This is a set of bid documents for a window replacement project at the Mann-Grandstaff Veterans Affairs Medical Center (VAMC) in Spokane, Washington. The project, identified as Project Number 668-24-102, involves the demolition and replacement of designated windows in Building 1 with minimal disturbance to existing construction and finishes. The work encompasses multiple floors (basement through penthouse, up to 10 stories) of a large medical facility, requiring coordination with ongoing VA operations and strict adherence to infection control and life safety measures.
The documents establish comprehensive requirements for window replacement including specific window types with various glazing options, detailed specifications for head, jamb, and sill installations, and phasing plans organized by floor and work area groups. The contractor must maintain ICRA (Infection Control Risk Assessment) barriers with Level II containment, preserve one negative pressure room at all times, and coordinate extensively with the Contracting Officer's Representative (COR) and VAMC staff. Special requirements include handling three existing interior stained glass units at the chapel (to be reset into new frames), providing blast-rated and ballistic-resistant glazing at specific locations, installing mini-blinds and glass access panels where interior access exists, and implementing comprehensive fire safety and medical emergency protocols. The design incorporates wind loads based on ultimate design wind speed of 114 mph and nominal design wind speed of 88.3 mph per ANSI/ASCE 7-16. Drawings provide detailed floor plans with window locations tagged by type, exterior elevations showing window distribution, and construction details specifying materials, dimensions, and installation methods using aluminum frames with various glazing configurations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 13 - 668-24-102 - Site Visit Area Map.pdf | ||
| 36C26026R0011_1 Solicitation.docx | DOCX document | |
| Attachment 3 - 668-24-102 - BID SET SPECIFICATIONS 2_18_26.pdf | ||
| Attachment 7 - 668-24-102 - Hazardous Survey Report.pdf | ||
| Attachment 10 - 668-24-102 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 11 - 668-24-102 - Cost Division Breakout.xls | XLS spreadsheet | |
| Attachment 9 - 668-24-102 - Contractor Rules of Behavior.pdf | ||
| Attachment 1 - 668-24-102 - CON SOW.pdf | ||
| Attachment 8 - 668-24-102 - Limitations on Subcontracting-Construction.pdf | ||
| Attachment 5 - 668-24-102 - LEVEL 2 Window project VHA ICRA.pdf | ||
| Attachment 6 - 668-22-102 - LEVEL 3 Window project VHA ICRA.pdf | ||
| Attachment 4 - 668-24-102 - PCRA_VHA PCRA.pdf | ||
| Attachment 12 - 668-24-102 - Spokane Wage Determination 1_23_26.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF DRAWINGS
GI000
SHEET
NO.
DRAWING TITLE
GENERAL
SHEET
NO.
COVER SHEET
REPLACE WINDOWS BUILDING 1
PROJECT NUMBER: 668-24-102
BID DOCUMENTS
MANN-GRANDSTAFF VAMC
SPOKANE, WASHINGTON
AREA MAP
NOT TO SCALE
LOCATION MAP
NOT TO SCALE
PROJECT LOCATION
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
PLAN
NORTH
DRAWING TITLE
AE100
ARCHITECTURAL
BASEMENT FLOOR PLAN
AE101 FIRST FLOOR PLAN
AE102 SECOND FLOOR PLAN
AE103 THIRD FLOOR PLAN
AE104 FOURTH AND FIFTH FLOOR PLANS
AE105 SIXTH AND SEVENTH FLOOR PLANS
AE106 EIGHTH, NINTH AND PENTHOUSE FLOOR PLANS
PROJECT LOCATION
AE201 EXTERIOR ELEVATIONS
AE202 EXTERIOR ELEVATIONS
AE203 EXTERIOR ELEVATIONS
AE601 WINDOW TYPES
GI002 BASEMENT FLOOR PLAN - ICRA
GI003 FIRST FLOOR PLAN - ICRA
GI004 SECOND FLOOR PLAN - ICRA
GI005 THIRD FLOOR PLAN - ICRA
GI006 FOURTH AND FIFTH FLOOR PLANS - ICRA
GI007 SIXTH AND SEVENTH FLOOR PLANS - ICRA
GI008 EIGHTH, NINTH AND PENTHOUSE FLOOR PLANS - ICRA
GI001 LEGENDS, ABBREVIATIONS AND NOTES
GI009 BASEMENT FLOOR PLAN - PHASING
GI010 FIRST FLOOR PLAN - PHASING
GI011 SECOND FLOOR PLAN - PHASING
GI012 THIRD FLOOR PLAN - PHASING
GI013 FOURTH AND FIFTH FLOOR PLANS - PHASING
GI014 SIXTH AND SEVENTH FLOOR PLANS - PHASING
GI015 EIGHTH, NINTH AND PENTHOUSE FLOOR PLANS - PHASING
AE602 WINDOW DETAILS
AE603 TYPICAL WINDOW DETAILS, CEILING BULKHEAD DETAILS, GLAZING GROUPINGS
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
COVER SHEET
GI000
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND
GENERAL ARCHITECTURAL NOTES
GENERAL PROJECT NOTES
A
GA4
A301
A201
A401
ROOM
NAME
+ 0'-6"
F.E.C.
AIR CONDITIONING
ACOUSTICAL CEILING TILE
ABOVE FINISH FLOOR
ALUMINUM
BATT INSULATION
BOTTOM OF
CEMENTITIOUS BACKER BOARD
CEMENTITIOUS CRYSTALLINE WATERPROOFING
COLD-FORMED METAL FRAMING
CORNER GUARD
CENTERLINE
CONCRETE MASONRY UNIT
CASED OPENING
COMMUNICATION
CONCRETE
SEALED CONCRETE
CONTINUOUS
CONTRACTING OFFICER'S REPRESENTATIVE
CERAMIC TILE
CERAMIC TILE BASE
CARPET
DIAMETER
EXPANSION JOINT
ELECTRICAL
EPOXY FLOORING
EXPOSED STRUCTURE
ET CETERA
EXISTING
EXPOSED
FACTORY FINISH
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FINISHED FLOOR
FINISH
FLOOR
FACE OF
FIELD VERIFY
FABRIC WALLCOVERING
GAGE
GRANITE
GYPSUM (WALL) BOARD
HANDICAPPED
HOLLOW METAL
HANDRAIL
HEATING VENTILATION AND AIR-CONDITIONING
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
METAL
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
PLASTER
PLASTIC LAMINATE
PORCELAIN TILE
PAIR
PAINT
QUARRY TILE
RESILIENT BASE
REFRIGERATOR
REQUIRED
RESINOUS FLOORING
RESINOUS EPOXY WALL-CEILING
ROUGH OPENING
RUBBER FLOORING
RECESSED PAPER HOLDER
SEALED HIGH BUILD GLAZED COATING
SOLID CORE WOOD
SIMILAR
SPECIAL FACED
STAINLESS STEEL
STEEL
SUBSTRATE
SHEET VINYL
SOLID VINYL TILE
TELEPHONE
TOP OF
TYPICAL
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VINYL WALL COVERING
WALL COVERING
WALL PROTECTION
WOOD
WELDED SEAM SHEET FLOORING
AC
AT
AFF
AL
BATT
BO
CBB
CCW
CFMF
CG
C
CMU
CO
COMM
CONC
SCONC
CONT
COR
CT
CTB
CP
DIA
EJ
ELEC
EPY
ES
ETC
EXIST
EXP
FAC FIN
FD
FEC
FHC
FF
FIN
FLR
FO
FV
FWC
GA
GRA
GYP BD/GWB
HC
HM
HR
HVAC
MATL
MAX
MECH
MFR
MIN
MO
MTL
NIC
NTS
OC
OH
PLS
PL
PT
PR
P
QT
RB
REF
REQ'D
RES
RES-W
RO
RF
RPH
SC
SCW
SIM
SP
SS
STL
SUBS
SV
SVT
TELE
TO
TYP
UNO
VCT
VWC
WC
WP
WD
WSF
L
FIRE EXTINGUISHER CABINET
ROOM NAME AND NUMBER
DOOR NUMBER
KEY NOTE
WINDOW TYPE
PARTITION TYPE
DETAIL CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
SECTION CALLOUT
VERTICAL ELEVATION
COLUMN CENTERLINE DESIGNATION
DEMOLITION KEY NOTE
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
INTERIOR ELEVATION CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
CARD READERCR
HIGH-PRESSURE LAMINATEHPL
LUXURY VINYL TILELVT
EDGE OF DECKEOD
DOWNSPOUTDS
CONTROL JOINTCJ
DRINKING FOUNTAINDF
FIRE RETARDANT TREATEDFRT
EXTERIOR INSULATION FINISHING SYSTEMEIFS
WATER RESISTANTWR
J1
SECTION CUT
HEAD/JAMB/SILL DETAIL NUMBER EQUALEQ
CARPET TILECPT
REFLECTED CEILING PLANRCP
SOLID SURFACE MATERIALSSM
X1045 EQUIPMENT JSN NUMBER
ALUMINUM COMPOSITE METAL PANELSACMP
A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:
• FACE OF EXISTING WALL SURFACE
• FACE OF MASONRY
• FACE OF WALL STUDS
• TOP OF SLAB
• TOP OF MASONRY
• ALIGN WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED.
B. COORDINATE WITH ALL DISCIPLINES DRAWINGS FOR ADDITIONAL REQUIREMENTS.
COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE HOLES IN EXISTING WALLS
AND SLABS ARE CREATED FOR PENETRATIONS, COORDINATE SIZE AND LOCATION. PATCH
HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC.
WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL,
THICKNESS, ALIGNMENT, GRADES, AND QUALITY.
C. COORDINATE AND PROVIDE GALVANIZED METAL BACKER PLATE OR SOLID FIRE
RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS. COORDINATE
LOCATIONS WITH COR FOR GOVERNMENT PROVIDED/CONTRACTOR INSTALLED
EQUIPMENT.
D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING,
INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED.
E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE BARRIERS AND FIRE
BARRIERS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR
SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO
INSTALLATION. PROVIDE UL LISTED ASSEMBLIES.
F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING.
G. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE
DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR .
H. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS
REQUIRED FOR CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE
REPAIRED TO ACCEPT NEAT INSTALLATION OF CONSTRUCTION OR FINISHES. WHERE
EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.)
EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES
SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF
MATERIALS.
I. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM
CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST
WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.
A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAN UP THE WORK AREA
AS DIRECTED IN MEDICAL SITUATIONS REQUIRING SUCH ACTION.
B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL
SUBMITTALS FOR SUCH HAVE BEEN APPROVED.
C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL
TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A
HAZARD TO PATIENTS, VISITORS AND STAFF.
D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF
HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE
WITH COR.
E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF
HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE
ALLOWED TO PERFORM WORK ON VA PREMISES.
F. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA
TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME.
G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE,
DUST AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING
CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AN CLEARED WITH THE COR
AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE
WHENEVER THE CONTRACTOR'S FORCES ARE NOT PRESENT IN THE WORK AREA.
H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY
WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND
FOUND TO BE SECURE, SAFE AND FREE OF ANY FLAMMABLE LIQUIDS.
I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER.
J. SEE SPECIFICATIONS SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.
K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR DESIGNER WHERE NOT
OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT COLORS FROM THE MANUFACTURER'S
FULL RANGE OF COLORS.
L. PROVIDE 24"X24" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER
PIPES REQUIRE ACCESS AS REQUIRED. COORDINATE EXACT LOCATIONS WITH THE COR.
M. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT WITHOUT
AUTHORIZATION FROM VAMC ENGINEERING SERVICE UNLESS AN EMERGENCY SITUATION
OCCURS.
N. CONTRACTOR SHALL MAINTAIN ALL FIRE-RATED ASSEMBLIES WITHIN THE PROJECT AREA
DURING PERFORMANCE OF THE WORK.
O. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL REQUIRED EXIT LIGHTING AND SIGNAGE
REQUIRED FOR EGRESS WITHIN AND ADJACENT TO THE PROJECT AREA DURING
PERFORMANCE OF THE WORK.
P. INDICATED EXISTING CONDITIONS ARE BASED UPON LIMITED FIELD INVESTIGATION AND DID
NOT INCLUDE DESTRUCTIVE INVESTIGATION OR TESTING. CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS INCLUDING DIMENSIONS OF THE INSTALLED CONSTRUCTION PRIOR TO
COMMENCING WITH THE WORK. IF DISCREPANCIES ARE DISCOVERED, THE CONTRACTOR
SHALL NOTIFY THE COR FOR INTERPRETATION AND DIRECTION PRIOR TO PROCEEDING WITH
THE WORK.
Q. COORDINATE WORK WITH EQUIPMENT SUPPLIER/ INSTALLER CONTRACTED SEPARATELY WITH
THE GOVERNMENT.
R. THE INTENT FOR THIS WINDOW REPLACEMENT PROJECT IS DEMOLITION AND REPLACEMENT
OF DESIGNATED WINDOWS WITH MINIMAL DISTURBANCE TO EXISTING CONSTRUCTION AND
FINISHES. WHERE IT IS NECESSARY TO DISTURB EXISTING FINISHES ON EXTERIOR OR
INTERIOR TO ACCOMPLISH DEMOLITION AND/OR REPLACEMENT, THE CONTRACTOR SHALL
RECONSTRUCT, REPAIR AND COMPLETELY RESTORE ADJACENT CONSTRUCTION AND FINISHES
TO MATCH THEIR ORIGINAL CONDITION AS ACCEPTABLE TO THE CONTRACTING OFFICER’S
REPRESENTATIVE.
S. PLAN SHEETS AE101-AE106 INCLUDE A DASHED LINE TYPE DEPICTING WINDOWS THAT HAVE INTERIOR FINISHES OVER THE INTERIOR SIDE OF THE ENTIRE WINDOW. AT THESE LOCATIONS
MINI BLINDS AND THE GLASS ACCESS PANELS ARE NOT REQUIRED.
T. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING, STORING AND REPLACING
FURNISHINGS AND EQUIPMENT AS NECESSARY TO PERFORM THE WORK. DISCONNECTION,
RELOCATION AND RECONNECTION OF SPECIALIZED EQUIPMENT SHALL BE COORDINATED AT
THE DIRECTION OF THE COR.
A ACCESSORY TYPE
GENERAL PHASING NOTES
A. GROUPS OF WINDOWS TO BE REPLACED ARE INDICATED ON THE FLOOR PLAN DRAWINGS
WITH A WINDOW TAG. WINDOWS THAT ARE NOT TAGGED ARE NOT IN SCOPE. GROUPS OF
WINDOWS ARE LIMITED TO SIX. CONTRACTOR SHALL ADJUST THE NUMBER OF WINDOWS
IN EACH GROUP AND SEQUENCE OF CONSTRUCTION PHASING FOR GROUPS AS DIRECTED
BY THE COR. COORDINATE ADJUSTMENTS AND SUBMIT FOR APPROVAL TO THE COR.
B. THE INTENT IS FOR MULTIPLE GROUPS OF WINDOWS, BOTH VERITCALLY AND/OR
HORIZONTALLY TO BE REPLACED AT THE SAME TIME AT THE DIRECTION OF THE COR.
C. CONTRACTOR CAN WORK MULTIPLE CREWS ON MORE THAN ONE GROUP OF WINDOWS AT
A TIME AT THE DIRECTION OF THE COR.
D. WORK SCHEDULE AND GROUPS OF WINDOWS MUST BE COORDINATED WITH THE COR AND
VAMC STAFF PRIOR TO START OF WORK.
E. CONTRACTOR SHALL COORDINATE WITH AND OBTAIN APPROVAL FROM THE COR AND
VAMC STAFF WHICH GROUPS OF WINDOWS ARE AVAILABLE FOR WORK.
F. REFER TO SHEETS GI009-GI015 FOR PHASING PLANS.
EXTERIOR ELEVATION CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
A301
DESIGN CODES
1.01 2021 INTERNATIONAL BUILDING CODE (IBC) AS MODIFIED BY:
1.02 ANSI/ASCE 7-16, MINIMUM DESIGN LOADS AND ASSOCIATED
CRITERIA FOR BUILDINGS AND OTHER STRUCTURES
DESIGN LOADS
1.01 DESIGN LOADS ARE AS FOLLOWS:
A. WIND LOADS:
1. ULTIMATE DESIGN WIND SPEED Vult = 114 MPH
2. NOMINAL DESIGN WIND SPEED Vasd = 88.3 MPH
3. IMPORTANCE FACTOR Iw = 1.0
4. RISK CATEGORY = IV
5. WIND EXPOSURE =B
6. LATERAL SYSTEM = SAME AS FOR EARTHQUAKE LOADS
7. INTERNAL PRESSURE COEFFICIENT = ± 0.18 (ENCLOSED)
LOCATION ZONE
EFFECTIVE
WIND AREA (SF)
ULTIMATE DESIGN WIND
PRESSURE
(PSF)
a = 20'-0" h = 112'-0"
W A
LL
S
(N
E G
A T
IV
E
P
R E
S S
U R
E
-31.2
-29.5
-28.3
-57.2
-50.6
-45.6
5 5 a a h a a
LOCATION ZONE
EFFECTIVE
WIND AREA (SF)
ULTIMATE DESIGN WIND
PRESSURE
(PSF)
W A
LL
S
(P O
S
IT
IV
E
P R
E S
S U
R E
19.8
18.4
17.4
4 & 5
21.1
19.6
18.4
HEIGHT (FT)
0 - 15
4 & 5 20
22.1
20.5
19.3
4 & 5 25
23.0
21.3
20.1
4 & 5 30
24.6
22.7
21.3
4 & 5 40
25.8
23.9
22.4
4 & 5 50
26.9
24.9
23.3
4 & 5 60
27.9
25.8
24.1
4 & 5 70
28.8
26.6
24.9
4 & 5 80
29.6
27.3
25.5
4 & 5 90
30.3
28.0
26.2
4 & 5 100
31.2
28.7
26.8
4 & 5 112
31.5
29.0
27.1
4 & 5 116.2
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
LEGENDS, ABBREVIATIONS AND NOTES
GI001
A004A
B004
B006
B014AB014C
B010
B008
B012
B006
A004C
A00
B002
B001
B003
B007A B007
B00 9A
B005F
CB-B2
B016
B014B
B018
B018B
B005B
B00 5G
B005A
B005D
B005E
B005C B013
B01
B009
SB-B1
A005 C005B
C005E
A007C
A002A
A002 A002B
A009A
A017A
A010
A017B
C003A A009
A008 C001
C003
C005
C002
C002B
C004A C004
C002C
C005A
A007
A007A A007B
C005D
C005C
SB-C3
B017
A006B
A003
A006A
D008L
D008M D008N
D008
E007
E004
C002A
D008E
D008A
D008B
D008HD008KD008F
B014D
A006
C005F
E034A
E034B
E036
S E
-1
B001
B018C
B01 6A
B01 8A
UP
R
AM
P
D N
U P
UP
UP
U
DN
U P
U P
DN
U P
U P
FIR
E S P R
IN
K
LER
R
ISER
R
ISER
H .O
H .O
ALAR
M
P N L
ATS
ATS
ATS
ATS 6
ATS 1
ATS 2
SW
ITC
H
G E
AR
ELEC
M
IN
M
IN
E.
P
E.
P
E.
P
E.
P
E.
P
E.
P
SHOP, BIOMEDB007
B018C
B018B
B018A
B017B
B017A
B016A
B009A
B007A
B016
B018
B017
B010
B009
B008
STORAGE GENERAL
DOCK
LINEN ROOM, CLEAN
MORGUE
MORGUE
STORAGE, WARD SUPPLIES
MECHANICAL ROOM
MECHANICAL ROOM
CLOSET
STORAGE, GENERAL
MECHANICAL ROOM
RECYCLING
MECHANICAL ROOM
STORAGE, GENERAL
TOILET, FEMALE
B005G
B005F
B005E
B005D
B005C
B005B
B005A
B003A
A009A
A007C
A007B
A007A
A006B
B001
B006
B004
B003
B002
A010
A009
A008
A007
OFFICE, CHIEF
OFFICE, IT
PIPE SHOP
HSK SHOP
STORAGE, GENERAL
COMPUTER ROOM
OFFICE, STAFF
OFFICE, IT
OTHER SPACE
STORAGE, DRY GOODS
REFRIG., WALK-IN
CORRIDOR
REFRIG., WALK-IN
H.A.C.
KITCHEN, DIETETICS
A006A
A004C
A004A
A002B
A002A
A004
A006
A005
A003
A002
STORAGE, GENERAL
STORAGE, GENERAL
REFRIG., WALK-IN
FREEZER, WALK-IN
STORAGE, GENERAL
LINEN CHUTE
OFFICE, STAFF
VESTIBULE, COOLER/FRZR
REFRIG., WALK-IN
SB-C3
SB-B1
OTHER SPACE
OTHER SPACE
C005F
C005E
C005D
C005C
STORAGE, FILE ROOM
STORAGE, FILE ROOM
STORAGE, GENERAL
STORAGE, FILE ROOM
C003
C004A
C005B
C005A
C005
C004
C003A
C002C
C002B
C002A
C002
C001
LOCKER ROOM
MECHANICAL ROOM
OTHER SPACE
BATH/SHOWER ROOM
LOCKER ROOM
BATH/SHOWER ROOM
STORAGE, GENERAL
STORAGE, GENERAL
STORAGE, GENERAL
HOUSEKEEPING
KITCHEN, DIETETICS
MECHANICAL ROOM
RM# ROOM NAME
B014A
B015
B012
B013
B011
STORAGE, WARD SUPPLIES
CLOSET, TELEPHONE
BATH/SHOWER ROOM
OTHER SPACE
OFFICE, GENERAL
STORAGE, GENERAL
STORAGE,GENERAL
A017A MECHANICAL
A017B MECHANICAL
D008 MECHANICAL ROOM
D008A OFFICE, GENERAL
D008B LRC
D008E WORKROOM
D008F VESTIBULE
D008H LOCK SHOP
D008K OFFICE, GENERAL
D008L ELECTRICAL
D008M COMMUNICATIONS
D008N OFFICE, GENERAL
--- HALL
--- CORRIDOR
B005 VAULT
OFFICE, STAFF
OFFICE, STAFF
OFFICE, STAFF
OFFICE, STAFF
B006A OFFICE, IT
B014B ---
B014C MAIL ROOM
B014D OFFICE, GENERAL
ICRA BARRIERS PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL MEET WITH THE COR TO
COORDINATE AND SUBMIT FOR APPROVAL PHASING OF THE WORK AND PLACEMENT OF ICRA
BARRIERS.
B. CONTRACTOR TO MAINTAIN ONE NEGATIVE PRESSURE ROOM BE AVAILABLE AT ALL TIMES, NO
EXCEPTIONS. COORDINATE WITH COR.
C. SEE SPECIFICATION 01 35 26 "SAFETY REQUIREMENTS" AND 01 35 26.01 "CONSTRUCTION RISK
ASSESSMENT" FOR DUST CONTROL DIRECTIONS.
D. PROVIDE ICRA BARRIER AND ENTRANCE DOOR LOCATIONS AS REQUIRED AND INDICATED ON
FLOOR PLANS. COORDINATE LOCATIONS WITH COR. BASIS OF DESIGN: STARC SYSTEMS.
E. CONTRACTOR SHALL SUBMIT A ICRA PLAN TO COR FOR APPROVAL.
F. ALL ICRA BARRIERS ARE LEVEL II UNLESS NOTED OTHERWISE
ICRA BARRIERS LEGEND
ICRA BARRIER LOCATIONS SUBJECT TO COR REVIEW AND APPROVAL.
ICRA LEVEL III
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
BASEMENT FLOOR PLAN - ICRA
GI002
1/16" = 1'-0"GI002
1 BASEMENT FLOOR PLAN - ICRA
SCALE:
0' 8' 16' 32' 48'
1/16" = 1' - 0"
S1-B1B128
B102
C1-B1
A125
A127A
B101
A127E
B117 B114
A127F
A127C
A127D
A127B
B112
A127
B116A
B126
B100
B121
B119
B115
B105
B103
A126
A123
A124
B101A
B103A
B110
B107A
B109
B106
B108
B111
B107
B113
B109A
B103B
A103A
A103
A105
D105D118D120 D118A D156
CID6
A119
A122A
A122
C1-A1
A121
A119A
A102
C1-A4
A102E
A102B
S1-A1
D107
C1D2
A102D
A102C
A143
A142
C100
D123
D124 D125
D122
C144
D116
D117
D126 D120
D115
C111
S1-C2
C107 C113
C145D
C145
C145B
C110
C1-C1
C106B
C145E C112B
C1-B2
D109 D111 D113 D114 C146
C145A
CID3
D135
D134
D104
D103
D133
D102 D132
D101
D100A D100
DR10
D100B CID5
D100C
D131 D129 D127
D130 D128
D119
CID4 CID1
1C1-27
1C 2-
170A
146 145 144
142 140 138 136 134 132 130
126127 131133135137139
1A141
103 112
113 115
114 116B
117 119
116A
118A
151 153 155
158159
150A150
164165166167168
101A
P-4 S1-C1
118B
1C4E
1C4W-27
1C 4N
-2
1C--
C112
C112A
C112C
C111A
185A
136 134 132 130 E128 E126
C1E7 E124
E138E140A
E135 E133
E129 E121
E119
E117
E139
E139A
E140
E122
E120
E118
E139B
107C E113
E111
E109 E108
E112
E114 E110
E105
E106 E107A
E107B
E107
A102H A102G
A102FA102I
A102J
A102E
C1E2
C1E3
E104
E103
E102
E100
A102A
C1E1
A102E
A101
C1-A2 A142
1C3-27
D118 D130
D110A
D110D108
D108A
B118
B
LD
G . 27
B
LD
G . 1
B
LD
G . 27
B
LD
G . 1
B
LD
G . 40
B
LD
G . 27
B
LD
G . 40
B
LD
G . 27
R .D
R .D
R .D
D N
R
AM
P
D O W N
RAMP DONW
DN
C O
VER
ED
C O N C R
ETE
P
ATIO
R O O F
R O O F
COVERED RAMP
DOWN
F .E .C .F
.E .C
F.E.C.
F.E.C.
F.E.C.
F .E .C
F .E .C
F.E.C.
F.E.C.
F .E .C
CONCRETE WALK
C O N C R
ETE
W
ALK
C O N C R
ETE
W
ALK
SAFE
H O O D
HOOD
A-
FP
1- 1C
A-
FP
1A
A-
FP
1- 1C
A-
FP
1A
M
ATC
H
LIN
E
M
ATC
H
LIN
E
R .D
DN
DN
DN
UP DN
D N
DN
UP
UP
U P
D N
D
NLIG
H T W
ELL
FIR
E S H U
TTER
H/WH/WH/WH/W
H W
A.P.
E.P.
AC
C
ESS
H
ATC
H W
G R
ATE
TRAY
COLD
WARM
D.F.
FD
D .F.
D .F.
D .F.
F.D
F.D
F.D
F.D
F.D
F.D
EXISTING VAULT
F.F. 1922'-0"
UP
E A
S T S
TA
IR
S .F
S D D
H B
H B
H B
H B
H B
H B
H B
H B
E.
P.
E.
P.
AE
D
E.P
E.P
E.P
E.P
E.P.
E.P. E.P.
E.P
E.P
E.P
E.P.
E.
P
E.P. E.P. E.P.
E.P
E.P
E.P
E.P.
E.P.
E.P.
A127E STORAGE, GENERAL
C1A5 OTHER SPACE
B119
B126
B128
B118
B121
TOILET, GENERAL
KITCHEN, NOURISHMENT
STORAGE, GENERAL
OFFICE, VIST COORD.
OFFICE, CHIEF
A127F
B107
B113
B115
B116A
B114
B108
B107A
B110
B109A
B109
B112
B103
B102
B101B
B105
B104
B106
B103A
B101A
B111
B101
GROUP ROOM
DISHWASHING
MECHANICAL ROOM
OFFICE, STAFF
STORAGE, GENERAL
OFFICE, STAFF
OFFICE, STAFF
STORAGE, GENERAL
OFFICE, CHAPLAIN
KITCHEN, CANTEEN
STORAGE, GENERAL
OFFICE
DINING ROOM
TOILET, MALE
ATM
H.A.C.
OFFICE, STAFF
TOILET, FEMALE
OFFICE, STAFF
OFFICE, STAFF
OFFICE, STAFF
S2C1
S1C3 OTHER SPACE
OTHER SPACE
FC1A1
S1C2
S1A1
S1B1
FC1C1
FC1B1
C1C3
C1C2
C1B1
C1C1
C1B2
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
A119A
A127B
A127C
A127D
A127A
A122A
A127
A126
A124
A125
A123
A122
A119
POLICE SERVICES
OFFICE
TOILET, MALE
OFFICE, SECRETARY
OFFICE
OFFICE, WORKROOM
CONF RM/ ICC-EOC RM
OFFICE, SECRETARY
STORAGE, GENERAL
MECHANICAL ROOM
OFFICE, STAFF
OFFICE, STAFF
A102D
RM#
A103
A105
A104
A102
ROOM NAME
STORAGE, GENERAL
OTHER SPACE
TELECOM
C1A2
C1A3
C1A4
C1A1 OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
C107
C113
C112
C100
OFFICE, GENERAL
OFFICE, STAFF
TOILET, MALE
BREAKROOM
STORAGE, GENERAL
WAITING ROOM
A102A
A102B
A102C
A102 MEDICATION PREP.
NARCOTICS ROOM
STORAGE, GENERAL
STORAGE, GENERAL
A103A OFFICE, TRAVEL
A102 PHARMACY
A102E OFFICE, WORKROOM
A102F ANTI-ROOM
A102G UTILITY, CLEAN ROOM
A102H
A102I ANTI-ROOM
A102J STORAGE, GENERAL
A102K STORAGE, CLOSET
UTILITY, CLEAN ROOM
A102L STORAGE, GENERAL
OFFICE, STAFF
A121 OFFICE, STAFF
A127G HALL
B100 OFFICE, STAFF
B103B OFFICE, STAFF
OFFICE, STAFF
B110A CLOSET, GENERAL
B117 HALL
A142 OFFICE
A143 OFFICE
C112A OFFICE, STAFF
C112B OFFICE, STAFF
C112C OFFICE, STAFF
C111 TOILET, FEMALE
C111A NURSING MOTHER'S ROOM
C145A
C147
C146
LAB WORK
CLOSET, COMM
C145B TOILET, FEMALE
TOILET, MALE
C145C BLOOD DRAW
C145 WAITING, BLOOD LAB
D156 CASHIER
TRUE
NORTH
PLAN
NORTH
ICRA BARRIERS PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL MEET WITH THE COR TO
COORDINATE AND SUBMIT FOR APPROVAL PHASING OF THE WORK AND PLACEMENT OF ICRA
BARRIERS.
B. CONTRACTOR TO MAINTAIN ONE NEGATIVE PRESSURE ROOM BE AVAILABLE AT ALL TIMES, NO
EXCEPTIONS. COORDINATE WITH COR.
C. SEE SPECIFICATION 01 35 26 "SAFETY REQUIREMENTS" AND 01 35 26.01 "CONSTRUCTION RISK
ASSESSMENT" FOR DUST CONTROL DIRECTIONS.
D. PROVIDE ICRA BARRIER AND ENTRANCE DOOR LOCATIONS AS REQUIRED AND INDICATED ON
FLOOR PLANS. COORDINATE LOCATIONS WITH COR. BASIS OF DESIGN: STARC SYSTEMS.
E. CONTRACTOR SHALL SUBMIT A ICRA PLAN TO COR FOR APPROVAL.
F. ALL ICRA BARRIERS ARE LEVEL II UNLESS NOTED OTHERWISE
ICRA BARRIERS LEGEND
ICRA BARRIER LOCATIONS SUBJECT TO COR REVIEW AND APPROVAL.
ICRA LEVEL III
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
FIRST FLOOR PLAN - ICRA
GI003
1/16" = 1'-0"GI003
1 FIRST FLOOR PLAN - ICRA
SCALE:
B262
B262J
B259
B257
B262A B260
B258
B252
B254
B253
B250
B248
B299
B256
B247
B289
B246
A244
A240D
A238 A236
A200C
A200B
A200D E207
A239 A200
A237A
A239A
A237
A235
E201A
A200A
E202
A200E E200
A203
A201
A202
C207A
A230
A232A234
D200 C2-D2 C204
S2-A1
C207 C209
D208
C211
C298
C202A
C213 C213A
C206 C208 C208A
C216 C218
C215 C217 C219 C221 C223
C222A
C222
C208M
C208B
C208L C208C
C208K C208D
C208F C208J
C208H C208G
C208E
C2-A1
S2-C2
S2-B1 C2-B1
FC.2.B.1
FC2A.3
C 2-
C
FC
.2
.C .2
C211B
FC.2.A.2
A240
A242
A240B
A240A
A240C
B262G
B262H
B262C
B255
B251
C2-B2
D215
D209
D207
D211
D217
D218
D216
D203 D205D201
D206
D204A
D204
D208A
D210
C2-D5 D212
D214 C2-D4
E201B
C2-E2 E204
E206
E208
E210
E212
E214
E216
E218
E220
E222
E224
C2-E3
C2-E4
E211
E213
E209
E219
E223
E225E227 E221
C2-E5
C2-E6
E231 E229 E228A E228
C2-E6A
E226
E226A
E235
E233B
S2-E1
E233A
E233
C2-C1
FC.2.C.3
TROUGH
ST
FLO
O R
R O O F
R O O F
AC
C E
SS
LAD
D
ER
R O O F
AC
C E
SS
LAD
D
ER
RI DGE
ST
FLO
O R
R O O F
R O O F
R O O F
R O O F
(H
IG
H
R O O F
SLO
P E
STAN
D
IN
G
EAM
M
ETAL
AW
N
IN
G
STAN
D
IN
G
AW
N
IN
G
RI DGE
R O O F
LO
W
ER
R O O F
EN
TR
AN
C E C
AN
O P Y
R O O F
C
AN
O P Y R O O F
B
ELO
W
M R I B
LD
G
O O F
R O O F
B U
ILD
IN
G
B U
ILD
IN
G
SC
U P P
ER
SC
U P P
ER
SC
U P P
ER
SC
U P P
ER
SC
U P P
ER
B U
ILD
IN
G
SC
U P P
ER
SC
U P P
ER
SC
U P P
ER
SC
U P P
ER
SLOPE
M
EC
H M
EC
H
R O O F
SCUPPER
SCUPPER
R D A
R D B
R .D
R .D
R .D
R .D
R .D
R .D
R .D .R .D
R .D
R .D
R .D
R .D
R .D
R .D
R .D
R .D
R .D
R .D
FIR
E
S P R
IN
K
LE
VALVE
ELEC
TR
IC
AL
R
ISER
S
AC
C E
SS
P
AN
EL
AC
C E
SS
P
AN
EL
AC
C E
SS
P
AN
EL
STO
R
AG
E
C
AB
IN
ET
FIR
E S P R
IN
K
LER
R
IS
ER
AN
D
S P R
IN
K
LER
AC
C E
SS
P
AN
EL
SEISMIC JOINT
S K
YLIG
H T
X R
AY
EQ
U
IP
M
EN
T S
TO
R
AG
E
AC
C E
SS
P
AN
EL
FIR
E
S P R
IN
K
LE
VALVE
R O
LL-
U P
D O O R
R
ISER
AC
C E
SS
FLO
O R
F A C P
D N
U P
UP
DN
UP
DN
D N
U P
1m m
[1 1_
E.
P
E.
P
E.
P
E.
P
B
LD
G . 27
B
LD
G . 1
B
LD
G . 27
B
LD
G . 1
B262C
B262J
B289
B262H
B262G
B262A
B260
B262
B258
B259
B257
STAFF
EXAM
PATIENT TOILET
MECH
OFFICE
WAITING
STAFF TOILET
OFFICE, STAFF
STORAGE
C&P EXAM
D216
D215
D214
D209
D211
D210
D208A
D207
OTHER SPACE
TOILET
OTHER SPACE
OFFICE
OTHER SPACE
TOILET
OTHER SPACE
OTHER SPACE
A244 ELEC
B254
B255
B256
B252
B253
B251
B247
B250
B248
B246
MECH
C&P RECEPTION
OFFICE
C&P EXAM
OFFICE
C&P EXAM
CONFERENCE
OFFICE, SECRETARY
STORAGE
I.V. THERAPY
A242 RECEPTION
A203
A202
A201
A200A
A200
TELECOM
WAITING ROOM
OFFICE, HEAD NURSE
CLOSET
HSK
C208F TOILET
OTHER
C217 DIAGNOSTIC ULTRASOUND
D200
D205
D206
D204A
D203
D204
D201
C219
C221
C218
OTHER
OTHER
OTHER
OTHER SPACE
ELECTRICAL
OTHER
RESPIRATORY THERAPY
EXAM/TREAT
EXAM/TREAT
C216
C215
C214A
C213
C213A
C211
C208M
C209
C208K
C208H
C208J
C208G
CT. SCAN
CT. SCAN
OFFICE
MECH.
TOILET
LAB
STORAGE
PROCEDURE
OFFICE
TOILET
TOILET
PROCEDURE
C208
C208C
C208E
C208D
C208B
C208A
C207
C207A
C206
C202A
C204
VESTIBULE
DRESSING
X-RAY ROOM
OFFICE
OFFICE
X-RAY ROOM
CONFERENCE
VESTIBULE
DIAGNOSTIC RECEPTION
EQUIPMENT
WAIT
RM# ROOM NAME
A200B OFFICE, HEAD NURSE
A200C COOLER
A200D MICROBIOLOGY
A200E STAFF TOILET
A234 FEMALE TOILETS
A237 EXAM
A237A HOT LAB
A238 VASCULAR LAB
A239 -
A239A DRESSING
A240 WAITING
A240A ECHO
A240B ECHO
A240C STORAGE
A235 ELEVATOR VESTIBULE
A232 MALE TOILETS
A236 TREADMILL
A240CA STORAGE
B250 CONFERENCE
C222 EXAM/TREAT
C222A STORAGE
C223 CONFERENCE
D208 OFFICE
D212 OTHER SPACE
D217 OTHER SPACE
D218 TOILET
E201B
E201A
E200
OTHER SPACE
OTHER SPACE
OTHER SPACE
E204
OTHER SPACE
E205
OTHER SPACE
E208
E207
E206
OTHER SPACE
OTHER SPACE
OTHER SPACE
E209
OTHER SPACE
E210
OTHER SPACE
E213
E212
E211
OTHER SPACE
OTHER SPACE
OTHER SPACE
E214
OTHER SPACE
E216
OTHER SPACE
E220
E219
E218
OTHER SPACE
OTHER SPACE
OTHER SPACE
E221
OTHER SPACE
E222
OTHER SPACE
E225
E224
E223
OTHER SPACE
OTHER SPACE
OTHER SPACE
E226
OTHER SPACE
E226A
OTHER SPACE
E228
E231
E229
E228A
E233
E233A
E227
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
E235
OTHER SPACE
OTHER SPACE
E202
TRUE
NORTH
PLAN
NORTH
ICRA BARRIERS PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL MEET WITH THE COR TO
COORDINATE AND SUBMIT FOR APPROVAL PHASING OF THE WORK AND PLACEMENT OF ICRA
BARRIERS.
B. CONTRACTOR TO MAINTAIN ONE NEGATIVE PRESSURE ROOM BE AVAILABLE AT ALL TIMES, NO
EXCEPTIONS. COORDINATE WITH COR.
C. SEE SPECIFICATION 01 35 26 "SAFETY REQUIREMENTS" AND 01 35 26.01 "CONSTRUCTION RISK
ASSESSMENT" FOR DUST CONTROL DIRECTIONS.
D. PROVIDE ICRA BARRIER AND ENTRANCE DOOR LOCATIONS AS REQUIRED AND INDICATED ON
FLOOR PLANS. COORDINATE LOCATIONS WITH COR. BASIS OF DESIGN: STARC SYSTEMS.
E. CONTRACTOR SHALL SUBMIT A ICRA PLAN TO COR FOR APPROVAL.
F. ALL ICRA BARRIERS ARE LEVEL II UNLESS NOTED OTHERWISE
ICRA BARRIERS LEGEND
ICRA BARRIER LOCATIONS SUBJECT TO COR REVIEW AND APPROVAL.
ICRA LEVEL III
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
SECOND FLOOR PLAN - ICRA
GI004
1/16" = 1'-0"GI004
1 SECOND FLOOR PLAN - ICRA
SCALE:
A300DA300C
A300B
A300E
A301
A300A300A
C311 C313 C315
C319 C321 C325 C327 C329A C329B C329C
C329D C329
C329EC329F
C320 C326
C318 C320 C322 C324
S3-C2
C399
C399
CC-3E
C3-C1
C314 C
C310C308
C312
C306C302
S3-C1
C303
C307
C3-A1 A333
A333A A331
A334A
A330A332A334BA334
A337
A335B
A335 A337A
A399
A336
A338
A340
C3-A2A342
A344
B346
B346A
B34
B350
B352
B350A
B352A
B345A
B345
S3-B1
B347B347AC3-B1
B349
B351
B349A
B353
B355
C3-B2
B356
B354
B358
B358A
B358B
B358D
B399
B35 8C
A302
A33
C305
A335A
LP
R
R.D.
R.D.
R.D.
UP
DN
UP
UP
M
GVA
D .F.
E.
P
E.
P
E.
P
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
C3B1
C3C1
C3A1
C3C2
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
FC3B1
FC3C2
FC3C1
FC3A1
OTHER SPACE
OTHER SPACE
OTHER SPACE
S3C1
S3C2
S3B1
OFFICE, STAFF
BREAK ROOM
OFFICE, STAFF
C329F
C329E
C329D
C329C OFFICE, STAFF
C329B OFFICE, STAFF
C329A OFFICE, STAFF
OFFICE, GENERALC329
C323
C325
C327
STORAGE, VOLUNTEER
C321
C319
C317
C315
C313
C312
C310
MECHANICAL ROOM
C308
C307A
TOILET, CONGREGATEC307
LOBBY, WAITINGC306
STORAGE, GENERALC305
HOUSEKEEPINGC303
LOBBY, WAITINGC302
BED ROOM - 1 BEDB345
A399 OTHER SPACE
A337
A336
A337A
A339
A342
A344
A340
TOILET, STAFF
UTILITY ROOM, SOILED
OFFICE, STAFF WORKROOM
LAUNDRY
ELECTRICAL ROOM
MECH/ELECTA335B
TOILET, DETOXA335A
PATIENT ROOM - 2 BEDA335
VESTIBULEA334
OFFICE, STAFFA332
A330
LOBBY, ELEVATORA320
TOILET, FEMALEA301
OFFICE, WAITINGA300
RM# ROOM NAME
OFFICE, GENERALA300A
OFFICE, GENERALA300B
OFFICE, RECEPTIONA300C
OFFICE, GENERALA300D
OFFICE, GENERALA300E
OFFICE, STAFF
TOILET, SECLUSIONA334A
PATIENT RM, SECLUSIONA334
NURSE STATIONA333
MED ROOMA333A
A331 LOBBY, ELEVATOR
TOILET, DETOX
PATIENT ROOM - 2 BED
A338 LOUNGE, OUTPATIENT
TOILET, PATIENTB345A
BED ROOM - 1 BEDB346
TOILET, PATIENTB346A
BED ROOM - 1 BEDB347
TOILET, PATIENTB347
UTILITY, CLEAN LINENB348
BED ROOM - 1 BEDB349
TOILET, PATIENTB349A
BED ROOM - 2 BEDB350
TOILET, PATIENTB350A
BED ROOM - 1 BEDB352
TOILET, PATIENTB352A
OFFICE - EXAMB353
OFFICE, GENERALB354
B355
B356
OFFICE, GENERAL
OFFICE, GENERAL
TOILET, ACCB350
B358 DAY ROOM
B358A OFFICE, GENERAL
B358B OFFICE, GENERAL
B358C STAIRWAY
EXAM/TREATMENT RM
OFFICE, RNC311
EXAM/TREATMENT RM
EXAM/TREATMENT RM
EXAM/TREATMENT RM
EXAM/TREATMENT RM
EXAM/TREATMENT RM
EXAM/TREATMENT RM
EXAM/TREATMENT RM
C320 EXAM/TREATMENT RM
C322
EXAM/TREATMENT RMC324
C314 UTILITY, DIRTY
C316 UTILITY, CLEAN
C318 EXAM/ECHO
MECHANICAL CHASE
MECHANICAL CHASE
EXAM/TREATMENT RM
OTHER SPACEC326
OC
TRUE
NORTH
PLAN
NORTH
ICRA BARRIERS PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL MEET WITH THE COR TO
COORDINATE AND SUBMIT FOR APPROVAL PHASING OF THE WORK AND PLACEMENT OF ICRA
BARRIERS.
B. CONTRACTOR TO MAINTAIN ONE NEGATIVE PRESSURE ROOM BE AVAILABLE AT ALL TIMES, NO
EXCEPTIONS. COORDINATE WITH COR.
C. SEE SPECIFICATION 01 35 26 "SAFETY REQUIREMENTS" AND 01 35 26.01 "CONSTRUCTION RISK
ASSESSMENT" FOR DUST CONTROL DIRECTIONS.
D. PROVIDE ICRA BARRIER AND ENTRANCE DOOR LOCATIONS AS REQUIRED AND INDICATED ON
FLOOR PLANS. COORDINATE LOCATIONS WITH COR. BASIS OF DESIGN: STARC SYSTEMS.
E. CONTRACTOR SHALL SUBMIT A ICRA PLAN TO COR FOR APPROVAL.
F. ALL ICRA BARRIERS ARE LEVEL II UNLESS NOTED OTHERWISE
ICRA BARRIERS LEGEND
ICRA BARRIER LOCATIONS SUBJECT TO COR REVIEW AND APPROVAL.
ICRA LEVEL III
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
THIRD FLOOR PLAN - ICRA
GI005
1/16" = 1'-0"GI005
1 THIRD FLOOR PLAN - ICRA
SCALE:
A400C
A420A
C4-B1 B452A
A426A
A434
A440
A438
A435
A436
C4-A3
B448
A442
C4-A4
B450
B448A
B452 B449A
S4-B1
B449
A425
A428
A430
A426
A429
C4-A3
A422 A424
C4-A1
A423
A427
A431
A433 A400B
A400A
B455AB456
B454A
B454
B456A
B458 B457A
B453
B455
B453A
C406A
C409
C408
C405
A420 C404
C4-A2 A402
C404A C406
S4-C1
A400F
A401
A400
A400D A400E
A400G
A400G
C412C410A C410
C4-C1
C411A C411
C412A C414
C413AC413 C415
S4-C2B
C414A
S4-C2A
C415A
B457
U P
D N
D N
U P
DN
UP
E.P.
E.
P
E.
P
E.
P
B545A
B543A B544
B544A
B544
C5-B2
B541
B541
C5-B1
B542A
S5-B1
B540
A530D
B539A
A535
A537
A533
A500C A500BA
A527
A500B
A529
A531
A502 A500D
A500E
A501
A503
A505
A502
C5-A1
S5-A1
A530A A524
A526 A523 A520
A522 A504 C508
C510
C514A
C513A
C5
C513
C5-A1
C514 C516
C515A
C516A
C518 C518A
C517A C517
S5-C1
A530C
A530B
C515
A530
A501A
C5-A2
A500F
C5-A
B538A
B541A
B539A
B545
B547
B546 B546A
B542
F .E
F .E .C
F .E .C
D N
U P
D
NU
P
U P
DN
UP
H W
H W
H W
H W
H W
H W
STAN
D P
IP
E
M
AIL
D R O P
FIR
E
AN
N O U
FIR
E
ALAR
M
MECH.
EXHAUST
H W
H/W
H W
MED
CAB
MED
CAB
H/W
IC
E
24" ACCESS
DOOR
CYCLO
FLUSH
H/W
H/W
H/W
H/W
P B
PB
E.
P
E.P
E.P
E.P.
E.P.
E.P.
E.
P.
E.
P.
E.P
E.P
E.P
B546
B547
B545
B542A
B544A
B542
B539
B541A
B541
B540
B538A
A533
A529
BED ROOM - 1 BED
BED ROOM - 1 BED
BED ROOM - 2 BED
BED ROOM - 1 BED
BED ROOM - 1 BED
BED ROOM - 2 BED
TOILET, PATIENT
TOILET, PATIENT
TOILET, PATIENT
UTILITY ROOM, CLEAN
UTILITY ROOM, CLEAN
A504
A527
A502A
A503
A502
A501
FUNCTION
LOBBY, ELEVATOR
CLOSET, UTILITY
OFFICE, WORKCOPY
STAFF LOCKER ROOM
CLOSET, TELEPHONE
TOILET, STAFF
C514A
OTHER SPACEC5C1
S5C2
S5C1
FC5B1
S5B1
FC5C1
FC5A1
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
C5A1
C5B2
C5B1
C518
C518A
C517
C517A
C516A
C515A
C516
C515
OTHER SPACE
OTHER SPACE
OTHER SPACE
# FUNCTION
C508
C513
C514
C513A
C511
C510
PROCEDURE ROOM
TOILET, PATIENT
NEURO/IDC
UTILITY ROOM, CLEAN
OFFICE, GENERAL
PACE MAKER
TOILET, PATIENT
PULOINARY
TOILET, PATIENT
PROCEDURE
TOILET, PATIENT
CARDIO
TOILET, PATIENT
CARDIO
TOILET, PATIENT
A501A TOILET, PUBLIC
A500BA COMM
A500C STORAGE, SPD SUPPLIES
A500D STORAGE, RT
A500E OFFICE, GENERAL
A500F OFFICE, CONFERENCE RM
A500B CLOSET, ELECTRICAL
A505
LOBBY, WAITING
OFFICE, COUNSELINGA520
OFFICE, GENERALA522
OFFICE, NURSE ED/PHARMA523
MECHANICAL ROOMA524
NUTRITIONA526
A530 ICU
A530A ICU BED
A530B ICU BED
A530C ICU BED
CLOSET, ELECTRICALA534
THERAPY, HYDROA535
CLOSET, UTILITYA537
A530D BED ROOM - 1 BED
B539A TOILET, PATIENT
B544
TOILET, PATIENT
B543A
B543 BED ROOM - 1 BED
BED ROOM - 1 BED
TOILET, PATIENT
B545A TOILET, PATIENT
B546A TOILET, PATIENT
TOILET, CONGREGATE
C4-B7
C4-B5
C4-B6
C4-B3
C4-B4
TELE/COMMA402
OFFICE, GENERALA401
TOILET, STAFFA400H
A400G
CLOSET, STAFFA400F
A400E
A400D
A400C
OFFICE, GENERALA400B
HALLWAYA400
C4-A1 CORRIDOR
ELEVATOR LOBBYC4-A2
BED ROOM - I BEDA420
CORRIDORC4-B1
C4-A5 HALLWAY
C4-A4 CRASH CART ALCOVE
A442
A434
HOUSEKEEPING
A438 OFFICE
A440
A436 STAFF TOILET
A433 HYDRO-THERAPY
A429 MECHANICAL
A430
A428
A427 STORAGE, SPD
A426 LOBBY, WAITING
A426A TOILET, PUBLIC
A423 LOBBY, ELEVATOR
A425 CLEAN LINEN STORAGE
A424 OFFICE, GENERAL
A422
A420A TOILET, PATIENT
HALLWAYC4-A3
CLOSET, SOILED UTILITYA431
TOILET, PATIENTB448A
CLOSET, ELECTRICALB446
TOILET, PATIENTB449A
SIM ROOMB449
B450
TOILET, PATIENTB452A
BED ROOM, PFT/PROCB452
B453A
B453
B454A
B454
B455A
B455
A435 PHARMACY
STORAGE ALCOVE
STORAGE ALCOVE
FIRE SPRINKLER CLOSET
STORAGE ALCOVE
MEDICATION STATION
EXISTING ELECTRICAL
STAFF BREAK ROOM
EQUIPMENT STORAGE
OFFICE, GENERAL
C4-C3 STORAGE ALCOVE
C4-C4 FIRE SPRINKLER CLOSET
MEDICATION STATIONC4-C2
C4-C1 CORRIDOR
C414
C414A
TOILET, PATIENTC415A
BED ROOM - 1 BEDC415
C412A
C412
C413A
C413
C410A
C410
C411A
C411
CLOSET, SOILED UTILITYC408
OFFICE / TRANSCRIBEC409
C406A
C406
STORAGE, SPDC405
C404A
C404
B456A
ISOLATION ROOMB456
B457A
ISOLATION ROOMB457
B458 STAFF TOILET
RM# ROOM NAME
TOILET, PATIENT
TOILET, PATIENT
TOILET, PATIENT
TOILET, PATIENT
TOILET, PATIENT
TOILET, PATIENT
TOILET, PATIENT
TOILET, PATIENT
BED ROOM - 1 BED
BED ROOM - 1 BED
BED ROOM - 1 BED
BED ROOM - 1 BED
BED ROOM - 1 BED
TOILET, PATIENT
BED ROOM - 1 BED
BED ROOM - 1 BED
CLOSET, NURSE CALLA400A
OFFICE, GENERAL
OFFICE, GENERAL
OFFICE, GENERAL
OFFICE, GENERAL
BED ROOM - I BED
NOURISHMENT
A434 STORAGE, EQUIPMENT
A435 OFFICE, GENERAL
A436 TOILET, STAFF
A438 OFFICE, GENERAL
A440 BREAK ROOM, STAFF
B448 BED ROOM - 2 BED
BED ROOM - I BED
TOILET, PATIENT
HOME O2
TOILET, PATIENT
BED ROOM - I BED
TOILET, PATIENT
B456A
B456 BED ROOM - I BED
TOILET, PATIENT
B457A
B457 BED ROOM - I BED
TOILET, PATIENT
B458 TOILET, CONGREGATE
RM# ROOM NAMERM# ROOM NAME
TRUE
NORTH
PLAN
NORTH
ICRA BARRIERS PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL MEET WITH THE COR TO
COORDINATE AND SUBMIT FOR APPROVAL PHASING OF THE WORK AND PLACEMENT OF ICRA
BARRIERS.
B. CONTRACTOR TO MAINTAIN ONE NEGATIVE PRESSURE ROOM BE AVAILABLE AT ALL TIMES, NO
EXCEPTIONS. COORDINATE WITH COR.
C. SEE SPECIFICATION 01 35 26 "SAFETY REQUIREMENTS" AND 01 35 26.01 "CONSTRUCTION RISK
ASSESSMENT" FOR DUST CONTROL DIRECTIONS.
D. PROVIDE ICRA BARRIER AND ENTRANCE DOOR LOCATIONS AS REQUIRED AND INDICATED ON
FLOOR PLANS. COORDINATE LOCATIONS WITH COR. BASIS OF DESIGN: STARC SYSTEMS.
E. CONTRACTOR SHALL SUBMIT A ICRA PLAN TO COR FOR APPROVAL.
F. ALL ICRA BARRIERS ARE LEVEL II UNLESS NOTED OTHERWISE
ICRA BARRIERS LEGEND
ICRA BARRIER LOCATIONS SUBJECT TO COR REVIEW AND APPROVAL.
ICRA LEVEL III
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
FOURTH AND FIFTH FLOOR PLANS - ICRA
GI006
1/16" = 1'-0"GI006
1 FOURTH FLOOR PLAN - ICRA
1/16" = 1'-0"GI006
2 FIFTH FLOOR PLAN - ICRA
SCALE:
A637
B654
B655
C6-B1
S6-B1
A637B
FC.6.B.1
A601
A635
A633
C6-A1
A636
A637 A
A638
A632 A632
A630
A630
C608
A628 A606 C610
A606A
C612
C608
C616
C618 C624A
C622
C624 C626
C623 C625C619C617
C619
C621C617A
C6115
A602
A603
A605 C607
S6-C1
C612A
S6-C2
C625A
C624A
C620
C613A
C613
A601AA601B
A600
A637B
A637C
C6-A2
B653
B651
B649
B647
B645
B652
B650
B648
B646
B656
C6-B2
B656
C6-C1
D N
U P
DN
UP
B753
B751
B749
B747
B745
B743
B754
B752
B750
B748
B746
B744
C7-B2
B755
S7-B1
FC.7.B.1B742
B740
B738
B739
B737
A735
A736
A734
A734A
A734B
A734C
S7-C1
A704A
C708
FC.7C.1
C709 C713 C715
C713A
C717
C719 C721 C721A
C710
C712
C710A
C714 C716 C720 C722 C722A
C718
S7-C2
A728
A729
A732
A730
A731
A733
A733A
C7-A1
C708A
A726
A704
A706
A702
A700
A703
A701
C7-C1
A701A
U P
U P
D N
U P
UP
DN
FIR
E S P R
IN
K
LER
STAN
D P
IP
E
ELE
C
TR
IC
R
AC
EW
AYS
R O
LL-
U P
D O O R
FIR
E S P R
IN
K
VALVE
R
IS
ER
LOW WALL
ELE
C
P
AN
E
LS
FIR
E S P R
IN
K
LER
ZO
N E
VALVE
F.D
D .F.
D .F.
F.D
D .F.
A708 STORAGE, GENERAL
B704
B706G
B706H
B706F
B706B
B706E
B706D
B706C
B706A
B705
B701
B702
B700
A713
A712
A710
A711
A709C
A709B
A709A
A709
OFFICE, STAFF
OFFICE, SECRETARY
ON-CALL BEDROOM
OFFICE, STAFF
OFFICE, STAFF
OFFICE, STAFF
OTHER SPACE
TOILET, FEMALE
STORAGE, GENERAL
ON-CALL BATH
CLOSET, TELEPHONE
STORAGE, GENERAL
MULTIPURPOSE ROOM
OFFICE, PHYSICIAN
OFFICE
OFFICE
TOILET, FEMALE
OTHER SPACE
TOILET, CONGREGATE
OFFICE, STAFF
STORAGE, EQUIPMENT
RM#
A703A
A705
A706
A707
A704
A703B
A701A
A702
A703
A700
A701
ROOM NAME
CREDIT UNION
OFFICE
OFFICE, CLERK
OTHER SPACE
OFFICE, STAFF (MCCR)
OFFICE, STAFF (MCCR)
MECHANICAL ROOM
STORAGE, GENERAL
STORAGE, GENERAL
STORAGE, GENERAL
OFFICE, STAFF (MCCR)
C708 OFFICE, CHIEF
C717A TOILET, FEMALE
FC7A1
S7C2
S7C1
S7B1
FC7C1
FC7B1
C7B1
C7C1
C7A1
OTHER SPACE
OTHER SPACE
OTHER SPACE
STAIRWELL
STAIRWELL
STAIRWELL
OTHER SPACE
OTHER SPACE
OTHER SPACE
C715A
C717
C715
C712A
C713
C713A
C712
C711
C710A
C710
C709
C708A
TOILET, MALE
OFFICE, SECRETARY
TOILET, FEMALE
TOILET, FEMALE
OFFICE, STAFF
OFFICE, SOCIAL WORKER
OFFICE, SOCIAL WORKER
OFFICE, SOCIAL WORKER
OFFICE, STAFF
TOILET, MALE
STORAGE, GENERAL
TOILET, MALE
ROOM NAMERM#
C704A
C706A
C707A
C707
C705
C706
C701A
C702
C704
C700
C701
TOILET, FEMALE
OFFICE, PHYSICIAN
OFFICE, CLERK
TOILET, FEMALE
TOILET, MALE
OFFICE, STAFF
OFFICE, PHYSICIAN
TOILET, FEMALE
STORAGE, GENERAL
OFFICE, STAFF
H.A.C.
STAIRWELLS6B1
B655
B656
B654
B653 OFFICE, GENERAL
S6C1
S6C2
STAIRWELL
STAIRWELL
B650
B652
B651
B649
B648
B647
B645
B646
A637
A638
A636
A635
A632
A633
OFFICE, STAFF
STORAGE, GENERAL
OTHER SPACE
EXAM/PROCEDURE RM
SOILED, HOUSEKEEPING
HOUSEKEEPING
BREAK ROOM
POST-OP
PACU
TELECOMM
SOILED UTILITY
A604A
A606A
A630A
A630
A631
A605
A606
A602
A603
A604
A600
A601
OFFICE, GENERAL
CLOSET, TELEPHONE
EXAM/TREATMENT RM
TOILET, MALE PATIENT
EXAM/TREATMENT RM
TOILET, MALE PATIENT
STORAGE, GENERAL
TOILET
OTHER SPACE
H.A.C
FC6B1
FC6C1
FC6A1
C6A4
C6B1
C6B2
C6A1
C6A2
C6A3
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
C623
C624A
C626
C626A
C623A
C624
C622
C621
C621A
C619
C620
C618
OTHER SPACE
TOILET, MALE
EXAM/TREATMENT RM
STORAGE, GENERAL
STORAGE, GENERAL
STORAGE, GENERAL
EXAM/TREATMENT RM
TOILET, MALE
EXAM/TREATMENT RM
RM# ROOM NAME
C612
C613A
C614
C616
C617
C613
C612A
C610
C608
C607
EXAM/TREATMENT RM
TOILET, MALE
OFFICE, STAFF
EXAM/TREATMENT RM
Z CORRIDOR
EXAM/TREATMENT RM
C624A
C625
TOILET, MALE
EXAM/TREATMENT RM
C615 TOILET, MALE
C617A TOILET, ISOLATION
EXAM/TREATMENT RM
C606 STORAGE, GENERAL
SOILED LINEN
EXAM/TREATMENT RM
EXAM/TREATMENT RM
EXAM/TREATMENT RM
EXAM/TREATMENT RM
STORAGE, GENERAL
A601A OFFICE, GENERAL
A601B OFFICE, GENERAL
OFFICE, GENERAL
WAITING ROOMA628
A636A STORAGE, CLEAN
A637A ELEC CLOSET
A637B STORAGE, GENERAL
A637C
A637D
STORAGE, CLEAN
TOILET
A643 PRE-OP
EXAM/PROCEDURE RM
EXAM/PROCEDURE RM
EXAM/PROCEDURE RM
EXAM/PROCEDURE RM
EXAM/PROCEDURE RM
TOILET, MALE
RM# ROOM NAME
TRUE
NORTH
PLAN
NORTH
ICRA BARRIERS PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL MEET WITH THE COR TO
COORDINATE AND SUBMIT FOR APPROVAL PHASING OF THE WORK AND PLACEMENT OF ICRA
BARRIERS.
B. CONTRACTOR TO MAINTAIN ONE NEGATIVE PRESSURE ROOM BE AVAILABLE AT ALL TIMES, NO
EXCEPTIONS. COORDINATE WITH COR.
C. SEE SPECIFICATION 01 35 26 "SAFETY REQUIREMENTS" AND 01 35 26.01 "CONSTRUCTION RISK
ASSESSMENT" FOR DUST CONTROL DIRECTIONS.
D. PROVIDE ICRA BARRIER AND ENTRANCE DOOR LOCATIONS AS REQUIRED AND INDICATED ON
FLOOR PLANS. COORDINATE LOCATIONS WITH COR. BASIS OF DESIGN: STARC SYSTEMS.
E. CONTRACTOR SHALL SUBMIT A ICRA PLAN TO COR FOR APPROVAL.
F. ALL ICRA BARRIERS ARE LEVEL II UNLESS NOTED OTHERWISE
ICRA BARRIERS LEGEND
ICRA BARRIER LOCATIONS SUBJECT TO COR REVIEW AND APPROVAL.
ICRA LEVEL III
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
SIXTH AND SEVENTH FLOOR PLANS - ICRA
GI007
1/16" = 1'-0"GI007
1 SIXTH FLOOR PLAN - ICRA
1/16" = 1'-0"GI007
2 SEVENTH FLOOR PLAN - ICRA
SCALE:
B812
B818
B899
B809
B814
B816
B810
B807
B808
B806
B810A
B803D
B803C B803A B803B
A800B
A805
A800
A800A
A804
A809
A809A
A802
A807 A811
A804A A808
S8-A1 A806
A813
S8-A2
A808A B801
B803
A800C
B800A
B804
B801
B802
C8-B1
A801
B806A
FC-8B-1
S8-B1
A800D
FC-8A-1 C8-A2
C8-B1
R .D
R .D
TH
FLO
O R
R O O F
D N
U P
D N
UP
UP
DN
UP
M .G .V.
M .G .V.
R
ETU
R N
AIR
R
ETU
R N
AIR
M .G .V.
M .G .V.
M .G .V.
M .G .V.
M .G .V.
M .G .V.
M .G .V.
M .G .V.
M .G .V.
M .G .V.
R
ETU
R N
AIR
R
ETU
R N
AIR
M .G .V.
M .G .V.
M .G .V.
M .G .V.
N V A
N AVN AV
N AV HOSE
REEL
HOSE
REEL
HOSE
REEL
HOSE
REEL
R
ETU
R N
AIR
F.D
F.D
D .F.F.D
F.D
D .F.
ALAR
M
P
AN
EL
E.P
E.P
E.P. E.P.
E.P.
E.
P
E.
P
E.P
E.
P.
E.
P.
E.P.
E.P.E.P.
E.P.
A900A
A900
A900B
S9-A1
A999
A999
D N
U P
F .E
TH
FLO
O R
R O O F
R .D
R .D
R .D
R .D
R .D
R .D
R .D
E.P
E.P
E.P
E.P
H
ATC
H
C O
VER
LADDER
D U C T
STAIR
VER
D
C T
STAIR
C T
LOUVER
LOUVER
LOUVER
FLOOR OPENING
ROOF LADDER
SCUPPER
SCUPPER
SLOPE
STAIROVER DUCT
D U C T
DOWN
LOUVERLOUVERLOUVER
D N
LOUVER LOUVER
PLYWOOD
SCUPPER
AC
C E
SS
H
ATC
H
TH
FLO
O R
R O O F
R O O F
LAD
D
ERR
.D
R .D
A1099 A1000
S8A2
S8B1
C8A2
FC8B1
S8A1
C8B1
FC8A1
C8A1
STAIRWELL
STAIRWELL
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
STAIRWELL
A1199
S10A2 STAIRWELL
OTHER SPACE
ROOM NAMERM#
A1000
A1099
S9A2
A900B
A999
S9A1
A900
A900A
STAIRWELL
MECHANICAL ROOM
OTHER SPACE
MECHANICAL ROOM
MECHANICAL ROOM
MECHANICAL ROOM
OTHER SPACE
STAIRWELL
B899
B816
B898
B814
LOUNGE
OTHER SPACE
OTHER SPACE
BED ROOM - 3 BED
STORAGE, EQUIPMENTA804A
B801
B807
B809
B810
B808
B804
B806A
B806
B803A
B803B
B803C
B803D
B803
B802
A809
B800A
B800
A809A
A813
A811
A808
A807A
A808A
A805
A806
A807
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OFFICE, HEAD NURSE
LINEN ROOM, SOILED
TOILET, FEMALE
LOCKER ROOM
OFFICE, STAFF
STORAGE, GENERAL
LOCKER ROOM
STORAGE, WARD SUPPLIES
DRESSING ROOM
OPERATING ROOM
OPERATING ROOM
STORAGE, GENERAL
OPERATING ROOM
MECHANICAL ROOM
OTHER SPACE
DARK ROOM
STORAGE, GENERAL
OTHER SPACE
STORAGE, GENERAL
H.A.C.
H.A.C.
A803
A803A
A804
A801A
A801C
A802
A800B
A800C
A800D
A801
A800
A800A
DRESSING ROOM
STORAGE, GENERAL
STORAGE, WARD SUPPLIES
STORAGE, GENERAL
MECHANICAL, GENERAL
OPERATING ROOM
X-RAY CONTROL RM
OTHER SPACE
MECHANICAL ROOM
OTHER SPACE
STORAGE, GENERAL
UTILITY ROOM, CLEAN
B810A MECHANICAL ROOM
LLL
L
L
L
OC
TRUE
NORTH
PLAN
NORTH
ICRA BARRIERS PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL MEET WITH THE COR TO
COORDINATE AND SUBMIT FOR APPROVAL PHASING OF THE WORK AND PLACEMENT OF ICRA
BARRIERS.
B. CONTRACTOR TO MAINTAIN ONE NEGATIVE PRESSURE ROOM BE AVAILABLE AT ALL TIMES, NO
EXCEPTIONS. COORDINATE WITH COR.
C. SEE SPECIFICATION 01 35 26 "SAFETY REQUIREMENTS" AND 01 35 26.01 "CONSTRUCTION RISK
ASSESSMENT" FOR DUST CONTROL DIRECTIONS.
D. PROVIDE ICRA BARRIER AND ENTRANCE DOOR LOCATIONS AS REQUIRED AND INDICATED ON
FLOOR PLANS. COORDINATE LOCATIONS WITH COR. BASIS OF DESIGN: STARC SYSTEMS.
E. CONTRACTOR SHALL SUBMIT A ICRA PLAN TO COR FOR APPROVAL.
F. ALL ICRA BARRIERS ARE LEVEL II UNLESS NOTED OTHERWISE
ICRA BARRIERS LEGEND
ICRA BARRIER LOCATIONS SUBJECT TO COR REVIEW AND APPROVAL.
ICRA LEVEL III
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
EIGHTH, NINTH AND PENTHOUSE FLOOR PLANS
- ICRA
GI008
1/16" = 1'-0"GI008
1 EIGHTH FLOOR PLAN - ICRA
1/16" = 1'-0"GI008
2 NINTH FLOOR PLAN - ICRA
1/16" = 1'-0"GI008
3 TENTH FLOOR PLAN - ICRA
SCALE:
B006
B014AB014C
B010
B008
B012
B006
A004C
A00
B002
B001
B003
B007A B007
B00 9A
B005F
CB-B2
B016
B014B
B018
B018B
B005B
B00 5G
B005A
B005D
B005E
B005C B013
B01
B009
SB-B1
A005 C005B
C005E
A007C
A002A
A002 A002B
A009A
A017A
A010
A017B
C003A A009
A008 C001
C003
C005
C002
C002B
C004A C004
C002C
C005A
A007
A007A A007B
C005D
C005C
SB-C3
B017
A006B
A003
A006A
D008L
D008M D008N
D008
E007
E004
C002A
D008E
D008A
D008B
D008HD008KD008F
B014D
A006
C005F
E034A
E034B
E036
S E
-1
B001
B018C
B01 6A
B01 8A
UP
R
AM
P
D N
U P
UP
DN
U P
U P
DN
U P
U P
FIR
E S P R
IN
K
LER
R
ISER
R
ISER
H .O
H .O
ALAR
M
P N L
ATS
ATS
ATS
ATS 6
ATS 1
ATS 2
SW
ITC
H
G E
AR
ELEC
M
IN
M
IN
E.
P
E.
P
E.
P
E.
P
E.
P
E.
P
SHOP, BIOMEDB007
B018C
B018B
B018A
B017B
B017A
B016A
B009A
B007A
B016
B018
B017
B010
B009
B008
STORAGE GENERAL
DOCK
LINEN ROOM, CLEAN
MORGUE
MORGUE
STORAGE, WARD SUPPLIES
MECHANICAL ROOM
MECHANICAL ROOM
CLOSET
STORAGE, GENERAL
MECHANICAL ROOM
RECYCLING
MECHANICAL ROOM
STORAGE, GENERAL
TOILET, FEMALE
B005G
B005F
B005E
B005D
B005C
B005B
B005A
B003A
A009A
A007C
A007B
A007A
A006B
B001
B006
B004
B003
B002
A010
A009
A008
A007
OFFICE, CHIEF
OFFICE, IT
PIPE SHOP
HSK SHOP
STORAGE, GENERAL
COMPUTER ROOM
OFFICE, STAFF
OFFICE, IT
OTHER SPACE
STORAGE, DRY GOODS
REFRIG., WALK-IN
CORRIDOR
REFRIG., WALK-IN
H.A.C.
KITCHEN, DIETETICS
A006A
A004C
A004A
A002B
A002A
A004
A006
A005
A003
A002
STORAGE, GENERAL
STORAGE, GENERAL
REFRIG., WALK-IN
FREEZER, WALK-IN
STORAGE, GENERAL
LINEN CHUTE
OFFICE, STAFF
VESTIBULE, COOLER/FRZR
REFRIG., WALK-IN
SB-C3
SB-B1
OTHER SPACE
OTHER SPACE
C005F
C005E
C005D
C005C
STORAGE, FILE ROOM
STORAGE, FILE ROOM
STORAGE, GENERAL
STORAGE, FILE ROOM
C003
C004A
C005B
C005A
C005
C004
C003A
C002C
C002B
C002A
C002
C001
LOCKER ROOM
MECHANICAL ROOM
OTHER SPACE
BATH/SHOWER ROOM
LOCKER ROOM
BATH/SHOWER ROOM
STORAGE, GENERAL
STORAGE, GENERAL
STORAGE, GENERAL
HOUSEKEEPING
KITCHEN, DIETETICS
MECHANICAL ROOM
RM# ROOM NAME
B014A
B015
B012
B013
B011
STORAGE, WARD SUPPLIES
CLOSET, TELEPHONE
BATH/SHOWER ROOM
OTHER SPACE
OFFICE, GENERAL
STORAGE, GENERAL
STORAGE,GENERAL
A017A MECHANICAL
A017B MECHANICAL
D008 MECHANICAL ROOM
D008A OFFICE, GENERAL
D008B LRC
D008E WORKROOM
D008F VESTIBULE
D008H LOCK SHOP
D008K OFFICE, GENERAL
D008L ELECTRICAL
D008M COMMUNICATIONS
D008N OFFICE, GENERAL
--- HALL
--- CORRIDOR
B005 VAULT
OFFICE, STAFF
OFFICE, STAFF
OFFICE, STAFF
OFFICE, STAFF
B006A OFFICE, IT
B014B ---
B014C MAIL ROOM
B014D OFFICE, GENERAL
GROUP BDGROUP BE
GROUP BB
GROUP BA
GROUP BC
PHASING PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL COORDINATE
PHASING OF WORK AND ICRA BARRIER LOCATIONS. SUBMIT TO THE COR
FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK.
B. REFER TO ICRA FLOOR PLANS FOR ADDTIONAL INFORMATION.
BARRIERS.
C. REFER TO GI002 FOR ADDITIONAL PHASING REQUIREMENTS.
PHASING PLAN LEGEND
GROUPS OF WINDOW REPLACEMENT
LOCATIONS OF WINDOW REPLACEMENT FROM THE
EXTERIOR WHERE INTERIOR IS INACCESSIBLE
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
PA DPB
668-24-102
07-25-2025REVISIONS:
A
B
C
D
E
F
REPLACE WINDOWS BUILDING 1
SPOKANE, WASHINGTON
BASEMENT FLOOR PLAN - PHASING
GI009
1/16" = 1'-0"GI009
1 BASEMENT FLOOR PLAN - PHASING
SCALE:
C1-B1
A125
A127A
B101
A127E
B117 B114
A127F
A127C
A127D
A127B
B112
A127
B116A
B126
B100
B121
B119
B115
B105
B103
A126
A123
A124
B101A
B103A
B110
B107A
B109
B106
B108
B111
B107
B113
B109A
B103B
A103A
A103
A105
D105D118D120 D118A D156
CID6
A119
A122A
A122
C1-A1
A121
A119A
A102
C1-A4
A102E
A102B
S1-A1
D107
C1D2
A102D
A102C
A143
A142
C100
D123
D124 D125
D122
C144
D116
D117
D126 D120
D115
C111
S1-C2
C107 C113
C145D
C145
C145B
C110
C1-C1
C106B
C145E C112B
C1-B2
D109 D111 D113 D114 C146
C145A
CID3
D135
D134
D104
D103
D133
D102 D132
D101
D100A D100
DR10
D100B CID5
D100C
D131 D129 D127
D130 D128
D119
CID4 CID1
1C1-27
1C 2-
170A
146 145 144
142 140 138 136 134 132 130
126127 131133135137139
1A141
103 112
113 115
114 116B
117 119
116A
118A
151 153 155
158159
150A150
164165166167168
101A
P-4 S1-C1
118B
1C4E
1C4W-27
1C 4N
-2
1C--
C112
C112A
C112C
C111A
185A
136 134 132 130 E128 E126
C1E7 E124
E138E140A
E135 E133
E129 E121
E119
E117
E139
E139A
E140
E122
E120
E118
E139B
107C E113
E111
E109 E108
E112
E114 E110
E105
E106 E107A
E107B
E107
A102H A102G
A102FA102I
A102J
A102E
C1E2
C1E3
E104
E103
E102
E100
A102A
C1E1
A102E
A101
C1-A2 A142
1C3-27
D118 D130
D110A
D110D108
D108A
B118
B
LD
G . 27
B
LD
G . 1
B
LD
G . 27
B
LD
G . 1
B
LD
G . 40
B
LD
G . 27
B
LD
G . 40
B
LD
G . 27
R .D
R .D
R .D
D N
R
AM
P
D O W N
RAMP DONW
DN
C O
VER
ED
C O N C R
ETE
P
ATIO
R O O F
R O O F
COVERED RAMP
DOWN
F .E .C .F
.E .C
F.E.C.
F.E.C.
F.E.C.
F .E .C
F .E .C
F.E.C.
F.E.C.
F .E .C
CONCRETE WALK
C O N C R
ETE
W
ALK
C O N C R
ETE
W
ALK
SAFE
H O O D
HOOD
A-
FP
1- 1C
A-
FP
1A
A-
FP
1- 1C
A-
FP
1A
M
ATC
H
LIN
E
M
ATC
H
LIN
E
R .D
DN
DN
DN
UP DN
D N
DN
UP
UP
U P
D N
D
NLIG
H T W
ELL
FIR
E S H U
TTER
H/WH/WH/WH/W
H W
A.P.
E.P.
AC
H W
G R
ATE
TRAY
COLD
WARM
D.F.
FD
D .F.
D .F.
D .F.
F.D
F.D
F.D
F.D
F.D
F.D
EXISTING VAULT
F.F. 1922'-0"
UP
E A
S T S
TA
IR
S .F
S D D
H B
H B
H B
H B
H B
H B
H B
H B
E.
P.
E.
P.
AE
D
E.P
E.P
E.P
E.P
E.P.
E.P. E.P.
E.P
E.P
E.P
E.P.
E.
P
E.P. E.P. E.P.
E.P
E.P
E.P
E.P.
E.P.
E.P.
A127E STORAGE, GENERAL
C1A5 OTHER SPACE
B119
B126
B128
B118
B121
TOILET, GENERAL
KITCHEN, NOURISHMENT
STORAGE, GENERAL
OFFICE, VIST COORD.
OFFICE, CHIEF
A127F
B107
B113
B115
B116A
B114
B108
B107A
B110
B109A
B109
B112
B103
B102
B101B
B105
B104
B106
B103A
B101A
B111
B101
GROUP ROOM
DISHWASHING
MECHANICAL ROOM
OFFICE, STAFF
STORAGE, GENERAL
OFFICE, STAFF
OFFICE, STAFF
STORAGE, GENERAL
OFFICE, CHAPLAIN
KITCHEN, CANTEEN
STORAGE, GENERAL
OFFICE
DINING ROOM
TOILET, MALE
ATM
H.A.C.
OFFICE, STAFF
TOILET, FEMALE
OFFICE, STAFF
OFFICE, STAFF
OFFICE, STAFF
S2C1
S1C3 OTHER SPACE
OTHER SPACE
FC1A1
S1C2
S1A1
S1B1
FC1C1
FC1B1
C1C3
C1C2
C1B1
C1C1
C1B2
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
A119A
A127B
A127C
A127D
A127A
A122A
A127
A126
A124
A125
A123
A122
A119
POLICE SERVICES
OFFICE
TOILET, MALE
OFFICE, SECRETARY
OFFICE
OFFICE, WORKROOM
CONF RM/ ICC-EOC RM
OFFICE, SECRETARY
STORAGE, GENERAL
MECHANICAL ROOM
OFFICE, STAFF
OFFICE, STAFF
A102D
RM#
A103
A105
A104
A102
ROOM NAME
STORAGE, GENERAL
OTHER SPACE
TELECOM
C1A2
C1A3
C1A4
C1A1 OTHER SPACE
OTHER SPACE
OTHER SPACE
OTHER SPACE
C107
C113
C112
C100
OFFICE, GENERAL
OFFICE, STAFF
TOILET, MALE
BREAKROOM
STORAGE, GENERAL
WAITING ROOM
A102A
A102B
A102C
A102 MEDICATION PREP.
NARCOTICS ROOM
STORAGE, GENERAL
STORAGE, GENERAL
A103A OFFICE, TRAVEL
A102 PHARMACY
A102E OFFICE, WORKROOM
A102F ANTI-ROOM
A102G UTILITY, CLEAN ROOM
A102H
A102I ANTI-ROOM
A102J STORAGE, GENERAL
A102K STORAGE, CLOSET
UTILITY, CLEAN ROOM
A102L STORAGE, GENERAL
OFFICE, STAFF
A121 OFFICE, STAFF
A127G HALL
B100 OFFICE, STAFF
B103B OFFICE, STAFF
OFFICE, STAFF
B110A CLOSET, GENERAL
B117 HALL
A142 OFFICE
A143 OFFICE
C112A OFFICE, STAFF
C112B OFFICE, STAFF
C112C OFFICE, STAFF
C111 TOILET, FEMALE
C111A NURSING MOTHER'S ROOM
C145A
C147
C146
LAB WORK
CLOSET, COMM
C145B TOILET, FEMALE
TOILET, MALE
C145C BLOOD DRAW
C145 WAITING, BLOOD LAB
D156 CASHIER
GROUP 1A
GROUP 1BGROUP 1C
GROUP 1D
GROUP 1E
GROUP 1F
GROUP 1G
GROUP 1H
GROUP 1J
GROUP 1K
GROUP 1L
GROUP 1M
GROUP 1N
GROUP 1P GROUP
1Q
GROUP 1U
GROUP 1VGROUP
1W
GROUP 1R
GROUP 1S
GROUP 1T
TRUE
NORTH
PLAN
NORTH
PHASING PLAN GENERAL NOTES
A. PRIOR TO COMMENCING WORK, THE…