Attachment_13_Cost_Sheet_23NC1123.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- RFP 23NC1123
- Solicitation number
- 0000034797
- Issued by
- California
About this file
The file is a Cost Sheet (Attachment 13) for RFP 23NC1123, detailing a research project with six distinct deliverables. The project involves a comprehensive research effort that includes a kickoff meeting, draft research plan preparation, stakeholder workshops and webinars, monthly progress meetings, draft and final report production, and additional meetings and briefings. The contract appears structured with six specific deliverables, each with a designated unit of measure, including 1 kickoff meeting, 1 draft research plan, 3 webinars, 72 monthly progress meetings, 1 set of reports (draft and final), and 5 additional meetings.
The cost sheet does not include specific dollar amounts for the deliverables, showing placeholder values of $0 for each line item. This suggests the pricing details may be submitted separately or are pending negotiation. The document provides a framework for the project's scope and expected contractor activities, outlining the key milestones and engagement points throughout the research project's lifecycle. The structure implies a detailed, collaborative research effort with multiple touchpoints for stakeholder engagement and progress reporting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23NC1123_RFP_Primary_Solicitation_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Attachment 13 - RFP 23NC1123 Cost Sheet
Proposer Name:
Key Staff Members Name and Title Hourly Rate
Deliverable 1: Kickoff Meeting Unit of Measure Cost Per Unit Amount Required Initial Term Total Cost
The selected Contractor shall conduct a project initiation meeting. responding to future data requests. Per meeting 1 $ - 0
Deliverable 2: Draft Research Plan Unit of Measure Cost Per Unit Amount Required Initial Term Total Cost
The Contractor shall prepare a Draft Research Plan and Schedule Per plan 1 $ - 0
Deliverable 3: Stakeholder Workshops and Webinars Unit of Measure Cost Per Unit Amount Required Initial Term Total Cost
The Contractor shall present the draft plan and report in public webinars. Per Webinar 3 $ - 0
Deliverable 4: Monthly Progress Meeting Unit of Measure Cost Per Unit Amount Required Initial Term Total Cost
The Contractor shall attend monthly check-in meetings. Per meeting 72 $ - 0
Deliverable 5: Draft & Final Report Unit of Measure Cost Per Unit Amount Required Initial Term Total Cost
The selected Contractor shall prepare a draft and a final version of the full study Per report 1 $ - 0
Deliverable 6: Other meetings and briefings Unit of Measure Cost Per Unit Amount Required Initial Term Total Cost
The Contractor shall attend other meetings and briefings as needed Per meeting 5 $ - 0