Attachment 2 - 1131PL20RDS31227 Performance Work Statement (PWS).pdf

PDF 283 KB Posted

Attached to
REGIONAL SOUTH AND SOUTHEAST ASIA FOR INDO-PACIFIC AGRIBUSINESS DESK STUDY (DS) SERIES
Solicitation number
1131PL20RDS31227
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION D – ANY CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS

D.1. PERFORMANCE WORK STATEMENT (PWS)

DESK STUDY FOR INDO-PACIFIC AGRIBUSINESS PROJECTS

D.1.1. OVERVIEW

The U.S. Trade and Development Agency (USTDA) is a foreign assistance agency that delivers its program commitments through grants and contracts. The projects supported by USTDA activities represent strong and measurable development priorities in the host country and offer opportunities for the sale of U.S. goods and services. Requests for USTDA assistance are made by either public or private sector project sponsors for implementation in developing and middle income countries.

D.1.2. SCOPE OF WORK

USTDA requires services under this non-personal services Desk Study (DS) contract to support its decision-making relative to the funding of activities to support agribusiness projects in the Indo- Pacific. Agribusiness projects could cover areas such as cold chain and related logistics, food safety, agricultural biotechnology, aquaculture, meat and food processing, etc. The Indo-Pacific refers to countries in South and Southeast Asia as well as the Pacific Islands. USTDA-eligible Indo-Pacific countries that could potentially be the focus of this DS are: Indonesia, Laos, Malaysia, the Philippines, Thailand, Vietnam, India, Sri Lanka, the Maldives, Bangladesh, Nepal, Bhutan, Papua New Guinea, and Pacific Islands other than Palau. Please note that some of the Pacific Islands are not independent (e.g.Wallis and Futuna is a French territory), and are therefore not eligible to receive USTDA funding.

The Contractor shall, if requested by the COR, provide preliminary assessment reports (“Preliminary Assessments”) for up to two (2) activities; the Preliminary Assessment shall determine whether a project proposal merits a full Project Report. The Contractor shall review and assess at least two (2) and up to four (4) agribusiness sector proposals for feasibility studies, technical assistance, or pilot projects in the Indo-Pacific. For each project proposal assigned by the Contracting Officer’s Representative (COR) to the Contractor for review, the Contractor shall provide a Project Report. The Contractor shall provide Project Reports for up to four (4) activities for USTDA funding consideration and one Final Report in cumulation to USTDA.

USTDA reserves the right to make the final determination on which activities merit consideration for the Preliminary Assessments and/or Project Reports.

The Preliminary Assessments, Project Reports, and Final Report, unless otherwise directed by USTDA, shall be labeled clearly on every page as “Business Confidential” and shall be treated accordingly per sections D.1.9, “Confidentiality,” and D.1.10, “Intellectual Property.”

The purpose of the optional Preliminary Assessments is to:

1. Collect high-level project information, such as information on the project’s technical, commercial, and financial viability; grantee commitment; U.S. export potential; technical and/or regulatory hurdles; and basic USTDA eligibility criteria.

2. Assess and identify key issues and obstacles to the project proposal moving forward.

3. Identify information and data needed in order for USTDA to make a determination on this project proposal.

4. Analyze specific project issues or technical factors that may impact overall project viability.

5. Provide supporting analysis and an approximately three (3) – five (5) page recommendation on whether or not USTDA should put this project proposal under full review (e.g., development of Terms of Reference, budget, and Project Report).

The purpose of the Project Reports is to:

1. Assess and provide a recommendation on whether USTDA should provide funding for the proposed feasibility study(ies), technical assistance, pilot project(s), or other activity(ies), hereinafter referred to as “activity(ies)”;

2. Develop terms of reference and budgets for each activity for USTDA funding consideration.

o The Contractor may be asked to develop a full terms of reference and budget based on an outline or concept note.

o If Contractor is having difficulty meeting this requirement, the Contractor must discuss the findings of its review with the Contracting Officer’s Representative (COR) in advance of writing the draft Project Report.

o The Contractor shall obtain the COR’s written approval before developing any activity.

3. Provide supporting analysis for the recommendation on the activity in a project report (“Project Report”) that analyzes all the relevant issues, including risks to implementation of the project.

4. In addition, the Contractor shall assess the potential of the relevant market sector in the host country for U.S. suppliers of goods and services in the Project Report, as well as the foreign competition in the sector.

In addition, if deemed necessary by USTDA to evaluate the project proposal(s), the Contractor may be required to travel to the Indo-Pacific Region for up to two weeks (10 business days + travel days). The Contractor’s travel is subject to USTDA’s approval. All travel costs shall be on a reimbursable basis.

The purpose of the Final Report is to:

1. Provide a high-level overview and summary of the at least two and up to a maximum of four activities reviewed for USTDA’s funding consideration.

2. Assess and provide a recommendation on whether USTDA should provide funding for the proposed feasibility study(ies), technical assistance, pilot project(s), or other activity(ies), hereinafter referred to as “activity(ies)”;

o If Contractor is having difficulty meeting this requirement, the Contractor must discuss the findings of the mission with the Contracting Officer’s Representative (COR) in advance of writing the draft Final Report.

o The Contractor shall obtain the COR’s written approval before developing any activity.

3. Provide supporting analysis for the recommendation on the activity/activities in a final report (“Final Report”) that analyzes all the relevant issues.

4. In addition, the Contractor shall assess the potential of the relevant market sector in the host country for U.S. suppliers of goods and services in the Final Report.

5. The Contractor shall include the individual Project Reports as annexes in the Final Report.

The Contractor will not be paid for reports that are not approved or completed.

The actual number of deliverables/reports against this contract is dependent on the availability of suitable projects. Therefore, not all deliverables may be required or be possible and the figures provided for the Preliminary Assessments, Project Reports and Final Report are not-to-exceed ceiling figures and not actual figures. The Contractor shall only invoice for work/deliverables actually completed. Any unexpended funds will be de-obligated from the contract at close-out.

D.1.3. USTDA FUNDING CRITERIA

The Contractor’s recommendations shall be based upon USTDA funding criteria, which are that the Project(s) must:

a) Be likely to receive implementation financing;

b) Have a procurement process that provides “equal access” to U.S. companies;

c) Represent an opportunity for sales of U.S. goods and services that is many times greater than the initial investment of USTDA assistance;

d) Be a development priority of the Project Sponsor and host country where the Project is located and, in some cases, have the endorsement of the U.S. Embassy in that host country; and

e) Involve U.S. companies that are facing market entry problems and/or strong competition from foreign companies which often receive subsidies and other support from their governments.

To execute this requirement, the Contractor shall:

1. Meet or have a conference call with the Indo-Pacific Regional Team and the USTDA Program Monitoring and Evaluation team to discuss the desk study;

2. Identify and evaluate project opportunities and provide recommendations for USTDA funding. Develop Terms of Reference and budgets for at least two and up to four activities for USTDA consideration. All project opportunities proposed by the DS

Contractor must be approved by the COR prior to the drafting of a formal funding recommendation.

3. If applicable, the Contractor shall contact USDA/FAS to discuss the project proposal and get their input.

For each of the up to two (2) Preliminary Assessments, the Contractor shall develop a stand-alone three (3) – five (5) page Preliminary Assessment report. For each of the at least two (2) and up to four (4) activities to be recommended to USTDA, the Contractor shall develop a stand-alone Project Report. The requirements for the Project Reports are further detailed in section D.1.7 below.

D.1.4. CLIMATE RESILIENCE SCREENING

Per Executive Order (EO) 13677, USTDA is required to consider climate resilience in its international development work. The Agency has determined that in order to be compliant with the EO, climate resilience screenings must be conducted at the project scoping stage for all feasibility studies (FS) and technical assistance (TA) activities. Accordingly, the Contractor shall conduct a climate resilience screening utilizing the guidance provided in Attachment VII.

D.1.5. PROJECT PROFILE

The Indo-Pacific Region covers countries from Pakistan to Vietnam to the Pacific Islands, all with different agriculture sectors. This DS could cover a wide variety of topics such as those listed below. The first two topic areas are listed in bold, as USTDA expects to receive proposals in each of these topic areas.

- Cold chain and related logistics: Cold chain could include cold chain facilities, warehouses, refrigerated delivery trucks, delivery solutions and logistics.

o USTDA anticipates receiving a proposal to develop cold chain systems in Bangladesh.

- Agricultural biotechnology: The DS would review a project focused on developing communication and outreach strategies for promoting biotechnology crops and food to the public, companies and foreign government entities. The DS could also review projects related to agricultural biotechnology trade policy, including Sanitary and Phytosanitary Measures (SPS), and other aspects of agricultural biotechnology crop development.

o USTDA anticipates receiving a proposal for a regional South Asia agricultural biotechnology gaps and scoping analysis. The proposed study would examine how government, non-governmental and private sector entities provide science-based communication on the effects and benefits of agricultural biotechnology in India, Pakistan and Bangladesh, and how to enhance such science-based communication in these countries.

- Aquaculture

- Meat, dairy and food processing

- Food safety (including meat, poultry and dairy safety)

- Agricultural production equipment and shortline (tillage, planting, haying and harvesting equipment)

- Feed and grain storage and handling

- Seed material

- Irrigation technology and agricultural water management solutions

- ICT, Artificial Intelligence, automation, drones/unmanned aircraft systems applications for agribusiness (potentially falls under ICT portfolio)

- Power solutions for agribusiness (potentially falls under energy portfolio)

- Tropical agriculture, including agricultural technology that adapts temperate climate crops for tropical regions, power and ICT solutions, and policy related to tropical agriculture

- Agricultural credit, financing and insurance

D.1.6. METHODOLOGY:

D.1.6.1. NON-DISCLOSURE AGREEMENT AND KICKOFF

Upon award, the Contractor shall be required to sign a Non-Disclosure Agreement. To the extent that the work under this contract requires that the contractor be given access to confidential information or proprietary data from the Government or other companies, the Contractor agrees to treat such information and data as confidential and to use the information only for the contemplated purpose. After signing the Non-Disclosure Agreement, the Contractor shall contact USTDA’s COR to schedule a meeting or call to discuss details of the Contract assignment. The COR shall provide the Contractor with names and addresses of the potential project sponsor(s), other pertinent entities to contact in the United States and overseas, and any other relevant details or proposals that may impact the design and/or evaluation of the proposed activity(ies).

After reviewing these materials, contact the COR at (703) 875-4357 to discuss initial observations and raise any questions or concerns about the proposal and the Project. At this time, USTDA will provide the Contractor with additional guidance on the Agency’s requirements for the preparation of TOR and budget.

D.1.6.2. PRE-VISIT REPORT (IF APPLICABLE)

No less than one week prior to departure to the host country(ies), the Contractor shall provide the Contracting Officer (CO) and the COR a pre-visit written report containing:

a) The proposed schedule or itinerary;

b) Preliminary strategies or findings on viability of the project(s);

c) Financing options;

d) U.S. company interest in the project(s) and information about the sector in the host country(ies), in general;

e) Summaries of proposed activity(ies) for USTDA’s funding consideration to support the project(s) identified;

f) A list of contacts to be made during the visit;

g) A pre-visit checklist of issues, information, and questions to be utilized during the visit;

and

h) A Pre-visit report with a preliminary version of Attachment VIII (in Excel format), which will provide substantive comments on U.S. company interest in the project(s) and in the host country(ies) in general.

USTDA reserves the right to determine whether travel is needed to assess project proposals.

D.1.6.3. COMMUNICATION WITH U.S. EMBASSY/CONSULATE IN HOST

COUNTRY

Communications with U.S. and foreign embassy officials prior to the award of this contract and completion of the kickoff meeting with USTDA in relations to the requirements of this contract is strictly prohibited.

USTDA will advise the U.S. Embassy and/or Consulate(s) in the host country(ies), especially the U.S. Foreign Agricultural Service representatives, of the Contractor’s proposed travel itinerary no later than one week prior to departure and request that the Commercial and/or Economic Section(s) of the Embassy and/or Consulate(s) provide the Contractor with names and addresses of appropriate host country officials with whom to meet.

D.1.6.4. TRAVEL (OPTIONAL)

If the COR deems travel to be necessary, the Contractor shall travel to the host country(ies) to meet with relevant project officials and with the U.S. Embassy and/or Consulate(s) in execution of this DS. The Contractor shall contact the Commercial Section, Economic Section, and/or Foreign Agricultural Service upon arrival and prior to departure for briefing and debriefing meetings. It is the Contractor’s responsibility to arrange all meetings. The Commercial Section, Economic Section, and/or Foreign Agricultural Service staff may be able to assist the Contractor in arranging some initial meetings with host country officials. The Contractor is also responsible for arranging its own logistics for the visit (e.g., lodging, transportation, interpretation services, etc.). In some instances, the USTDA Contractor may find it useful to purchase the Gold Key or Business Facilitation Services offered at the U.S. Embassy or Consulate. In some cases, the Contractor may need to contract with a local entity to assist with trip logistics and/or for interpretation services. However, substantive technical work may not be subcontracted to local entities. The Contractor shall discuss proposed travel with the COR and shall obtain the COR’s agreement in writing as to when and where the Contractor travels.

The Contractor is required to acquire the following travel insurance coverage for personnel traveling overseas in support of this requirement:

• Defense Base Act (DBA) Insurance and Medical Evacuation Insurance (for Contractors when they perform work overseas).

D.1.6.5. CONTACTS

The Contractor shall submit a list of individuals contacted during the DS, and include at a minimum mailing addresses, phone and fax numbers, e-mail addresses, and a substantive summary of key comments that support the Contractor's recommendations. The list shall be submitted in Excel format and in accordance with the specifications outlined in Attachment VIII, “U.S. Company Contacts” and Attachment I, “Project Report Outline.”

D.1.7. DELIVERABLES

The Contractor shall provide verbal updates to the COR on a regular basis. The deliverables may also take the form of information, advice, opinions, alternatives, analyses, evaluations, recommendations, Preliminary Assessments, Project Reports, Final Reports, or other oral or written work products needed for successful performance. The Contractor shall respond in a timely manner to reasonable requests for updates and information from the COR.

The Contractor shall provide the following reports to USTDA:

(a) If requested by the COR, one Preliminary Assessment for each project proposal selected by USTDA for review (up to two total). The Contractor shall submit each Preliminary Assessment to the COR on a rolling basis. Each Preliminary Assessment will be treated as business confidential and must conform to the guidelines established in this PWS.

(b) One Project Report for each project selected by USTDA for a Project Report. The Contractor shall submit each Project Report to the COR on a rolling basis. Each Project Report will be treated as business confidential and must conform to the guidelines established in this PWS. Each Project Report must include the Required Budget in individual Microsoft Excel file.

Project Report (s) shall be submitted to the COR and appropriate Country Manager, if applicable, not to finalreports@ustda.gov.

(c) Final Report. The Final Report shall consist of all the Preliminary Assessments, Project Reports, inclusive of the Required Budget in individual Microsoft Excel files, that have been approved by USTDA and must conform to the outline found in Attachment I and provide the requested information and analysis, unless otherwise agreed to in writing by USTDA. Further Final Report requirements are detailed in section D.1.7.3, Final Report.

Unless otherwise agreed to by USTDA, the Contractor shall submit all reports under this Contract to the COR at least two months prior to the end of the contract period of performance.

If it is anticipated that Project Report(s) cannot be provided within this timeframe, the Contractor shall immediately contact the COR to discuss the reasons for the delay.

D.1.7.1 PRELIMINARY ASSESSMENT

If requested by the COR, the Contractor shall develop up to two (2) three (3) to five (5) page Preliminary Assessments that address the following PWS components, sections, and questions:

a) High-level executive summary of the proposed project, including the project’s technical, commercial and financial viability, grantee commitment, and U.S. export potential

b) PWS Section D.1.3. USTDA Funding Criteria

c) What are the obstacles (e.g. technical, regulatory, and/or financial) to this project’s implementation?

d) Analysis of any specific project issues or technical factors that may impact overall project viability

e) What additional information does USTDA need to assess this project’s viability?

f) What additional information does USTDA need to assess this project’s suitability vis-a-vis USTDA’s funding criteria?

g) Recommendation: Provide supporting analysis and recommendation on whether or not the project proposal meets USTDA funding criteria and merits full review (i.e., development of Terms of Reference, budget, and Project Report).

After receiving the COR’s request for a Preliminary Assessment, the Contractor shall discuss the project proposal with the COR during a meeting or conference call. Within two (2) weeks of this meeting or conference call, the Contractor shall submit the Preliminary Assessment in electronic format to the COR; if it is anticipated that the Contractor cannot submit the Preliminary Assessment within this timeframe, the Contractor shall immediately contact the COR to discuss the reasons for the delay.

Upon direction from the COR, the Contractor shall submit an electronic copy of each Preliminary Assessment to USTDA. No hardcopy submissions will be accepted. All Preliminary Assessments must be paginated, clearly labeled, and submitted electronically in Adobe PDF format to the USTDA COR or applicable Country Manager, not to finalreports@ustda.gov. Any copies of project proposal materials must be returned to USTDA with the submission of the Preliminary Assessment.

Upon government acceptance of the Preliminary Assessment, the Contractor shall submit an invoice to USTDA.

D.1.7.2 PROJECT REPORT

For each Project Report, the Contractor shall develop and prepare a report that complies with and satisfies all elements in the following PWS components:

a) PWS Section D.1.3. USTDA Funding Criteria

b) PWS Section D.1.4. Climate Resilience Screening

c) PWS Attachment I. Project Report Outline, including Attachment IV (Required Budget Format) and Attachment V (Task Completion mailto:finalreports@ustda.gov

Schedule) and Attachment VI (Budget Narrative Requirements)

d) PWS Attachment II. Impact on U.S. Labor

e) PWS Attachment III. USTDA Nationality Requirements

f) PWS Attachment VII. Guidance on Climate Resilience Screening

g) PWS Attachment VIII. U.S. Companies Contacted During the Course of the

Desk Study

Additionally, the Contractor shall collect, review, and analyze all necessary information acquired from the following sources:

a) Proposal and supporting documentation provided by Project Sponsor(s) and related project parties; and

b) Meetings (including conference calls) with prospective Grantees, interested U.S.

companies in the relevant sectors, as well as project finance sources.

Following the completion of all Project Reports, the Contractor shall submit to USTDA a Final Report, which compiles all of the Project Reports that have been approved by USTDA. The Final Report submission shall also include the Required Budget Format for each Project Report in individual Microsoft Excel documents.

Upon direction from the COR, the Contractor shall submit an electronic copy of each Project Report to USTDA. No hardcopy submissions will be accepted. All reports must be paginated, clearly labeled, and submitted electronically in Adobe PDF format to the USTDA COR or applicable Country Manager, not to finalreports@ustda.gov. Any copies of Project proposal materials must be returned to USTDA with the submission of each Project Report.

Upon government acceptance of the Project Report, the Contractor shall submit an invoice to USTDA.

D.1.7.3 FINAL REPORT

The Contractor shall submit a Final Report that includes a complete description detailing the following:

(a) All projects reviewed during the course of contract performance;

(b) All Project Reports, including the TOR and budgets the Contractor has developed in coordination with the Project Sponsor and U.S. firm for each project;

(c) A brief explanation for any activity(ies) or project(s) that were reviewed and were not recommended for USTDA funding.

If it is anticipated that the Final Report cannot be provided at least two (2) months prior to the end of the contract period of performance, the Contractor shall immediately contact the COR to discuss the reasons for the delay. The COR may also request the Contractor to provide portions of the Final Report before the submission of the entire Final Report.

mailto:finalreports@ustda.gov

Upon direction from the COR, the Contractor shall submit an electronic copy of the Final Report to USTDA. No hardcopy submissions will be accepted. All reports must be paginated, clearly labeled, and submitted electronically in Adobe PDF format to USTDA via the following email:

finalreports@ustda.gov.

The email subject line must include the title of the desk study and the project number so that it is easily identifiable. Any copies of Project proposal materials must be returned to USTDA with the submission of the Final Report.

Upon government acceptance of the Final Report, the Contractor shall submit an invoice, to

USTDA.

D.1.8. QUALITY CONTROL AND PERFORMANCE ASSESSMENT:

D.1.8.1. Quality

The deliverables shall be grammatically and factually correct in all respects, internally consistent, and all statements and tables shall be clear and easily understood by a competent reader, and contain no typographical errors. The Contractor is responsible for quality control actions necessary to achieve quality in the delivery of the required services, which may include the services of a professional editor. The COR will reject a deliverables that does not conform in all respects to the Contract requirements, including but not limited to, the written quality of the Preliminary Assessments, Project Reports or Final Report. The Contractor shall correct all deficiencies at no additional cost to the Government.

D.1.8.2. Performance Assessment

During the course of contract period, the COR will track Contractor’s performance. At the end of the performance period, the COR will assess the Contractor’s performance in accordance with FAR 42.15 and report to the Contracting Officer for submission to the Contractor Performance Assessment Reporting System (CPARS).

The COR will consider all pertinent information during the preparation of the Contractor’s performance assessment. The Contractor will be afforded the opportunity to identify factual errors. The COR’s assessment is not subject to negotiation and the COR will not engage in discussions with the Contractor. Any errors identified by the Contractor will be addressed by the Reviewing Official. A copy of the final performance assessment will be available in the Past Performance Information Retrieval System (PPIRS).

D.1.9. CONFIDENTIALITY:

The proposal of the U.S. firm is a proprietary document and should not be distributed without permission from USTDA and the U.S. firm. The Contractor shall treat any proposal and supporting information submitted by the U.S. firm as business confidential in its entirety, unless otherwise stated in writing by the U.S. firm.

D.1.10. INTELLECTUAL PROPERTY:

This Contract is funded by the United States Government. All intellectual property generated and/or delivered pursuant to this Statement of Work shall be subject to appropriate federal acquisition regulations which entitle the Government to unlimited rights to technical data developed exclusively with Government funds. The Government may: (1) use; (2) disclose; (3) reproduce; (4) prepare derivative works; (5) distribute copies to the public; (6) perform publicly;

and (7) display publicly, the “data” in any manner and for any purpose, and have or permit others to do so (i.e., the Government may sublicense these rights to another contractor). See FAR 52.227-14(a).

D.1.11. IMPARTIALITY:

It is essential that the DS be conducted with complete impartiality and objectivity and that the Contractor and its Subcontractors not obtain an unfair competitive advantage in USTDA-funded activities resulting from this Contract. In accordance with the principles of FAR Subpart 9.5 and USTDA policy, the Contractor and its Subcontractors, if any, for this Contract shall be ineligible to compete for, as a prime or subcontractor or otherwise, USTDA-funded activities that result from this Contract, unless USTDA through its Office of Acquisition Management, shall have granted a waiver, based upon FAR 9.503, that preclusion of the Contractor or its Subcontractors from the follow-on activity would not be in the Government’s interest. This restriction shall remain in effect for three (3) years from the termination of this Contract or until the awarding of a USTDA-funded feasibility study resulting from this contract. The Contractor is responsible for including this restriction in all subcontracts under the Contract.

D.1.12. COORDINATION WITH OTHER CONTRACTORS:

The government may award other contracts for additional work not prescribed in this contract. The Contractor shall fully cooperate with such other contractors in performance of the requirement herein, and as directed by the Contracting Officer. The Contractor shall not commit or permit any act, which will interfere with the performance of work by any other USTDA Contractor.

D.1.13. PERIOD OF PERFORMANCE:

The Period of Performance for this Contract shall be two years from the date of the Contracting Officer's signature on the Contract.

D.1.14. PLACE OF PERFORMANCE:

The places of performance shall be at the Contractor’s facility and, if travel is authorized by USTDA, the Indo-Pacific.

D.2. ATTACHMENTS

ATTCH/ TITLE

EXHIBIT

I Project Report Outline II Impact on U.S. Labor Statement III USTDA Nationality Requirements IV Required Budget Format V Task Completion Schedule VI Budget Narrative Requirements VII Guidance on Climate Resilience Screening VIII U.S. Companies Contacts

Attachment I – 1

Attachment I

Project Report Outline: Business Confidential Analysis and Recommendation

A. Executive Summary.

The Desk Study contractor (“Contractor”) shall provide an executive summary of the Contractor’s findings and recommendations.

B. Project Description.

The Contractor shall hold meaningful discussions with appropriate contacts to determine how USTDA’s funding can be used most effectively to support the implementation of the project(s) identified in the host country.

The Contractor shall provide a brief description and history of the project (the “Project”). The Contractor shall describe the proposed technology from the U.S. firm to be used in the Project.

The Contractor shall gauge the interest of potential project financiers and potential U.S. suppliers and assess whether the proposed USTDA activity(ies) will help accomplish the project(s) goals.

The Contractor shall provide relevant information to potential project sponsors regarding USTDA’s evaluation criteria, timeline, and due diligence requirements. The Contractor shall describe whether the proposed U.S. solution is technically viable and/or commercially available.

If the Contractor finds the proposed U.S. solution is not technically viable and/or commercially viable, the Contractor shall discuss these issues with USTDA program staff before providing a recommendation.

The Contractor shall describe relevant issues to the Project [e.g. host country and/or other stakeholders, sector, Project location, source of raw materials, infrastructure requirements, proposed technological approach, legal and regulatory framework (licenses, permits, etc.), implementation schedule, economic fundamentals (estimated capital cost, operating costs, interest expense, taxes, expected revenues, etc.), the specific objectives of the proposed activity, how the proposed USTDA activity supports the Project implementation process, and any other variables or issues the Contractor deems critical as part of a thorough activity/Project evaluation.]

C. Project Sponsor’s Capabilities and Commitment.

This section describes the Project sponsor’s commitment and capabilities to undertake the activity and the subsequent Project. The purpose is to understand the experience of the Project sponsor and any previous work undertaken by the Project sponsor in the sector. This section should also include a discussion of any potential risks of working with the Project sponsor that could delay Project implementation. This can take many forms but should at a minimum address the applicable points below:

• A thorough description of the host country Project sponsor, including its structure, capabilities, operations, and decision-making ability pursuant to the Project, and

Attachment I – 2

• An assessment of the Project sponsor’s commitment and ability to implement the Project (e.g. the Project sponsor’s previous experience, current commitments, responsiveness, business activities, and government mandate).

D. Implementation Financing.

This section describes the Project sponsor’s plans to secure financing to implement the Project.

This can take many forms but should at a minimum address the points below:

• An assessment of the overall cost estimate of the Project;

• For Projects involving potential equity investment, the Project’s proposed debt-equity structure to ensure that it corresponds to the requirements of the prospective lenders (this aspect is critical to USTDA’s decision making); and

• A review of the financing options for Project implementation.

The Contractor is required to contact officials from the potential financing institutions, including, where appropriate, multilateral lending institutions, Export Import (Ex-Im) Bank, Development Finance Corporation (DFC), and private/commercial sources, to ensure that the Project sponsor(s) has adequately explored all financing options. The Contractor shall provide names and phone numbers of contacts at the potential financing institutions and summarize their comments. The Contractor must determine the most likely source(s) of implementation financing for the Project. The Contractor must ensure that the Terms of Reference (TOR) for the activity fulfill the requirements of the most likely financing source(s).

E. U.S. Export Potential.

This section describes the U.S. export potential that may result if the Project is implemented.

The purpose is to estimate the U.S. export potential in order to justify USTDA funding for the activity. This can take many forms but should at a minimum address the points below:

The Contractor shall provide a best estimate of potential procurement of U.S. goods and services for Project implementation. This estimate should be supported by a breakdown by category and dollar value of goods and services likely to be imported for the Project and an illustrative list of potential U.S. suppliers of the goods and services for those goods and services listed as likely U.S. exports. The Contractor shall include U.S. content in their evaluation of U.S. exports, including an analysis of U.S. manufacturing and services sourced from the United States that would most likely be used for the Project. The Contractor shall cross-check the U.S. firm’s estimates of U.S. export potential with independent relevant sources, such as:

- USTDA program staff and USTDA’s evaluations data;

- The U.S. Department of Commerce’s International Trade Administration;

- Industry and trade associations; and

- Outreach with other U.S. suppliers in the sector.

Attachment I – 3

The Contractor shall describe how procurements are typically conducted: 1) in the sector; 2) by the Project sponsor; and 3) in the host country. The Contractor shall confirm whether there are local content requirements or procurement restrictions in this sector or for the Project and whether a local provider/distributor will be or is likely to be involved in Project implementation.

The Contractor shall also list any import licensing requirements or permits needed by U.S.

companies to participate and supply goods for the Project. The Contractor shall also identify any U.S. companies already working with the Project sponsor or working in the respective sector in the host country.

The Contractor shall provide a report that summarizes its discussions with U.S. companies that provide goods or services for the Project, and their level of interest in the Project should also be included. The Contractor shall take note on not only the U.S. company’s general interest in the relevant sector or country, but also interest in the specific Project. The Contractor shall analyze how competitive the U.S. company’s goods or services would be if the Project reaches the implementation stage. To ensure no one is given unfair advantage to compete for USTDA’s funding or the Project implementation, the Contractor should be sensitive to disclosing information about the proposed USTDA activity.

The Contractor shall submit a complete list of U.S. companies and other entities contacted, with the name and contact information of individuals interviewed and their responses.

F. Foreign Competition and Market Entry Issues.

This section describes foreign competition and market entry issues in the host country. The purpose is to demonstrate why USTDA funding may be needed in order to level the playing field for U.S. companies. This can take many forms but should at a minimum address the points below.

The Contractor shall provide a discussion of the foreign competition for goods and services likely to be procured for Project implementation by category. The Contractor shall include a discussion of U.S. industry competitiveness in each category, taking into account geographic factors, host country industry capabilities, technology and licensee issues, past procurement tendencies of the Project sponsor, and how the procurement is likely to be conducted. Where relevant, the Contractor shall discuss the extent to which market entry issues impede exports and trade and how the activity will help overcome these obstacles.

G. Evaluation Strategy.

This section describes the strategy by which the Project, if implemented, should be evaluated.

The purpose is to concisely describe the baseline goals and objectives of the Project, along with any potential risks or timeline hindrances, so the actual implementation results can be evaluated accordingly. This can take many forms but should at a minimum address the points below:

• Goals and objectives:

o Clearly define the goals of the Project and identify what will constitute success

Attachment I – 4

Ex: For trade capacity building or legal project, any change in law as result of Project o Identify key sources for information needed to determine if USTDA’s activity attained its objective o Identify potential methods of measurement for evaluation specific to the Project

• Process and Timeline:

o What is the step-by-step process the Project will follow to be implemented, following USTDA’s funding?

o What is the anticipated Project development timeline? This may change, but it is important to know what the original goal is as it will influence USTDA’s evaluation effort.

o How are procurements typically conducted in the sector for this host country?

o Will there be local content requirements?

o Will a local provider/distributor be involved?

o Will there be one big procurement or several smaller ones? Will other entities be involved if the procurements are small?

1. Project implementation risks: Articulate the most prominent risks and the potential risk mitigants that may enable activity and/or project implementation success, for example through the specific design of TORs. Potential implementation risks may include the

a. Support for the Project

(1) How has the host country government expressed support for the project?

(2) Is there a stated host country government strategy, policy, or regulation that supports implementation of the project?

(3) What is the breadth and depth of grantee support/engagement on the activity and project?

(4) If only one grantee contact is critical and knowledgeable or engaged on the activity/project, what steps would USTDA or the contractor need to take to respond and mitigate the impact/change of personnel/champion for the activity/project?

b. Financial strength and management acumen

(1) Once the TORs are complete, what will be the remaining impediments to financing the project?

(2) What assurances have you received that the parties have the wherewithal to implement the project?

c. Regulatory, legal and economic risks

(1) Which permits, licenses, or government agreements that are required at this stage of the project’s development remain outstanding?

(2) What are the expected timelines for these approvals?

(3) Are any challenges anticipated to obtaining all required approvals for the project?

Attachment I – 5

(4) Will any federal/state/local political cycles or other political considerations, such as sanctions, impact implementation of the project?

(5) Are there contract sanctity challenges in the Host Country, and will these challenges have any bearing on implementation?

(a) For example, is there a high likelihood that a power purchase agreement may not be honored if lower energy prices become readily available?

d. What is the risk profile of the proposed USTDA-funded activity?

(1) Does the U.S. contractor have a track record working in the Host Country and industry? With the proposed technology? Bringing early-stage deals with this technology and/or in the host country to financial close? What assurances have you received that the parties have the wherewithal to implement the activity?

e. What are the potential risk mitigants that may enable project or activity implementation success?

(1) Are there USTDA-activity specific mitigants (e.g., terms of reference, periodic check-ins and review, etc.) that can help mitigate the above risks?

(2) Are there any performance or completion guarantees or other mechanisms that will be incorporated into the activity to mitigate completion risks?

(3) If the risks cannot be mitigated, what factors do you think make the activity/project likely to be successfully implemented?

• Key Leads:

o Are there US companies that already have business with the Project sponsor or in the sector? If so, what is USTDA’s added value for these companies’ ability to pursue additional business?

o Are there any companies short-listed for procurements? If so, are they short listed via direct sales, distributor, etc.?

H. Developmental Impact.

The COR shall identify at least one viable and quantifiable Development Impact Measure that will result from the Project being implemented based on the recommendations of the USTDA activity. The Contractor shall provide the following information for each indicator identified by the COR for each activity: 1) current status, prior to USTDA’s activity and Project implementation (Baseline); 2) anticipated outcomes should the Project be implemented, based on the recommendations of the USTDA activity; 3) the anticipated timeline for the realization of these outcomes; and, 4) how such information can be measured and what sources could be utilized to determine whether the outcome was realized.

I. Impact on the Environment.

The Contractor shall provide a statement regarding the likely consequences the proposed Project may have on the environment. The Contractor shall ensure that the TOR for the activity

Attachment I – 6 includes, at a minimum, a preliminary review of the Project’s impact on the environment, with reference to local requirements and requirements of potential financing source(s) of the Project.

The Contractor should identify potential negative impacts and discuss the extent to which they can be minimized or mitigated.

The Contractor shall conduct a climate resilience screening utilizing the guidance provided in Attachment VII and, based on climate resilience screening results, provide details, including rationale, on whether (a) an in-depth analysis is recommended; (b) an in-depth analysis is not recommended; or (c) whether or not the climate resilience screening has indicated that a proposed Project should not move forward. If in-depth analysis is recommended, the Contractor shall propose language for the TOR (see section O, #4).

J. Impact on U.S. Labor.

The Contractor shall provide an assessment of the impact of the Project on U.S. labor. The Contractor shall address the legislative prohibitions on the use of Foreign Assistance funds described in Attachment II and any implication such prohibitions may have on the activity and/or Project.

K. Qualifications.

The Contractor shall provide a review of the capabilities of the U.S. firm submitting the proposal and the qualifications of the proposed U.S. firm’s personnel.

L. Justification.

The Contractor shall provide an explanation of why USTDA’s grant funding is needed, including a description of how the Project would support U.S. government policy priorities and promote trade, how USTDA's participation would add value to the Project's development, and how the success of the Project would be measured in terms of trade capacity and development impact.

M. Recommendations.

The Contractor shall provide analysis and recommendations as to whether or not the Project meets USTDA’s basic funding criteria as defined in Section 3 in the Desk Study Performance Work Statement.

If the recommendation is that USTDA should fund the activity, but in a phased approach or only if certain outstanding issues are resolved or conditions met, those phases, issues or conditions should be clearly delineated and discussed in the recommendation.

N. Contacts.

The Contractor shall provide a list of individuals contacted during the Desk Study and fill out Attachment VIII. The list shall include the address, phone and fax numbers, and e-mail address of each individual.

Attachment I – 7

O. Terms of Reference.

For Contractor shall be responsible for submitting to USTDA a Terms of Reference (“TOR”) and budget for the activity that conforms to USTDA’s requirements. This work shall entail working with the U.S. firm and the proposed Project sponsor to develop the TOR and budget for the activity using the U.S. firm’s and Project sponsor’s draft proposal as a basis. The TOR, which must be approved by the Project sponsor and the U.S. firm, should include, at a minimum, the

1. Purpose and objective of the activity. This section will contain a concise statement describing the activity.

2. A technical assessment. This section will include relevant background information and analysis that is pertinent to the technical feasibility of the Project (e.g. site selection, gap analysis, data collection, comparative analysis, parameters for pilot project implementation, baseline indicators and key performance indicators, a review of any previous reports or studies related to the Project, and an assessment of technologies to be used in pilot project implementation).

3. An economic analysis of the Project. This section will include a detailed analysis on all of the costs associated with the implementation of the Project, and relevant additional economic analyses relevant to the viability of the Project. This section shall provide all relevant information pertaining to the economic analysis of the Project (e.g. a cash flow analysis, analysis of market conditions, raw material availability, supply agreements, off-take agreements, competing alternative methods of achieving the same or similar Project objectives). This analysis should also include the internal rate of return under a variety of different assumptions (e.g.

different interest rates, depreciation, licensing fees, and import duties).

In addition, in order to provide the Project sponsor with sufficient information to responsibly implement, manage, and maintain the Project for the duration of the investment, this section will provide a Life Cycle Cost Analysis (LCCA) as part of the overall Project cost estimate. The LCCA shall examine the total initial capital costs to plan, design, develop, and build the Project, and also shall include a detailed analysis of the costs associated with the medium-term and long-term operation of the Project, which includes maintaining the facilities, equipment, and other assets financed as part of the Project. Such costs include, but are not limited to, warranties, operation, maintenance, acquisition, installation, refurbishment, and disposal costs that could be encountered throughout the life of the Project.

4. A financing plan for the Project. This section shall provide an analysis on the different types of financing (e.g. equity, debt) available for Project implementation.

This section will assess whether or not potential public and private financing organizations (e.g. the World Bank, relevant regional multilateral development banks, Ex-Im and OPIC) are interested in providing financing for Project implementation. This section shall include a financing plan and a financing strategy, including several approaches to securing financing for the Project based on

Attachment I – 8 discussions with the Project sponsor, potential lenders and potential financiers. This section shall outline the rationale for the financing plan and financing strategy and shall take into account a number of relevant factors (e.g. timing, interest rates, and potential financing terms). This section shall also provide a recommendation for the most effective financing sources for the Project.

This section shall include a sensitivity analysis of the return on investment (ROI). The sensitivity analysis shall account for the cost recovery indicators based on different assumptions for key Project variables, such as electricity tariffs, sales volumes, capital and operating cost estimates, and interest rates and investment requirements.

If sources of financing are not yet confirmed, this section shall identify the potential sources of financing. The U.S. firm, with the Project sponsor’s express permission, shall contact the potential sources of financing to assess the likelihood of receiving financing from such sources. This section shall outline the sources including, but not be limited to, bilateral financing institutions, multilateral financing institutions, international financing institutions and local and regional commercial banks.

This section shall also identify any and all Project risk factors and including a risk avoidance/reduction plan for each factor by means of insurance and bonding or other means. The plan shall meet the requirements of the potential financing sources, including host country sources, multilateral financiers, international financing institutions and others.

5. An appropriate preliminary environmental analysis of the Project. This section shall include a preliminary review of the Project’s anticipated impact on the environment with reference to host country requirements and those of potential financiers (e.g. the World Bank). This review would identify potential negative impacts, discuss the extent to which they can be mitigated. The U.S. firm shall develop plans for a full environmental impact assessment if and when the Project moves forward to the implementation stage.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .