tam per 5th Flr East Stair #4

03 02 0136 W aterflow 4th Floor East Stair #4

03 02 0137

Valve Tam per 4th Flr East Stair #4

02 05 0158

W aterflow

3rd Tow er Stair #4

02 05 0159

Valve Tam per 3rd Flr Tow er Stair #4

02 03 0136 W aterflow G rnd Tow erStair #4

02 03 0137

Valve Tam per G rnd Tw rStair #4

01 04 0140

W aterflow

2 Basem ent Sterile R oom

06 04 0132 W aterflow 12th Floor W est Stair #3

06 04 0133 Valve Tam per 12th FlrW est Stair #3

06 02 0134

W aterflow

11th Floor W est Stair #3

06 02 0135

Valve Tam per 11th FlrW est Stair #3

04 0133

W aterflow

10th Floor W est Stair #3

05 04 0134

Valve Tam per 10th FlrW est Stair #3

05 02 0134 W aterflow 9th Floor W est Stair #3

05 02 0135 Valve Tam per 9th Flr W est Stair #3

04 05 0134

W aterflow

8th Floor W est Stair #3

Attachm ent "D

Q uarterly Flow and Tam per W ork Sheet for Building 4500

Main drain Valve PSI

D evice

D evice D escription

Checked Confirm Shut Open

04 05 0135

Valve Tam per 8th Flr W est Stair #3

04 04 0134 W aterflow 7th Floor W est Stair #3

04 04 0135 Valve Tam per 7th Flr W est Stair #3

04 02 0135

W aterflow

6th Floor W est Stair #3

04 02 0136

Valve Tam per 6th Flr W est Stair #3

03 04 0133 W aterflow 5th Floor W est Stair #3

03 04 0134 Valve Tam per 5th Flr W est Stair #3

03 02 0138

W aterflow

4th Floor W est Stair #3

03 02 0139

Valve Tam per 4th Flr W est Stair #3

02 05 0160 W aterflow 3rd Tow er Stair #3

02 05 0161 Valve Tam per 3rd Flr Tow er Stair #3

02 03 0134

W aterflow

G rnd Tow er Stair #3

02 03 0135 Valve Tam per G rnd Tw rStair #3

01 04 0142 W aterflow 1 Basem ent Stair #3

01 04 0143 Valve Tam p 1 Basem entStair #3

01 04 0144

W aterflow

2 Basem ent Stair #3

01 04 0145

Valve Tam p 2 Basem entStair #3

01 02 0139 W aterflow Basem ent Soiled Linen 1-70

01 02 0140 Valve Tam per Basem entSoiled Linen 1-70

01 02 0141

Low AirBasem ent Soiled Linen

1-70

01 02 0142 W aterflow Basem ent M ed Storage 1-93

01 02 0143 Valve Tam per Basem entM ed Storage 1-93

01 04 0135 Valve Tam per Basem entPum p R oom

1-114

01 04 0148 Valve Tam p 1 Basem entPum p R oom

1-114

01 04 0149 Valve Tam p 2 Basem entPum p R oom

1-114

01 04 0150 Valve Tam per Basem entPum p R oom

1-114 PC

01 04 0151

Valve Tam per Basem entPum p R oom

PC

01 04 0132 Valve Tam per Basem entC om pressor R oom 1-110

01 04 0138

W aterflow

1 Basem ent Sterile R oom

01 04 0139

Valve Tam p 1 Basem entSterile R oom

01 04 0141

Valve Tam p 2 Basem entSterile R oom

02 04 0132

W aterflow

3rd C linic Stair #2

02 04 0133

Valve Tam per 3rd Flr C linic N orth Stair #2

02 02 0165

W aterflow

G rnd Floor C linic N orth Stair #2

02 02 0166

Valve Tam per G rnd FlrC linic N orth Stair #2

01 02 0133 W aterflow Basem ent N orth Stair #2

01 02 0134

Valve Tam per Basem entN orth Stair #2Page 2 of 4

Attachm ent "D

Q uarterly Flow and Tam per W ork Sheet for Building 4500

Main drain Valve PSI

D evice

D evice D escription

Checked Confirm Shut Open

01 02 0135

W aterflow

Basem ent N ucM ed 1-9 East

01 02 0136 Valve Tam per Basem entN ucM ed 1-9 East

01 02 0137

W aterflow

Basem ent C enter Stair #6

01 02 0138

Valve Tam per Basem entC enter Stair #6

02 02 0167

W aterflow

G rnd Floor C linic South Stair #1

02 02 0168 Valve Tam per G rnd FlrSouth Stair #1

02 02 0169

W aterflow

3rd Flr C linic South Stair#1

02 04 0177 Valve Tam per 3rd Flr C linic South Stair #2

02 02 0170

Valve Tam per 3rd Flr C linic South Stair #1

01 02 0145 Backflow

#1 3rd FloorSouth Side

01 02 0146 Backflow

#2 3rd FloorSouth side

01 02 0147

PIV

3rd Floor

South Side

01 04 0166

PIV

G round Floor

N orth Side

Parking

01 04 0167 Backflow

1 G rnd FloorN orth Side Parking

01 04 0168 Backflow

2 G rnd FloorN orth Side Parking

03 02 0140 W aterflow 4th Floor Kitchen Stair #5

03 02 0141

Valve Tam per 4th Flr Kitchen Stair #5

02 05 0154

W aterflow

3rd J-Sect Stair #5

02 05 0155 Valve Tam per 3rd Flr J-SectStair #5

02 05 0151 W aterflow 3rd J-Sect R iser R oom

02 05 0152

Valve Tam p 3rd J-SectR iser R oom

02 05 0153

Low Air 3rd J-Sect R iser R oom

02 05 0156

W aterflow

3rd J-Sect C onference R oom 3-259

02 05 0157

Valve Tam p 3rd J-SectC onference R oom

3-259

02 04 0134 W aterflow C linic R oofM echanical R oom

02 04 0135

Valve Tam per C linic R oof M echanical R oom

03 04 0130

W aterflow

5th FloorPArts Area 5-8A

03 04 0131 Valve Tam per 5th Flr Parts Area 5-8A

03 04 0132 Low

Air5th Floor

Parts Area 5-8A

03 04 0135 W aterflow 5th Floor W est Storage 5-1A

03 04 0136 Valve Tam per 5th Flr W est Storage 5-1A

04 0137 Low

Air5th Floor

W est Storage

5-1A

W aterflow

M onaco XM

TR

R elay

Valve Tam per M onaco XM

TR

R elay

01 04 0146

Pum p

R un

Basem ent

Pum p R oom 1-114

01 04 0147

Pum p Trouble Basem entPum p R oom 1-114

Fire pum p m ain drain test. R eturn to original (nonflow ing) pressure less than tw o sec.

Attachm ent "D

Q uarterly Flow and Tam per W ork Sheet for Building 4500

Main drain Valve PSI

D evice

D evice D escription

Checked Confirm Shut Open

D eficiency N otes *** (77) 01 02 0137 G age psi sam e as (99) 02 04 0134 & (75) 01 02 0135 G age psi sam e as (73) 01 02 0133 &

(58) 01 02 0142 G age sam e as (79) 02 02 167 & (28) 01 04 0140 G age sam e as (66) 01 04 0138 T indicates tested and I indicates inspected -Light red 1st and 3rd Q uarter light blue 2nd and 4th quarter

Attachm ent “E”

The last standpipe test w as done April 2016. A copy of the prior testing results below

A ttachm ent “F” T esting Protocols

1.

A rrive at the building to do the w ork.

2.

M ake personalcontactw ith N

C O

IC

and have them announce overpublic addresssystem thatyou w illbe testing the fire alarm system and w ill announce w hen the testing is com plete.

6.

A sk the N C

O

IC

to use his / her phone to call fire departm ent.

7.

C all Fort Jackson Fire D epartm ent (FJFD ) dispatcher at 751-4142 and tell him

/ her w hat you are doing, and you w illcall w hen testing is com plete. A sk dispatcher to m onitor alarm signals received from building.

8.

Perform fire alarm and sprinklertesting.

9.

N otify N C

O

IC

that testing is com plete. H ave him / her m ake announcem ent.

10.

C all FJFD dispatcher and inform them that test is com plete. V erify that they received signals through the M onaco transm itter. R ecord this on your report.

11.

Leave a copy of pm docum entation at fire alarm panel, and send m e a copy for ourfile.

12.

If repairs are required, call us during testing if it’s som ething m inor that can be done during the sam e visit. If itis som ething m ajor, you m ay contact m e later so w e can discuss repairs and cost.

Phone num bers (all are 803-751-X

X X

X

FJFD

D ispatcher 4142 / 7217

B ldg. 1890 PES

N C

IO

C

SFC

B risco 6251 Front D esk

2021 / 3105

B ldg. 4323 O liver D C

N

IO

C

SG

T Salley 4226 Front D esk

6418 / 6679

B ldg. 4575 TM

IO

C

SSG

D inkins 6383 Front D esk 6789 / 4733 / 7444

B ldg. 4590 C aldw ell D

O

IC

SSG

M cC all 5278

Front D esk

5178 / 5529 / 6017

B ldg. 5330 H agen D C

N C

IO

C

SG

T B lash 7380 FrontD esk

6211 / 3255 / 4091

B ldg. 4555 Sick

Q uarters

B ldg. 2500 W arehouse

B ldg. 2445 V et C linic

Attachm ent "G

Safety R equirm ents for an Im paired System

F ire &

L ife Sa fety Sy stem Im p a irm en t P erm it/T a g (P lease attach tag to Fire D e p artm e n t C on n e ction o r Fire

A larm

A n n un ciato r/C o n tro l P an e l)

B uild in g

N am e:

T yp e o fsystem im p aired

R e aso n fo r im p airm en t:

E xte nto fim p airm en t:

D ate system shuto ff:

E xp ected d ate o fre sto ration

Im p airm en t auth o rized b y:

cam p us p o lice

Sch ed u le B

Im p a irm en t W ork sh eet ore In form a tion

T od ay’s d ate

B ld g

T yp e o f system im p aired

E xte nt o f im p airm en t:

R e aso n fo r im p airm t:

im p airm en t to b eg in

E stim ated co m p le tio n d

P rson

(s) co nd ucting w o rk rson re sp o nsib le fo r m oun ting im p airm e nt tag

Fire w atch re q uired

If ye s, num b e r o f p e rson s:

em in d ers A re a in sp ecte d and risks d ete rm ine d ro h ib ition s in volved

B uild in g e vacuated

Im p airm en t tag issued o tifica tion s H as facilities m echanic b een n otified o f the im p airm t?

H as m o n ito rin g com p any, if an y, b e en no tified of the im p airm e n as the m ain ten an ce sup e rviso r fo r the affe cted b uild ing b ee n n o tified f the im p airm estoration affe cted system b e e n in sp e cted an d te ste d op e ratio n al?

im p airm e nt tag b e e n rem oved cam p us p olice b e e n n o tifie d o f th e re sto ratio n , if a fire alarm syste m fire alarm m on ito ring com p an y(if an

y) b e e n n otified o f the re storation m ain ten an ce sup e rviso r fo r the affe cted b uild ing b ee n n o tified f the re sto ration

Sch ed u le C

F irew a tch

L og

Sh eet a te N a m e(s) T im e

A rea

C h eck ed

Please return this form to Fire Protection M anag er at Facilities M anag ent.

T E

C H

N

IC

A L

E X

H

IB

IT

D E

L

IV

E R

A B

L E

S SC

H

E D

U L

E

D eliverable

Frequency # of C opies M edium /Form at Subm it To

IA

W

PW

S 1.6.11 K ey Personnel; The

C ontractor shall provide at least tw o points of contact w ithin the com pany to interface w ith the

C O

R on issues concerning sprinkler m aintenance, inspection, and testing service.

N am es, business address, phone num bers and hours of operation are the m inim um inform ation requirem ent. The C ontractor shall also provide an afterhours nam e and telephone for em ergency contact.

C ontractor shall provide a point of contact inform ation for 24 hours a day/ 7 days a w eek em ergency service.

O nce, before the

1st day of w ork perform ance and additionally w ithin 3 days of changes to key personnel or staffing arrangem ents that m ay affect the accuracy of the initial docum ent.

O ne (1) hard copy and one (1) electronic copy.

W ord/Excel

The C O

R

IA

W

PW

S 1.6.18

Installation A ccess;

“The contractor shall also provide all inform ation required for background checks to m eet installation access requirem ents to be accom plished by the installation Provost M arshal O ffice, D irector of

Em ergency Services, or Security O ffice.

The contractor w orkforce m ust com ply w ith all

IA

W section 1.6.18

PW

S.

IA

W section

1.6.18 PW

S

IA

W section 1.6.18

PW

S

IA

W section 1.6.18

PW

S

D eliverable

Frequency # of C opies M edium /Form at Subm it To personal identity verification requirem ents as directed by D oD

H Q

D A

, and/or local policy.”

IA

W

PW

S 5.1-5.2

B asic Services;

A ttachm ents A -G of this PW

S.

W eekly, Q uarterly A nnually and as specified by applicable codes and regulations and at the tim e ofservice.

1 D igitally signed copy (em ail) or hard copy

IA

W

A ttachm ents A

-G of the PW

S.

Subm it to Inspectors:

W endell Fralix, D oug

D riggers

H ow ard D ow d

IA

W

PW

S 5.6

“A ll bids for this contract m ust include a firm and binding hourly rate for each of the three type calls, routine, urgent, and em ergency.”

Included w ith the

B id.

1 D igital C opy (em ail) W ord/Excel A s stated in the R

FQ

IA

W

PW

S 5.7;

A statem ent shall be provided by the contractor agreeing to allow the inspection of these facilities by the G overnm ent.

B efore the first day of the contract.

1 D igitally signed copy (em ail) or 1 hard copy

W ord/Excel

Subm it to Inspectors:

W endell Fralix, D oug D riggers H ow ard D ow d

IA

W

PW

S 5.10; The

C ontractor shall provide the G overnm ent w ith all trace docum entation of the w aste disposal, upon request.

U pon request

1 H ard C opy O r 1 D igital

C opy (em ail)

In W riting and IA

W

South C arolina

H azardous W aste M anagem ent

R egulations, as regulated by the South C arolina D epartm ent of

H ealth and

Environm ental

C ontrol

Subm it to Inspectors:

W endell Fralix, D oug D riggers H ow ard D ow d

D eliverable

Frequency # of C opies M edium /Form at Subm it To

IA

W

PW

S 5.11;

M aterial Safety D ata

Sheets (M

SD

S) on all applicable substances brought on site.

Stated tw ice in

PW

S; 5.11 &

5.16.3.1

Should be listed as

SD

S

Initially, once w ith all substances expected to be brought on site for routine m aintenance and repairs. U pon arrival w ith any new substance and as requested. A ll SD S’s shall be kept by the contractor in accordance w ith

EM

385-1-1.

Electronic C opies, H ard

C opies w hen requested.

Per O

SH

A Standards and R egulations.

Subm it to C

O R

IA

W

PW

S 5.13.2

Test docum entation gathered at tim e of service w ill be turned over to the site inspectors.

A t the tim e of service.

1 H ard C opy O r 1 D igital

C opy (em ail)

A s directed by the specified PW

S for the test being perform ed.

Subm it to Inspectors:

W endell Fralix, D oug D riggers H ow ard D ow d

IA

W

PW

S 5.14.1;

Subm ission of a w ork plan is required.

Prior to beginning the project.

1 D igital C opy (em ail) W ord/Excel and

IA

W

PW

S 5.14.1.

Subm it to C O

R

IA

W

PW

S 5.15.1;

“The C ontractor w ill need to provide a signed copy of our pre-construction safety agreem ent at this m eeting.”

A t the pre-contract and safety training m eeting approxim ately 2 w eeks before the start of contract.

1 H ard C opy O r 1 D igital

C opy (em ail)

W ord/Excel

Subm it to C

O R

IA

W

PW

S 5.21

C ontractor

M anpow er R eporting (C M

R

IA

W

PW

S 5.21

C ontractor

M anpow er R eporting (C M

R

IA

W

PW

S 5.21

C ontractor

M anpow er R eporting (C M

R

IA

W

PW

S 5.21

C ontractor

M anpow er R eporting (C M

R

IA

W

PW

S

5.21 C

ontractor M anpow er R eporting (C

M

T E

C H

N

IC

A L

E X

H

IB

IT

Perform ance R equirem ents Sum m ary

The contractor service requirem ents are sum m arized into perform ance objectives that relate directly to m ission essential item

s. The perform ance threshold briefly describes the m inim um acceptable levels of service required for each requirem ent. These thresholds are critical to m ission success.

Perform ance O bjective

(IA

W

= In A ccordance W ith)

(PW

S=Perform ance W ork Statem ent)

Perform ance Standard

Perform ance T hreshold (This is the m axim um error rate. It could possibly be “Zero deviation from standard”)

Incentives/ D isincentives

PR

S #1

IA

W

Part 5 section 5.1 of the

PW

S; The C ontractor shall provide sprinkler m aintenance, inspection, and testing service for the M

A H

C . C ontractor shall provide both scheduled and em ergency service to M A

H C

’s Fire Sprinkler System

(FSS) as described w ithin this PW S. The

Service to the specified equipm ent shall m eet or exceed all applicable regulatory and m anufacturer'srequirem ents.

In addition, the C ontractor is responsible for the perform ance of m onthly Fire (FSS) tests as outlined in A ttachm ents A -G and IA W all applicable N

FPA

codes and regulations for the equipm ent listed below including their ancillary com ponents,parts, and devices, etc. In conjunction w ith com pleting the specified service

IA

W applicable N

FPA

rules and regulations; The attached eight checklists of this PW

S shall be perform ed on the specified equipm ent.

The contractor supplied Fire sprinkler m aintenance, inspection, and testing service in accordance w ith the PW S 5.1.

The contractor supplied both scheduled and em ergency fire sprinkler m aintenance, inspection, and testing services to the sprinkler piping, fire pum p, associated equipm ent, and Fire

Sprinkler System (FSS) w hich m et or exceeded all regulatory and m anufacturer requirem ents.

The contractor utilized and subm itted com pleted checklists as specified in attachm ents A

-G of the PW

S.

The contractor perform ed the scheduled and preventative m aintenance IA

W applicable Federal, State and Local codes and regulations.

The contractor w as present during the perform ance of each m onthly Fire System s Test (FSS) as outlined in A ttachm ents A

-G of the PW

S.

Zero D eviation from

Standard

In the event that the perform ance threshold is not m et; The C ontractor shall re-perform and/or com plete w ithin 30 days of a w ritten corrective action, any and all tasks related to non-perform ance issues at no cost to the Federal G overnm ent.

In the event that the Perform ance Threshold has not been satisfactorily m et after the 30 days, the Federal G overnm ent m ay at their discretion;

1.Issue a tim e extension of the notice to com plete the corrective action or

2.H ire a 3rd party to com plete the corrective action and deduct thecost from the C ontractors m onthly paym

PR

S #2

IA

W

PW

S 1.6.4; The contractor is responsible for conducting business, betw een the hours of 0730-1530 M onday thru Friday except Federal holidays or w hen the G overnm ent facility is closed due to local or national em ergencies, adm inistrative closings, or sim ilar G overnm ent directed facility closings section The C ontractor m ust, at all tim es, m aintain an adequate w orkforce for the uninterrupted perform ance of all tasks defined w ithin this PW S w hen the G overnm ent facility is not closed for the above reasons.

The contractor conducted business betw een the hours or 0730-1530 and m aintained an adequate w orkforce for the uninterrupted perform ance of all tasks defined w ithin PW

S-1.6.4.

PR

S #3

IA

W

PW

S 1.6.9; The

C ontracting O fficer, C ontracting O fficers

R epresentative (C

O R

), and other G overnm ent personnel, as appropriate, m ay m eet periodically w ith the C ontractor to review the C ontractor's perform ance. A t these m eetings, the C ontracting O fficer w ill apprise the C ontractor of how the G overnm ent view s the C ontractor's perform ance and the C ontractor w ill apprise the G overnm ent of problem s, if any, being experienced.

A ppropriate action shall be taken to resolve outstanding issues.These m eetings shall be at no additional cost to the G overnm ent.

In accordance w ith PW

S 1.6.9; The contractor, at no cost to thegovernm ent, attended contractor perform ance m eeting and took appropriate action to resolve outstanding issues that they w ere apprised of.

M onthly Paym ent m ay be w ithheld until docum entation has been provided.

PR

S #4

IA

W

PW

S 1.6.11 K ey Personnel; The C ontractor shall provide at least tw o points of contact w ithin the com pany to interface w ith the C

O R on issues concerning sprinkler m aintenance, inspection, and testing service. N am es, business address, phone num bers and hours of operation are the m inim um inform ation requirem ent. The C ontractor shall also provide an afterhours nam e and telephone for em ergency contact. C ontractor shall provide a point of contact inform ation for 24 hours a day/ 7 days a w eek em ergency service.

In A ccordance w ith PW S section 1.6.11 the contractor provided tw o points of contact w ithin the com pany to interface w ith the C O

R on issues concerning sprinkler m aintenance, inspection, and testing service.

The C ontractor also provided an after-hours nam e and telephone num ber for a 24 hours a day/7days a w eek em ergency contact.

PR

S #5

IA

W

PW

S 1.6.12 Identification of C ontractor Em ployees; A ll

C ontractor personnel attending m eetings, answ ering G overnm ent telephones, and w orking in other situations w here their C ontractor status is not obvious to third parties are required to identify them selves as such to avoid creating an im pression in the m inds of m em bers of the public that they are G overnm ent officials. They m ust also ensure that all docum ents or reports produced by C ontractors are suitably m arked as C ontractor products or that C ontractor participation is appropriately disclosed.

In A ccordance w ith PW S section 1.6.12

Identification of C ontractor Em ployees;

The contractor and their em ployees appropriately disclosed and identified them selves as contractors w hile in com m unication w ith G overnm ent personnel and ensured that all docum ents or reports produced w ere m arked as contractor products.

PR

S #6

IA

W

PW

S 1.6.18; The contractor and all associated subcontractors’ em ployees shall com ply w ith applicable installation, facility, and area com m ander installation and facility access and local security policies and procedures (provided by the G overnm ent representative). The contractor shall also provide all inform ation required for background checks to m eet installation access requirem ents to be accom plished by the installation Provost M arshal O ffice, D irector of Em ergency Services, or Security O ffice.

The contractor w orkforce m ust com ply w ith all personal identity verification requirem ents as directed by D oD , H

Q D

A , and/or local policy.

In accordance w ith PW

S section 1.6.18;

The contractor and all associated subcontractors’ em ployees com plied w ith applicable installation, facility, and area com m ander installation and facility access and local security policies and procedures (provided by the G overnm ent representative).

The contractor provided all inform ation required for background checks to m eet installation access requirem ents.

The contractor w orkforce com plied w ith all personal identity verification require m ents as directed by D oD

H

Q D

A , and/or local policy.

ontractor em ployees w ho fail to m eet facility access and local security policies and procedures w ill be denied access to the w orksite. D enial or rem oval of any contractor em ployee shall not affect the contractor obligations of the specified w ork perform ance and/or w ork schedule as outlined in the PW

S. U nder no circum stances shall the

Federal G overnm ent be liable for costs incurred by the contractor for em ployees w ho are denied access to the w orksite.

PR

S #7

IA

W

PW

S 5.5; The C ontractor shall be responsible for em ergency calls that the governm ent staff is unable to respond per PW

S 5.5.

In accordance w ith PW

S section 5.5;

The C ontractor responded to em ergency calls that the governm ent staff w as unable to respond to.

PR

S #8

IA

W

PW

S 5.6; The C ontractor is responsible for responding to all facility calls for non-scheduled service. N on-scheduled service shall be broken into the categories of routine, urgent and em ergency.

R outine service calls shall require an on-site response w ithin 5 business days of receiving the trouble call (excluding all federal holidays).

The on-site response tim e for urgent repairs shall be w ithin 4 hours of receiving the trouble call. The on-site response tim e for em ergency calls (total equipm ent failure) shall be w ithin 1 hour of receiving the trouble call. The C ontractor is responsible for responding to all service calls. A ll bids for this contract m ust include a firm and binding hourly rate for each of the three type calls, routine, urgent, and em ergency.

IA

W w ith section PW

S 5.6 The C ontractor provided categories of routine, urgent and em ergency calls and related response tim es and hourly rates.

The contractor m et and or exceeded routine, urgent and em ergency calls w ithin the specified response tim es and hourly rates.

Standard for urgent and ergency calls.

PR

S #9

IA

W

PW

S 5.8; The annual

A utom atic Transfer Sw itch &

G enerator testing is not part of this PW

S and w ill be perform ed by an 3 rdparty authorized A

SC

O service provider.

The fire pum p testing is part of this PW S and shall be tested in conjunction w ith the June generator test w hich is norm ally done at 1700 hours on the first Thursday of each m onth.

It is the obligation of the contractor to ensure that qualified technicians are on site and capable of perform ing the fire pum p test sim ultaneously w ith the generator testing.

The contractor tested the fire pum p in conjunction w ith the June generator test.

Failure to com plete the fire pum p testing in conjunction w ith the generator and autom atic transfer sw itch testing m ay result in rescheduling and retesting all com ponents sim ultaneously. The contractor shall be liable for all costs incurred by retesting due to failure of to perform the fire pum p testing at the scheduled tim

e. These costs m ay include, but are not lim ited to, the fire pum p, generator, and autom atic transfer sw itch testing.

These costs, if incurred, w ill be deducted from the contractor’s m onthly paym ent.

R etesting shall be at no cost to the Federal G overnm

PR

S #10

IA

W

PW

S 5.11; The C ontractor shall supply the clinic w ith Safety D ata Sheets (SD S) on all applicable substances brought on site.

IA

W the PW S 5.11; The C ontractor provided the clinic w ith Safety D ata

Sheets (SD S) on all applicable substances brought on site.

A ny substance not identifiable and/or w ithout an approved SD S shall be rem oved from site im ediately. A ny costs incurred shall be deducted from the contractor’s m onthly invoice.

PR

S #11

IA

W

PW

S 5.15.1; The

C ontractor w ill be required to attend a pre-contract m eeting and safety training approxim ately 2 w eeks prior to the start of w ork. The

C ontractor w ill need to provide a signed copy of the governm ents pre-construction safety agreem ent at this m eeting. A copy of the pre-construction safety agreem ent is available in electronic W ord form at upon request.

IA

W the PW S 5.15.1 the C ontractor attended a pre-contract m eeting and safety training. The C ontractor provided a signed copy of our pre-construction safety agreem ent at this m eeting.

IA

W

PW

S 5.15.5 C ontractors w ill be required to w ear visitor badges and sign in and out w hile w orking in the building.

The C ontractor shall notify one of the personnel listed in paragraph 5.14.1 each day prior to beginning w ork.

IA

W

PW

S 5.15.5 the contractors w ore visitor badges and signed in and out w hile w orking in the building.

Th e C ontractor notified one of the personnel listed in paragraph 5.14.1 each day prior to beginning w ork.

IA

W

PW

S 5.18

O C

C U

PA

TIO

N A

L SA

FETY

A

D

H

EA

LTH

: The

C ontractor shall com ply w ith the O ccupational Safety and

H ealth A ct (O

SH

A ) as w ell as applicable EM

385 1-1 rules and regulations. The C ontractor shall be responsible forensuring adherence to all applicable Installation, State of South C arolina, and Federal rules and regulations.

The C ontractor has com plied w ith all applicable regulations of the O ccupational Safety and H ealth A ct (O

SH

A

The C ontractor has com plied w ith all applicable rules and regulations of the A rm y C orp of Engineers EM 385 1-1

Failure to com ply w ith all safety rules and regulations as specified in the PW

S w ill result in rem oval of contractor personnel from the installation until such tim e as the contractor can dem onstrate that com pliance to the rules and regulations can be et.

File details come from the government source that posted it. Updated .