Attachment 2 - A-G PRS Deliverables 20220913.pdf
PDF 510 KB Posted
- Solicitation number
- W9124C-23-R-0009
About this file
This presolicitation notice seeks fire sprinkler and fire alarm maintenance, inspection, and testing services. The services are required at the Moncrief Army Health Clinic on Fort Jackson in South Carolina. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other non-personal services necessary to perform the work. A draft performance work statement and associated attachments included provide additional details on the required capabilities. The NAICS code is 561621 with a small business size standard of $22 million. The product service code is H912. The period of performance consists of a base year plus four 12-month option periods starting in December 2022. The contract type will be firm fixed price. The proposed contract may include service contract labor categories.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9124C23R0009v3.docx | DOCX document | |
| Attachment 1 - Draft Fire Alarm Sprinkler Testing PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draft Attachment "A"
Building List Installation Asset No. Asset Street City zip Sprinkler Fire Alarm
1 Fort Jackson 4575 McWethy Troop Medical Clinic Stuart Street Fort Jackson 29207 Yes Simplex 4100U 2 Fort Jackson 1890 Physical Examination Station Washington Road Fort Jackson 29207 Yes Simplex 4002 3 Fort Jackson 4590 Caldwell Dental Clinic Strom Thurmond Blvd Fort Jackson 29207 Yes Simplex 4010 4 Fort Jackson 4323 Oliver Dental Clinic Hill Street Fort Jackson 29207 Yes Simplex 4100U 5 Fort Jackson 5330 Hagen Dental Clinic Moseby Street Fort Jackson 29207 Yes Simplex 4020 6 Fort Jackson D2445 Vet Facility Knight Road Fort Jackson 29207 Yes EST-3 7 Fort Jackson 4500 Moncrief Army Community Hospital Stuart Street Fort Jackson 29207 Yes EST-3 8 Fort Jackson 4503 Boiler Plant Stuart Street Fort Jackson 29207 No EST-3 9 Fort Jackson 4504 Chiller Plant Stuart Street Fort Jackson 29207 No EST-3
10 Fort Jackson 2498 Vet Admin Knight Road Fort Jackson 29207 No EST-3 DPW maintains all Monacos
Contract covers Sprinkler and Fire Alarm in all Bldgs except the Fire Alarm in Bldg. 4500
D raft
O utbuildings Device Testing List
This contract includes, but is not lim ited to, the follow ing devices.
Type
Total Sprinkler Flow /Tam per Total Fire Alarm
Building
Duct Sm oke Detector
Heat Detector
Photo Sm oke Detector
Pull Station-Single Action
Alarm Indicating device
Fire Alarm Panel
Control Valve (PIV)
Backflow
(O S&
Y)
City Connection
Inspectors test
Alarm received flow test
Type Total Sprinkler Flow
/Tam oke Detector
Heat Detector
Photo Sm oke Detector
Pull Station-Single Action
Alarm
Indicating device
Fire Alarm
Panel
Control Valve (PIV)
Backflow (O
S& Y)
City Connection
Inspectors test
Alarm received flow test
Type
Total Sprinkler Flow /Tam oke Detector
Heat Detector
Photo Sm oke Detector
Pull Station-Single Action
Alarm Indicating device
Fire Alarm Panel
Control Valve (PIV)
Backflow
(O S&
Y)
City Connection
Butterfly
Inspectors test
Alarm received flow test
Type
Total Sprinkler Flow /Tam oke Detector
Heat Detector
Photo Sm oke Detector
Pull Station-Single Action
Alarm Indicating device
Fire Alarm Panel
Control Valve (PIV)
O utbuildings Device Testing List
This contract includes, but is not lim ited to, the follow ing devices.
Backflow
(O S&
Y)
Control Valve (Butterfly)
City Connection
Inspectors test
Alarm received flow test
Supervised Tam per Signals
Type
Total Sprinkler Flow /Tam oke Detector
Heat Detector
Photo Sm oke Detector
Pull Station-Single Action
Alarm Indicating device
Fire Alarm Panel
Control Valve (PIV)
Backflow
(O S&
Y)
Control Valve (Butterfly)
City Connection
Inspectors test
Alarm received flow test
Supervised Tam per Signals
Type
Total Sprinkler Flow /Tam oke Detector
Heat Detector
Photo Sm oke Detector
Pull Station-Single Action
Alarm Indicating device
Fire Control Panel (LO C,M
NS,FACP,FAAP)
Control Valve (PIV)
Backflow (O
S& Y)
Control Valve (Butterfly)
City Connection
Inspectors test
Alarm received flow test
Supervised Tam per Signals
Type Total Sprinkler Flow
/Tam oke Detector
Heat Detector
Photo Sm oke Detector
Pull Station-Single Action
Alarm
Indicating device
Fire Alarm
Panel
Type
Total Sprinkler Flow /Tam oke Detector
Heat Detector
O utbuildings Device Testing List
This contract includes, but is not lim ited to, the follow ing devices.
Photo Sm oke Detector
Pull Station-Single Action
Alarm Indicating device
Fire Alarm Panel
Type Total Sprinkler Flow
/Tam oke Detector
Heat Detector
Photo Sm oke Detector
Pull Station-Single Action
Alarm
Indicating device
Fire Alarm
Panel
Draft MACH Fire Pump 15 Jul 2011
Log. (System/Presure/Flow)
System/Presure/Flow
Attachment "C" Fire Pump Test Sheet
Sprinkler Demand
1000 1770 65 Combined Curve 1500 1770 43 System/Presure/Flow
Factory/Presure/Flow
P 130 r e 120 s u r 100
Hose Suction
PSI
Discharge
PSI
Pitot
PSI GPM Total GPM RPM NET PSI
Churn 113 185 0 0 0 1791 72 1 104 172 32 504 504 1783 68 2 80 145 32,32 504,504 1008 1773 65 3 70 125 22,28,24 430,433,472 1335 1768 55
0 75
Attachm ent "D
Q uarterly Flow and Tam per W ork Sheet for Building 4500
Main drain Valve PSI
D evice
D evice D escription
Checked Confirm Shut Open
06 05 0135
W aterflow
Penthouse Level C enter
06 05 0136
Valve Tam per C enter Penthouse
06 05 0137
W aterflow
Penthouse Level W est
06 05 0138
Valve Tam perW est
Penthouse
06 04 0154 Valve Tam per 12th FlrEast Stair #4
06 04 0131 Valve Tam per 12th FlrEast Stair #4
06 04 0130 W aterflow 12th Floor East Stair #4
06 02 0132
W aterflow
11th Floor East Stair #4
06 02 0133 Valve Tam per 11th FlrEast Stair #4
05 04 0131 W aterflow 10th Floor East Stair #4
05 04 0132
Valve Tam per 10th FlrEast Stair #4
05 02 0132
W aterflow
9th Floor East Stair #4
05 02 0133 Valve Tam per 9th Flr East Stair #4
04 05 0132 W aterflow 8th Floor East Stair #4
04 05 0133
Valve Tam per 8th Flr East Stair #4
04 04 0132
W aterflow
7th Floor East Stair #4
04 04 0133 Valve Tam per 7th Flr East Stair #4
04 02 0133 W aterflow 6th Floor East Stair #4
04 02 0134
Valve Tam per 6th Flr East Stair #4
03 04 0128
W aterflow
5th Floor East Stair #4
03 04 0129 Valve Tam per 5th Flr East Stair #4
03 02 0136 W aterflow 4th Floor East Stair #4
03 02 0137
Valve Tam per 4th Flr East Stair #4
02 05 0158
W aterflow
3rd Tow er Stair #4
02 05 0159
Valve Tam per 3rd Flr Tow er Stair #4
02 03 0136 W aterflow G rnd Tow erStair #4
02 03 0137
Valve Tam per G rnd Tw rStair #4
01 04 0140
W aterflow
2 Basem ent Sterile R oom
06 04 0132 W aterflow 12th Floor W est Stair #3
06 04 0133 Valve Tam per 12th FlrW est Stair #3
06 02 0134
W aterflow
11th Floor W est Stair #3
06 02 0135
Valve Tam per 11th FlrW est Stair #3
04 0133
W aterflow
10th Floor W est Stair #3
05 04 0134
Valve Tam per 10th FlrW est Stair #3
05 02 0134 W aterflow 9th Floor W est Stair #3
05 02 0135 Valve Tam per 9th Flr W est Stair #3
04 05 0134
W aterflow
8th Floor W est Stair #3
Attachm ent "D
Q uarterly Flow and Tam per W ork Sheet for Building 4500
Main drain Valve PSI
D evice
D evice D escription
Checked Confirm Shut Open
04 05 0135
Valve Tam per 8th Flr W est Stair #3
04 04 0134 W aterflow 7th Floor W est Stair #3
04 04 0135 Valve Tam per 7th Flr W est Stair #3
04 02 0135
W aterflow
6th Floor W est Stair #3
04 02 0136
Valve Tam per 6th Flr W est Stair #3
03 04 0133 W aterflow 5th Floor W est Stair #3
03 04 0134 Valve Tam per 5th Flr W est Stair #3
03 02 0138
W aterflow
4th Floor W est Stair #3
03 02 0139
Valve Tam per 4th Flr W est Stair #3
02 05 0160 W aterflow 3rd Tow er Stair #3
02 05 0161 Valve Tam per 3rd Flr Tow er Stair #3
02 03 0134
W aterflow
G rnd Tow er Stair #3
02 03 0135 Valve Tam per G rnd Tw rStair #3
01 04 0142 W aterflow 1 Basem ent Stair #3
01 04 0143 Valve Tam p 1 Basem entStair #3
01 04 0144
W aterflow
2 Basem ent Stair #3
01 04 0145
Valve Tam p 2 Basem entStair #3
01 02 0139 W aterflow Basem ent Soiled Linen 1-70
01 02 0140 Valve Tam per Basem entSoiled Linen 1-70
01 02 0141
Low AirBasem ent Soiled Linen
1-70
01 02 0142 W aterflow Basem ent M ed Storage 1-93
01 02 0143 Valve Tam per Basem entM ed Storage 1-93
01 04 0135 Valve Tam per Basem entPum p R oom
1-114
01 04 0148 Valve Tam p 1 Basem entPum p R oom
1-114
01 04 0149 Valve Tam p 2 Basem entPum p R oom
1-114
01 04 0150 Valve Tam per Basem entPum p R oom
1-114 PC
01 04 0151
Valve Tam per Basem entPum p R oom
PC
01 04 0132 Valve Tam per Basem entC om pressor R oom 1-110
01 04 0138
W aterflow
1 Basem ent Sterile R oom
01 04 0139
Valve Tam p 1 Basem entSterile R oom
01 04 0141
Valve Tam p 2 Basem entSterile R oom
02 04 0132
W aterflow
3rd C linic Stair #2
02 04 0133
Valve Tam per 3rd Flr C linic N orth Stair #2
02 02 0165
W aterflow
G rnd Floor C linic N orth Stair #2
02 02 0166
Valve Tam per G rnd FlrC linic N orth Stair #2
01 02 0133 W aterflow Basem ent N orth Stair #2
01 02 0134
Valve Tam per Basem entN orth Stair #2Page 2 of 4
Attachm ent "D
Q uarterly Flow and Tam per W ork Sheet for Building 4500
Main drain Valve PSI
D evice
D evice D escription
Checked Confirm Shut Open
01 02 0135
W aterflow
Basem ent N ucM ed 1-9 East
01 02 0136 Valve Tam per Basem entN ucM ed 1-9 East
01 02 0137
W aterflow
Basem ent C enter Stair #6
01 02 0138
Valve Tam per Basem entC enter Stair #6
02 02 0167
W aterflow
G rnd Floor C linic South Stair #1
02 02 0168 Valve Tam per G rnd FlrSouth Stair #1
02 02 0169
W aterflow
3rd Flr C linic South Stair#1
02 04 0177 Valve Tam per 3rd Flr C linic South Stair #2
02 02 0170
Valve Tam per 3rd Flr C linic South Stair #1
01 02 0145 Backflow
#1 3rd FloorSouth Side
01 02 0146 Backflow
#2 3rd FloorSouth side
01 02 0147
PIV
3rd Floor
South Side
01 04 0166
PIV
G round Floor
N orth Side
Parking
01 04 0167 Backflow
1 G rnd FloorN orth Side Parking
01 04 0168 Backflow
2 G rnd FloorN orth Side Parking
03 02 0140 W aterflow 4th Floor Kitchen Stair #5
03 02 0141
Valve Tam per 4th Flr Kitchen Stair #5
02 05 0154
W aterflow
3rd J-Sect Stair #5
02 05 0155 Valve Tam per 3rd Flr J-SectStair #5
02 05 0151 W aterflow 3rd J-Sect R iser R oom
02 05 0152
Valve Tam p 3rd J-SectR iser R oom
02 05 0153
Low Air 3rd J-Sect R iser R oom
02 05 0156
W aterflow
3rd J-Sect C onference R oom 3-259
02 05 0157
Valve Tam p 3rd J-SectC onference R oom
3-259
02 04 0134 W aterflow C linic R oofM echanical R oom
02 04 0135
Valve Tam per C linic R oof M echanical R oom
03 04 0130
W aterflow
5th FloorPArts Area 5-8A
03 04 0131 Valve Tam per 5th Flr Parts Area 5-8A
03 04 0132 Low
Air5th Floor
Parts Area 5-8A
03 04 0135 W aterflow 5th Floor W est Storage 5-1A
03 04 0136 Valve Tam per 5th Flr W est Storage 5-1A
04 0137 Low
Air5th Floor
W est Storage
5-1A
W aterflow
M onaco XM
TR
R elay
Valve Tam per M onaco XM
TR
R elay
01 04 0146
Pum p
R un
Basem ent
Pum p R oom 1-114
01 04 0147
Pum p Trouble Basem entPum p R oom 1-114
Fire pum p m ain drain test. R eturn to original (nonflow ing) pressure less than tw o sec.
Attachm ent "D
Q uarterly Flow and Tam per W ork Sheet for Building 4500
Main drain Valve PSI
D evice
D evice D escription
Checked Confirm Shut Open
D eficiency N otes *** (77) 01 02 0137 G age psi sam e as (99) 02 04 0134 & (75) 01 02 0135 G age psi sam e as (73) 01 02 0133 &
(58) 01 02 0142 G age sam e as (79) 02 02 167 & (28) 01 04 0140 G age sam e as (66) 01 04 0138 T indicates tested and I indicates inspected -Light red 1st and 3rd Q uarter light blue 2nd and 4th quarter
Attachm ent “E”
The last standpipe test w as done April 2016. A copy of the prior testing results below
A ttachm ent “F” T esting Protocols
1.
A rrive at the building to do the w ork.
2.
M ake personalcontactw ith N
C O
IC
and have them announce overpublic addresssystem thatyou w illbe testing the fire alarm system and w ill announce w hen the testing is com plete.
6.
A sk the N C
O
IC
to use his / her phone to call fire departm ent.
7.
C all Fort Jackson Fire D epartm ent (FJFD ) dispatcher at 751-4142 and tell him
/ her w hat you are doing, and you w illcall w hen testing is com plete. A sk dispatcher to m onitor alarm signals received from building.
8.
Perform fire alarm and sprinklertesting.
9.
N otify N C
O
IC
that testing is com plete. H ave him / her m ake announcem ent.
10.
C all FJFD dispatcher and inform them that test is com plete. V erify that they received signals through the M onaco transm itter. R ecord this on your report.
11.
Leave a copy of pm docum entation at fire alarm panel, and send m e a copy for ourfile.
12.
If repairs are required, call us during testing if it’s som ething m inor that can be done during the sam e visit. If itis som ething m ajor, you m ay contact m e later so w e can discuss repairs and cost.
Phone num bers (all are 803-751-X
X X
X
FJFD
D ispatcher 4142 / 7217
B ldg. 1890 PES
N C
IO
C
SFC
B risco 6251 Front D esk
2021 / 3105
B ldg. 4323 O liver D C
N
IO
C
SG
T Salley 4226 Front D esk
6418 / 6679
B ldg. 4575 TM
IO
C
SSG
D inkins 6383 Front D esk 6789 / 4733 / 7444
B ldg. 4590 C aldw ell D
O
IC
SSG
M cC all 5278
Front D esk
5178 / 5529 / 6017
B ldg. 5330 H agen D C
N C
IO
C
SG
T B lash 7380 FrontD esk
6211 / 3255 / 4091
B ldg. 4555 Sick
Q uarters
B ldg. 2500 W arehouse
B ldg. 2445 V et C linic
Attachm ent "G
Safety R equirm ents for an Im paired System
F ire &
L ife Sa fety Sy stem Im p a irm en t P erm it/T a g (P lease attach tag to Fire D e p artm e n t C on n e ction o r Fire
A larm
A n n un ciato r/C o n tro l P an e l)
B uild in g
N am e:
T yp e o fsystem im p aired
R e aso n fo r im p airm en t:
E xte nto fim p airm en t:
D ate system shuto ff:
E xp ected d ate o fre sto ration
Im p airm en t auth o rized b y:
cam p us p o lice
Sch ed u le B
Im p a irm en t W ork sh eet ore In form a tion
T od ay’s d ate
B ld g
T yp e o f system im p aired
E xte nt o f im p airm en t:
R e aso n fo r im p airm t:
im p airm en t to b eg in
E stim ated co m p le tio n d
P rson
(s) co nd ucting w o rk rson re sp o nsib le fo r m oun ting im p airm e nt tag
Fire w atch re q uired
If ye s, num b e r o f p e rson s:
em in d ers A re a in sp ecte d and risks d ete rm ine d ro h ib ition s in volved
B uild in g e vacuated
Im p airm en t tag issued o tifica tion s H as facilities m echanic b een n otified o f the im p airm t?
H as m o n ito rin g com p any, if an y, b e en no tified of the im p airm e n as the m ain ten an ce sup e rviso r fo r the affe cted b uild ing b ee n n o tified f the im p airm estoration affe cted system b e e n in sp e cted an d te ste d op e ratio n al?
im p airm e nt tag b e e n rem oved cam p us p olice b e e n n o tifie d o f th e re sto ratio n , if a fire alarm syste m fire alarm m on ito ring com p an y(if an
y) b e e n n otified o f the re storation m ain ten an ce sup e rviso r fo r the affe cted b uild ing b ee n n o tified f the re sto ration
Sch ed u le C
F irew a tch
L og
Sh eet a te N a m e(s) T im e
A rea
C h eck ed
Please return this form to Fire Protection M anag er at Facilities M anag ent.
T E
C H
N
IC
A L
E X
H
IB
IT
D E
L
IV
E R
A B
L E
S SC
H
E D
U L
E
D eliverable
Frequency # of C opies M edium /Form at Subm it To
IA
W
PW
S 1.6.11 K ey Personnel; The
C ontractor shall provide at least tw o points of contact w ithin the com pany to interface w ith the
C O
R on issues concerning sprinkler m aintenance, inspection, and testing service.
N am es, business address, phone num bers and hours of operation are the m inim um inform ation requirem ent. The C ontractor shall also provide an afterhours nam e and telephone for em ergency contact.
C ontractor shall provide a point of contact inform ation for 24 hours a day/ 7 days a w eek em ergency service.
O nce, before the
1st day of w ork perform ance and additionally w ithin 3 days of changes to key personnel or staffing arrangem ents that m ay affect the accuracy of the initial docum ent.
O ne (1) hard copy and one (1) electronic copy.
W ord/Excel
The C O
R
IA
W
PW
S 1.6.18
Installation A ccess;
“The contractor shall also provide all inform ation required for background checks to m eet installation access requirem ents to be accom plished by the installation Provost M arshal O ffice, D irector of
Em ergency Services, or Security O ffice.
The contractor w orkforce m ust com ply w ith all
IA
W section 1.6.18
PW
S.
IA
W section
1.6.18 PW
S
IA
W section 1.6.18
PW
S
IA
W section 1.6.18
PW
S
D eliverable
Frequency # of C opies M edium /Form at Subm it To personal identity verification requirem ents as directed by D oD
H Q
D A
, and/or local policy.”
IA
W
PW
S 5.1-5.2
B asic Services;
A ttachm ents A -G of this PW
S.
W eekly, Q uarterly A nnually and as specified by applicable codes and regulations and at the tim e ofservice.
1 D igitally signed copy (em ail) or hard copy
IA
W
A ttachm ents A
-G of the PW
S.
Subm it to Inspectors:
W endell Fralix, D oug
D riggers
H ow ard D ow d
IA
W
PW
S 5.6
“A ll bids for this contract m ust include a firm and binding hourly rate for each of the three type calls, routine, urgent, and em ergency.”
Included w ith the
B id.
1 D igital C opy (em ail) W ord/Excel A s stated in the R
FQ
IA
W
PW
S 5.7;
A statem ent shall be provided by the contractor agreeing to allow the inspection of these facilities by the G overnm ent.
B efore the first day of the contract.
1 D igitally signed copy (em ail) or 1 hard copy
W ord/Excel
Subm it to Inspectors:
W endell Fralix, D oug D riggers H ow ard D ow d
IA
W
PW
S 5.10; The
C ontractor shall provide the G overnm ent w ith all trace docum entation of the w aste disposal, upon request.
U pon request
1 H ard C opy O r 1 D igital
C opy (em ail)
In W riting and IA
W
South C arolina
H azardous W aste M anagem ent
R egulations, as regulated by the South C arolina D epartm ent of
H ealth and
Environm ental
C ontrol
Subm it to Inspectors:
W endell Fralix, D oug D riggers H ow ard D ow d
D eliverable
Frequency # of C opies M edium /Form at Subm it To
IA
W
PW
S 5.11;
M aterial Safety D ata
Sheets (M
SD
S) on all applicable substances brought on site.
Stated tw ice in
PW
S; 5.11 &
5.16.3.1
Should be listed as
SD
S
Initially, once w ith all substances expected to be brought on site for routine m aintenance and repairs. U pon arrival w ith any new substance and as requested. A ll SD S’s shall be kept by the contractor in accordance w ith
EM
385-1-1.
Electronic C opies, H ard
C opies w hen requested.
Per O
SH
A Standards and R egulations.
Subm it to C
O R
IA
W
PW
S 5.13.2
Test docum entation gathered at tim e of service w ill be turned over to the site inspectors.
A t the tim e of service.
1 H ard C opy O r 1 D igital
C opy (em ail)
A s directed by the specified PW
S for the test being perform ed.
Subm it to Inspectors:
W endell Fralix, D oug D riggers H ow ard D ow d
IA
W
PW
S 5.14.1;
Subm ission of a w ork plan is required.
Prior to beginning the project.
1 D igital C opy (em ail) W ord/Excel and
IA
W
PW
S 5.14.1.
Subm it to C O
R
IA
W
PW
S 5.15.1;
“The C ontractor w ill need to provide a signed copy of our pre-construction safety agreem ent at this m eeting.”
A t the pre-contract and safety training m eeting approxim ately 2 w eeks before the start of contract.
1 H ard C opy O r 1 D igital
C opy (em ail)
W ord/Excel
Subm it to C
O R
IA
W
PW
S 5.21
C ontractor
M anpow er R eporting (C M
R
IA
W
PW
S 5.21
C ontractor
M anpow er R eporting (C M
R
IA
W
PW
S 5.21
C ontractor
M anpow er R eporting (C M
R
IA
W
PW
S 5.21
C ontractor
M anpow er R eporting (C M
R
IA
W
PW
S
5.21 C
ontractor M anpow er R eporting (C
M
T E
C H
N
IC
A L
E X
H
IB
IT
Perform ance R equirem ents Sum m ary
The contractor service requirem ents are sum m arized into perform ance objectives that relate directly to m ission essential item
s. The perform ance threshold briefly describes the m inim um acceptable levels of service required for each requirem ent. These thresholds are critical to m ission success.
Perform ance O bjective
(IA
W
= In A ccordance W ith)
(PW
S=Perform ance W ork Statem ent)
Perform ance Standard
Perform ance T hreshold (This is the m axim um error rate. It could possibly be “Zero deviation from standard”)
Incentives/ D isincentives
PR
S #1
IA
W
Part 5 section 5.1 of the
PW
S; The C ontractor shall provide sprinkler m aintenance, inspection, and testing service for the M
A H
C . C ontractor shall provide both scheduled and em ergency service to M A
H C
’s Fire Sprinkler System
(FSS) as described w ithin this PW S. The
Service to the specified equipm ent shall m eet or exceed all applicable regulatory and m anufacturer'srequirem ents.
In addition, the C ontractor is responsible for the perform ance of m onthly Fire (FSS) tests as outlined in A ttachm ents A -G and IA W all applicable N
FPA
codes and regulations for the equipm ent listed below including their ancillary com ponents,parts, and devices, etc. In conjunction w ith com pleting the specified service
IA
W applicable N
FPA
rules and regulations; The attached eight checklists of this PW
S shall be perform ed on the specified equipm ent.
The contractor supplied Fire sprinkler m aintenance, inspection, and testing service in accordance w ith the PW S 5.1.
The contractor supplied both scheduled and em ergency fire sprinkler m aintenance, inspection, and testing services to the sprinkler piping, fire pum p, associated equipm ent, and Fire
Sprinkler System (FSS) w hich m et or exceeded all regulatory and m anufacturer requirem ents.
The contractor utilized and subm itted com pleted checklists as specified in attachm ents A
-G of the PW
S.
The contractor perform ed the scheduled and preventative m aintenance IA
W applicable Federal, State and Local codes and regulations.
The contractor w as present during the perform ance of each m onthly Fire System s Test (FSS) as outlined in A ttachm ents A
-G of the PW
S.
Zero D eviation from
Standard
In the event that the perform ance threshold is not m et; The C ontractor shall re-perform and/or com plete w ithin 30 days of a w ritten corrective action, any and all tasks related to non-perform ance issues at no cost to the Federal G overnm ent.
In the event that the Perform ance Threshold has not been satisfactorily m et after the 30 days, the Federal G overnm ent m ay at their discretion;
1.Issue a tim e extension of the notice to com plete the corrective action or
2.H ire a 3rd party to com plete the corrective action and deduct thecost from the C ontractors m onthly paym
PR
S #2
IA
W
PW
S 1.6.4; The contractor is responsible for conducting business, betw een the hours of 0730-1530 M onday thru Friday except Federal holidays or w hen the G overnm ent facility is closed due to local or national em ergencies, adm inistrative closings, or sim ilar G overnm ent directed facility closings section The C ontractor m ust, at all tim es, m aintain an adequate w orkforce for the uninterrupted perform ance of all tasks defined w ithin this PW S w hen the G overnm ent facility is not closed for the above reasons.
The contractor conducted business betw een the hours or 0730-1530 and m aintained an adequate w orkforce for the uninterrupted perform ance of all tasks defined w ithin PW
S-1.6.4.
PR
S #3
IA
W
PW
S 1.6.9; The
C ontracting O fficer, C ontracting O fficers
R epresentative (C
O R
), and other G overnm ent personnel, as appropriate, m ay m eet periodically w ith the C ontractor to review the C ontractor's perform ance. A t these m eetings, the C ontracting O fficer w ill apprise the C ontractor of how the G overnm ent view s the C ontractor's perform ance and the C ontractor w ill apprise the G overnm ent of problem s, if any, being experienced.
A ppropriate action shall be taken to resolve outstanding issues.These m eetings shall be at no additional cost to the G overnm ent.
In accordance w ith PW
S 1.6.9; The contractor, at no cost to thegovernm ent, attended contractor perform ance m eeting and took appropriate action to resolve outstanding issues that they w ere apprised of.
M onthly Paym ent m ay be w ithheld until docum entation has been provided.
PR
S #4
IA
W
PW
S 1.6.11 K ey Personnel; The C ontractor shall provide at least tw o points of contact w ithin the com pany to interface w ith the C
O R on issues concerning sprinkler m aintenance, inspection, and testing service. N am es, business address, phone num bers and hours of operation are the m inim um inform ation requirem ent. The C ontractor shall also provide an afterhours nam e and telephone for em ergency contact. C ontractor shall provide a point of contact inform ation for 24 hours a day/ 7 days a w eek em ergency service.
In A ccordance w ith PW S section 1.6.11 the contractor provided tw o points of contact w ithin the com pany to interface w ith the C O
R on issues concerning sprinkler m aintenance, inspection, and testing service.
The C ontractor also provided an after-hours nam e and telephone num ber for a 24 hours a day/7days a w eek em ergency contact.
PR
S #5
IA
W
PW
S 1.6.12 Identification of C ontractor Em ployees; A ll
C ontractor personnel attending m eetings, answ ering G overnm ent telephones, and w orking in other situations w here their C ontractor status is not obvious to third parties are required to identify them selves as such to avoid creating an im pression in the m inds of m em bers of the public that they are G overnm ent officials. They m ust also ensure that all docum ents or reports produced by C ontractors are suitably m arked as C ontractor products or that C ontractor participation is appropriately disclosed.
In A ccordance w ith PW S section 1.6.12
Identification of C ontractor Em ployees;
The contractor and their em ployees appropriately disclosed and identified them selves as contractors w hile in com m unication w ith G overnm ent personnel and ensured that all docum ents or reports produced w ere m arked as contractor products.
PR
S #6
IA
W
PW
S 1.6.18; The contractor and all associated subcontractors’ em ployees shall com ply w ith applicable installation, facility, and area com m ander installation and facility access and local security policies and procedures (provided by the G overnm ent representative). The contractor shall also provide all inform ation required for background checks to m eet installation access requirem ents to be accom plished by the installation Provost M arshal O ffice, D irector of Em ergency Services, or Security O ffice.
The contractor w orkforce m ust com ply w ith all personal identity verification requirem ents as directed by D oD , H
Q D
A , and/or local policy.
In accordance w ith PW
S section 1.6.18;
The contractor and all associated subcontractors’ em ployees com plied w ith applicable installation, facility, and area com m ander installation and facility access and local security policies and procedures (provided by the G overnm ent representative).
The contractor provided all inform ation required for background checks to m eet installation access requirem ents.
The contractor w orkforce com plied w ith all personal identity verification require m ents as directed by D oD
H
Q D
A , and/or local policy.
ontractor em ployees w ho fail to m eet facility access and local security policies and procedures w ill be denied access to the w orksite. D enial or rem oval of any contractor em ployee shall not affect the contractor obligations of the specified w ork perform ance and/or w ork schedule as outlined in the PW
S. U nder no circum stances shall the
Federal G overnm ent be liable for costs incurred by the contractor for em ployees w ho are denied access to the w orksite.
PR
S #7
IA
W
PW
S 5.5; The C ontractor shall be responsible for em ergency calls that the governm ent staff is unable to respond per PW
S 5.5.
In accordance w ith PW
S section 5.5;
The C ontractor responded to em ergency calls that the governm ent staff w as unable to respond to.
PR
S #8
IA
W
PW
S 5.6; The C ontractor is responsible for responding to all facility calls for non-scheduled service. N on-scheduled service shall be broken into the categories of routine, urgent and em ergency.
R outine service calls shall require an on-site response w ithin 5 business days of receiving the trouble call (excluding all federal holidays).
The on-site response tim e for urgent repairs shall be w ithin 4 hours of receiving the trouble call. The on-site response tim e for em ergency calls (total equipm ent failure) shall be w ithin 1 hour of receiving the trouble call. The C ontractor is responsible for responding to all service calls. A ll bids for this contract m ust include a firm and binding hourly rate for each of the three type calls, routine, urgent, and em ergency.
IA
W w ith section PW
S 5.6 The C ontractor provided categories of routine, urgent and em ergency calls and related response tim es and hourly rates.
The contractor m et and or exceeded routine, urgent and em ergency calls w ithin the specified response tim es and hourly rates.
Standard for urgent and ergency calls.
PR
S #9
IA
W
PW
S 5.8; The annual
A utom atic Transfer Sw itch &
G enerator testing is not part of this PW
S and w ill be perform ed by an 3 rdparty authorized A
SC
O service provider.
The fire pum p testing is part of this PW S and shall be tested in conjunction w ith the June generator test w hich is norm ally done at 1700 hours on the first Thursday of each m onth.
It is the obligation of the contractor to ensure that qualified technicians are on site and capable of perform ing the fire pum p test sim ultaneously w ith the generator testing.
The contractor tested the fire pum p in conjunction w ith the June generator test.
Failure to com plete the fire pum p testing in conjunction w ith the generator and autom atic transfer sw itch testing m ay result in rescheduling and retesting all com ponents sim ultaneously. The contractor shall be liable for all costs incurred by retesting due to failure of to perform the fire pum p testing at the scheduled tim
e. These costs m ay include, but are not lim ited to, the fire pum p, generator, and autom atic transfer sw itch testing.
These costs, if incurred, w ill be deducted from the contractor’s m onthly paym ent.
R etesting shall be at no cost to the Federal G overnm
PR
S #10
IA
W
PW
S 5.11; The C ontractor shall supply the clinic w ith Safety D ata Sheets (SD S) on all applicable substances brought on site.
IA
W the PW S 5.11; The C ontractor provided the clinic w ith Safety D ata
Sheets (SD S) on all applicable substances brought on site.
A ny substance not identifiable and/or w ithout an approved SD S shall be rem oved from site im ediately. A ny costs incurred shall be deducted from the contractor’s m onthly invoice.
PR
S #11
IA
W
PW
S 5.15.1; The
C ontractor w ill be required to attend a pre-contract m eeting and safety training approxim ately 2 w eeks prior to the start of w ork. The
C ontractor w ill need to provide a signed copy of the governm ents pre-construction safety agreem ent at this m eeting. A copy of the pre-construction safety agreem ent is available in electronic W ord form at upon request.
IA
W the PW S 5.15.1 the C ontractor attended a pre-contract m eeting and safety training. The C ontractor provided a signed copy of our pre-construction safety agreem ent at this m eeting.
IA
W
PW
S 5.15.5 C ontractors w ill be required to w ear visitor badges and sign in and out w hile w orking in the building.
The C ontractor shall notify one of the personnel listed in paragraph 5.14.1 each day prior to beginning w ork.
IA
W
PW
S 5.15.5 the contractors w ore visitor badges and signed in and out w hile w orking in the building.
Th e C ontractor notified one of the personnel listed in paragraph 5.14.1 each day prior to beginning w ork.
IA
W
PW
S 5.18
O C
C U
PA
TIO
N A
L SA
FETY
A
D
H
EA
LTH
: The
C ontractor shall com ply w ith the O ccupational Safety and
H ealth A ct (O
SH
A ) as w ell as applicable EM
385 1-1 rules and regulations. The C ontractor shall be responsible forensuring adherence to all applicable Installation, State of South C arolina, and Federal rules and regulations.
The C ontractor has com plied w ith all applicable regulations of the O ccupational Safety and H ealth A ct (O
SH
A
The C ontractor has com plied w ith all applicable rules and regulations of the A rm y C orp of Engineers EM 385 1-1
Failure to com ply w ith all safety rules and regulations as specified in the PW
S w ill result in rem oval of contractor personnel from the installation until such tim e as the contractor can dem onstrate that com pliance to the rules and regulations can be et.
File details come from the government source that posted it. Updated .