Daegu

QuestionsPWS RefQuestions from ContractorGovernment Response
1GeneralELINThere are no cells to enter 'unit price' and 'amountSee Revised ELIN
2GeneralELINBase year period is'1 Mar 2020- 28 Peb 2021' on ELIN file, but, this period differs from the period specified in
pwsSee Revised ELIN
3GeneralELINTask line item (CLIN X013)' is specified on each option year sheet in the ELIN file, I think 'Task line item (x014) is correctSee Revised ELIN
4GeneralNot ProvidedIs it possible for anyone to have a construction safety engineer license instead of an industrial safety engineer license? I know that construction safety engineer license is needed in construction field and industrial safety engineer is necessary in manufacturing. Can construction safety engineer license not?The QCI has always been required to have an Industrial Safety Engineer License.
5GeneralNot ProvidedThe grass doesn't grow during the non growing season, so what do we usually do on the field?

(There's a separate clin for cleaning up the debris) or do we have to do something to remove the clover(kind of grass)?

Offerors shall perform work in accordance with PWS during non-growing season.

CLIN 0001, Maintain Improved Area-Growing season is 8 months, also the other items such as maintain MSA ground, Semi-improved ground, Airfield ground etc. are same 8 months. But actual growing season is only 5 months instead of 8 months Because 3 months’ contract already opened separately. So I think the growing season should be amended with 5 months instead of 8 months. The Base Year Period of Performance is amended to 1 May 2020 to 30 April 2021

1 May 2020-31 May 2020 is Phase-In associated with CLIN 0017

The growing season is amended to reflect 7 Months 1 June 2020 - Oct 2020 (5 months) March 2021-30 Apr 2021 (2 months).

Suggest verbiage: The Base Year Period of Performance is amended to 1 May 2020 to 30 April 2021.

1 May 2020-31 May 2020 is Phase-In associated with CLIN 0017

The growing season is amended to reflect 7 Months 1 June 2020 - Oct 2020 (5 months) March 2021-30 Apr 2021 (2 months).