DD Form 2794, Pg 8 (TECH RQTS)
| COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS | |||||||||
| TECHNICAL PARAMETER REQUIREMENTS | |||||||||
| 26. WBS | |||||||||
| ELEMENT CODE | 27. WBS ELEMENT NAME | 28. ITEM TYPE | 29. TECHNICAL PARAMETER | ||||||
| a. PARAMETER NAME | b. UNIT OF MEASURE | c. UNIT OF MEASURE QUALIFIER | d. REPEATABLE | e. REMARKS | |||||
| 1.2.9 | Payload | Heritage | New Design | Percent | |||||
| 1.2.9 | Payload | Heritage | Predecessor System | Descriptor | |||||
| 1.2.9 | Payload | Warhead | Insensitive Munitions Requirements | List | |||||
| 1.2.9 | Payload | Warhead | Weight - Explosive | Pounds | |||||
| 1.2.9 | Payload | Warhead | Warhead Penetration | Inches | |||||
| 1.2.9.1 | Payload Common to All Variants | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | |||
| 1.2.9.1 | Payload Common to All Variants | PhysicalStruc | Volume | Cubic Inches | |||||
| 1.2.9.1 | Payload Common to All Variants | PhysicalStruc | Weight | Pounds | |||||
| 1.2.9.1 | Payload Common to All Variants | Warhead | Insensitive Munitions Requirements | List | |||||
| 1.2.9.1 | Payload Common to All Variants | Warhead | Weight - Explosive | Pounds | |||||
| 1.2.9.1 | Payload Common to All Variants | Warhead | Warhead Penetration | Inches | |||||
| 1.3 | Encasement Device | Heritage | New Design | Percent | |||||
| 1.3 | Encasement Device | Heritage | Predecessor System | Descriptor | |||||
| 1.3 | Encasement Device | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | |||
| 1.3 | Encasement Device | PhysicalStruc | Volume | Cubic Inches | |||||
| 1.3 | Encasement Device | PhysicalStruc | Weight | Pounds | |||||
| 1.3 | Encasement Device | Cannister | Thickness - Canister | Inches | |||||
| 1.3.1 | Top Attack DLM | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | |||
| 1.3.1 | Top Attack DLM | PhysicalStruc | Volume | Cubic Inches | |||||
| 1.3.1 | Top Attack DLM | PhysicalStruc | Weight | Pounds | |||||
| 1.4 | Command and/or Launch | Heritage | New Design | Percent | |||||
| 1.4 | Command and/or Launch | Heritage | Predecessor System | Descriptor | |||||
| 1.4.1 | Command and/or Launch Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | ||||
| 1.4.1 | Command and/or Launch Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | ||||
| 1.4.1 | Command and/or Launch Integration, Assembly, Test, and Checkout | IAT&CO | Number of Interface Control Drawings (ICD) | Quantity | Drawings | ||||
| 1.4.11 | Authoritative Safety Device (ASD) | Heritage | New Design | Percent | |||||
| 1.4.11 | Authoritative Safety Device (ASD) | Heritage | Predecessor System | Descriptor | |||||
| 1.4.11 | Authoritative Safety Device (ASD) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | |||
| 1.4.11 | Authoritative Safety Device (ASD) | PhysicalElec | Volume | Cubic Inches | |||||
| 1.4.11 | Authoritative Safety Device (ASD) | PhysicalElec | Weight | Pounds | |||||
| 1.4.11 | Authoritative Safety Device (ASD) | PhysicalElec | Weight - Structural | Pounds | |||||
| 1.4.11 | Authoritative Safety Device (ASD) | PhysicalElec | Weight - Electronics | Pounds | |||||
| 1.4.11 | Authoritative Safety Device (ASD) | PhysicalElec | Power - Maximum Consumption Rate | Kilowatts | |||||
| 1.6 | Platform Integration, Assembly, Test, and Checkout 1...n (Specify) | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | ||||
| 1.6 | Platform Integration, Assembly, Test, and Checkout 1...n (Specify) | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | ||||
| 1.6 | Platform Integration, Assembly, Test, and Checkout 1...n (Specify) | IAT&CO | Number of Interface Control Drawings (ICD) | Quantity | Drawings | ||||
| 1.7 | Systems Engineering | SysEng | Number of Requirement Document - "Shalls" | Quantity | Shalls | YG | |||
| 1.7 | Systems Engineering | SysEng | Number of Platforms - Integrated | Quantity | Platforms | ||||
| 1.8 | Program Management | ProgMgmt | Frequency of Government Program Reviews | Quantity | Reviews per Year | ||||
| 1.8 | Program Management | ProgMgmt | Number of Contract Line Item Number (CLIN)s | Quantity | CLINs | ||||
| 1.8 | Program Management | ProgMgmt | Number of Subcontractors | Quantity | Subcontractors | ||||
| 1.8 | Program Management | ProgMgmt | Number of Customer Stakeholders | Quantity | Stakeholders | ||||
| 1.8 | Program Management | ProgMgmt | Number of CDRLs | Quantity | CDRLs | ||||
| 1.9.4 | Mock-ups/System Integration Labs (SILs) | SIL | Modeling Type | List | YG | ||||
| 1.9.4 | Mock-ups/System Integration Labs (SILs) | SIL | Mock-up / SIL - Size | Square Feet | by Facility / Suite | YG | |||
| 1.9.4 | Mock-ups/System Integration Labs (SILs) | SIL | Mock-up / SIL - Primary Purpose | List | YG | ||||
| 1.9.5 | Test and Evaluation Support | T&ESupport | System Supply Packages | Quantity | Initial - Parts List and Count | ||||
| 1.9.6 | Test Facilities | ConstrConv | Facility Name | Descriptor | |||||
| 1.9.6 | Test Facilities | ConstrConv | Facility Description | Descriptor | |||||
| 1.9.6 | Test Facilities | ConstrConv | New product alteration square footage | Feet | |||||
| 1.10.1 | Equipment | TrainDevice | Training Device Name | Descriptor | Training Device Name | YG | |||
| 1.10.1 | Equipment | TrainDevice | Training Device Quantity | Quantity | Devices | YG | |||
| 1.10.1 | Equipment | TrainDevice | Training Device Description | Descriptor | YG | ||||
| 1.10.3 | Facilities | ConstrConv | Facility Name | Descriptor | |||||
| 1.10.3 | Facilities | ConstrConv | Facility Description | Descriptor | |||||
| 1.10.3 | Facilities | ConstrConv | New product alteration square footage | Feet | |||||
| 1.11.1 | Data Deliverables 1...n (Specify) | Data | Data Rights Category | List | |||||
| 1.11.2 | Data Repository | DataDepository | Storage Footprint | Square Feet | Data storage size | ||||
| 1.11.3 | Data Rights 1...n (Specify) | Data | Data Rights Category | List | |||||
| 1.12.1 | Test and Measurement Equipment | SupportEquipment | Quantity of Support Equipment | Quantity | Support Equipment | ||||
| 1.12.1 | Test and Measurement Equipment | SupportEquipment | Number of Locations | Quantity | Locations | ||||
| 1.12.1 | Test and Measurement Equipment | SupportEquipment | Support Equipment Locations | Descriptor | |||||
| 1.12.1 | Test and Measurement Equipment | SupportEquipment | Support and Handling Device Name | Descriptor | Support and Handling Device Name | YG | |||
| 1.12.1 | Test and Measurement Equipment | SupportEquipment | Support and Handling Device Description | Descriptor | Devices | YG | |||
| 1.12.2 | Support and Handling Equipment | SupportEquipment | Quantity of Support Equipment | Quantity | Support Equipment | ||||
| 1.12.2 | Support and Handling Equipment | SupportEquipment | Number of Locations | Quantity | Locations | ||||
| 1.12.2 | Support and Handling Equipment | SupportEquipment | Support Equipment Locations | Descriptor | |||||
| 1.12.2 | Support and Handling Equipment | SupportEquipment | Support and Handling Device Name | Descriptor | Support and Handling Device Name | YG | |||
| 1.12.2 | Support and Handling Equipment | SupportEquipment | Support and Handling Device Description | Descriptor | Devices | YG | |||
| 1.13.1 | Test and Measurement Equipment | SupportEquipment | Quantity of Support Equipment | Quantity | Support Equipment | ||||
| 1.13.1 | Test and Measurement Equipment | SupportEquipment | Number of Locations | Quantity | Locations | ||||
| 1.13.1 | Test and Measurement Equipment | SupportEquipment | Support Equipment Locations | Descriptor | |||||
| 1.13.1 | Test and Measurement Equipment | SupportEquipment | Support and Handling Device Name | Descriptor | Support and Handling Device Name | YG | |||
| 1.13.1 | Test and Measurement Equipment | SupportEquipment | Support and Handling Device Description | Descriptor | Devices | YG | |||
| 1.13.2 | Support and Handling Equipment | SupportEquipment | Quantity of Support Equipment | Quantity | Support Equipment | ||||
| 1.13.2 | Support and Handling Equipment | SupportEquipment | Number of Locations | Quantity | Locations | ||||
| 1.13.2 | Support and Handling Equipment | SupportEquipment | Support Equipment Locations | Descriptor | |||||
| 1.13.2 | Support and Handling Equipment | SupportEquipment | Support and Handling Device Name | Descriptor | Support and Handling Device Name | YG | |||
| 1.13.2 | Support and Handling Equipment | SupportEquipment | Support and Handling Device Description | Descriptor | Devices | YG | |||
| 1.14 | Operational/Site Activation by Site 1...n (Specify) | OpSiteActivation | Facility Description | Descriptor | |||||
| 1.14 | Operational/Site Activation by Site 1...n (Specify) | OpSiteActivation | Organic Site Activation | List | |||||
| 1.14 | Operational/Site Activation by Site 1...n (Specify) | OpSiteActivation | Amplifying Descriptive Text | Descriptor | |||||
| DD FORM 2794 (PAGE 8), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019 |
Pg 8a (TECH RQTS Definitions)
| COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS | |||||||||||||||||
| TECHNICAL PARAMETER REQUIREMENTS (Definitions) | |||||||||||||||||
| 26. WBS | |||||||||||||||||
| ELEMENT CODE | 27. WBS ELEMENT NAME | 29. TECHNICAL PARAMETER | TECHNICAL PARAMETER (Definintions and Choice List) | ||||||||||||||
| a. PARAMETER NAME | b. UNIT OF MEASURE | DEFINITION | List Item #1 | List Item #2 | List Item #3 | List Item #4 | List Item #5 | List Item #6 | List Item #7 | List Item #8 | List Item #9 | List Item #10 | List Item #n | ||||
| 1.2.9 | Payload | New Design | Percent | Heritage: The extent of the item's design that is new using a 0-100% scale with the following guidelines: |
- 0%-10% Existing design. Build-to-print or previously qualified design solution, TRL is expected to be high (e.g. TRL 9).
- 10%-40% Minor design change. No change to form, fit, function of the solution. May result from parts obsolescence and/or producibility enhancements. Considers updates to configuration drawings and test procedures as necessary. Includes any design reviews and changes to engineering/prototype/qualification models as needed. Anticipate the design will be qualified by similarity or analysis. TRL is expected to be high (e.g. TRL 8-9.)
- 40%-70% Moderate design changes. Solution derived from previously qualified design. Includes updates to configuration drawings and test procedures. Includes design reviews, modified tooling & test equipment, and engineering/prototype/qualification models needed to qualify the modified design. TRL is expected to be moderately high (e.g. TRL 7-8).
- 70%-100% Major redesign or new design to meet derived requirements. New form, fit, and function solution. Includes design reviews, tooling & test equipment, and engineering/prototype/qualification models needed to qualify the design. This range suggests a significant design effort - TRL may be in the 5-7 range.
Note for all designs lower than TRL-6, significant technology maturation may be required over and above the effort outlined above.
| 1.2.9 | Payload | Predecessor System | Descriptor | The year of the predecessor system | ||
| 1.2.9 | Payload | Insensitive Munitions Requirements | List | Denotes if the Payload Target Defeat Mechanism is subject to insensitive munitions requirements | Yes | No |
| 1.2.9 | Payload | Weight - Explosive | Pounds | The Payload Target Defeat Mechanism's Warhead Explosive Weight. | ||
| 1.2.9 | Payload | Warhead Penetration | Inches | The Payload Target Defeat Mechanism's Warhead Penetration. | ||
| 1.2.9.1 | Payload Common to All Variants | Material Mix 1…n | Percent of Total Weight | List of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable) | ||
| 1.2.9.1 | Payload Common to All Variants | Volume | Cubic Inches | Physical volume of the item. | ||
| 1.2.9.1 | Payload Common to All Variants | Weight | Pounds | Physical weight of the item. | ||
| 1.2.9.1 | Payload Common to All Variants | Insensitive Munitions Requirements | List | Denotes if the Payload Target Defeat Mechanism is subject to insensitive munitions requirements | Yes | No |
| 1.2.9.1 | Payload Common to All Variants | Weight - Explosive | Pounds | The Payload Target Defeat Mechanism's Warhead Explosive Weight. | ||
| 1.2.9.1 | Payload Common to All Variants | Warhead Penetration | Inches | The Payload Target Defeat Mechanism's Warhead Penetration. | ||
| 1.3 | Encasement Device | New Design | Percent | Heritage: The extent of the item's design that is new using a 0-100% scale with the following guidelines: |
- 0%-10% Existing design. Build-to-print or previously qualified design solution, TRL is expected to be high (e.g. TRL 9).
- 10%-40% Minor design change. No change to form, fit, function of the solution. May result from parts obsolescence and/or producibility enhancements. Considers updates to configuration drawings and test procedures as necessary. Includes any design reviews and changes to engineering/prototype/qualification models as needed. Anticipate the design will be qualified by similarity or analysis. TRL is expected to be high (e.g. TRL 8-9.)
- 40%-70% Moderate design changes. Solution derived from previously qualified design. Includes updates to configuration drawings and test procedures. Includes design reviews, modified tooling & test equipment, and engineering/prototype/qualification models needed to qualify the modified design. TRL is expected to be moderately high (e.g. TRL 7-8).
- 70%-100% Major redesign or new design to meet derived requirements. New form, fit, and function solution. Includes design reviews, tooling & test equipment, and engineering/prototype/qualification models needed to qualify the design. This range suggests a significant design effort - TRL may be in the 5-7 range.
Note for all designs lower than TRL-6, significant technology maturation may be required over and above the effort outlined above.
| 1.3 | Encasement Device | Predecessor System | Descriptor | The year of the predecessor system |
| 1.3 | Encasement Device | Material Mix 1…n | Percent of Total Weight | List of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable) |
| 1.3 | Encasement Device | Volume | Cubic Inches | Physical volume of the item. |
| 1.3 | Encasement Device | Weight | Pounds | Physical weight of the item. |
| 1.3 | Encasement Device | Thickness - Canister | Inches | The Encasement Device's Canister Thickness. |
| 1.3.1 | Top Attack DLM | Material Mix 1…n | Percent of Total Weight | List of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable) |
| 1.3.1 | Top Attack DLM | Volume | Cubic Inches | Physical volume of the item. |
| 1.3.1 | Top Attack DLM | Weight | Pounds | Physical weight of the item. |
| 1.4 | Command and/or Launch | New Design | Percent | Heritage: The extent of the item's design that is new using a 0-100% scale with the following guidelines: |
- 0%-10% Existing design. Build-to-print or previously qualified design solution, TRL is expected to be high (e.g. TRL 9).
- 10%-40% Minor design change. No change to form, fit, function of the solution. May result from parts obsolescence and/or producibility enhancements. Considers updates to configuration drawings and test procedures as necessary. Includes any design reviews and changes to engineering/prototype/qualification models as needed. Anticipate the design will be qualified by similarity or analysis. TRL is expected to be high (e.g. TRL 8-9.)
- 40%-70% Moderate design changes. Solution derived from previously qualified design. Includes updates to configuration drawings and test procedures. Includes design reviews, modified tooling & test equipment, and engineering/prototype/qualification models needed to qualify the modified design. TRL is expected to be moderately high (e.g. TRL 7-8).
- 70%-100% Major redesign or new design to meet derived requirements. New form, fit, and function solution. Includes design reviews, tooling & test equipment, and engineering/prototype/qualification models needed to qualify the design. This range suggests a significant design effort - TRL may be in the 5-7 range.
Note for all designs lower than TRL-6, significant technology maturation may be required over and above the effort outlined above.
| 1.4 | Command and/or Launch | Predecessor System | Descriptor | The year of the predecessor system |
| 1.4.1 | Command and/or Launch Integration, Assembly, Test, and Checkout | Number of Electrical Connections | Quantity | The number of electrical and electronic connections at this level of assembly. |
| 1.4.1 | Command and/or Launch Integration, Assembly, Test, and Checkout | Number of Mechanical Connections | Quantity | The number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly. |
| 1.4.1 | Command and/or Launch Integration, Assembly, Test, and Checkout | Number of Interface Control Drawings (ICD) | Quantity | |
| 1.4.11 | Authoritative Safety Device (ASD) | New Design | Percent | Heritage: The extent of the item's design that is new using a 0-100% scale with the following guidelines: |
- 0%-10% Existing design. Build-to-print or previously qualified design solution, TRL is expected to be high (e.g. TRL 9).
- 10%-40% Minor design change. No change to form, fit, function of the solution. May result from parts obsolescence and/or producibility enhancements. Considers updates to configuration drawings and test procedures as necessary. Includes any design reviews and changes to engineering/prototype/qualification models as needed. Anticipate the design will be qualified by similarity or analysis. TRL is expected to be high (e.g. TRL 8-9.)
- 40%-70% Moderate design changes. Solution derived from previously qualified design. Includes updates to configuration drawings and test procedures. Includes design reviews, modified tooling & test equipment, and engineering/prototype/qualification models needed to qualify the modified design. TRL is expected to be moderately high (e.g. TRL 7-8).
- 70%-100% Major redesign or new design to meet derived requirements. New form, fit, and function solution. Includes design reviews, tooling & test equipment, and engineering/prototype/qualification models needed to qualify the design. This range suggests a significant design effort - TRL may be in the 5-7 range.
Note for all designs lower than TRL-6, significant technology maturation may be required over and above the effort outlined above.
| 1.4.11 | Authoritative Safety Device (ASD) | Predecessor System | Descriptor | The year of the predecessor system | ||||||||
| 1.4.11 | Authoritative Safety Device (ASD) | Material Mix 1…n | Percent of Total Weight | List of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable) | ||||||||
| 1.4.11 | Authoritative Safety Device (ASD) | Volume | Cubic Inches | Physical volume of the item. | ||||||||
| 1.4.11 | Authoritative Safety Device (ASD) | Weight | Pounds | Physical weight of the item. | ||||||||
| 1.4.11 | Authoritative Safety Device (ASD) | Weight - Structural | Pounds | The item's mechanical/structural weight. | ||||||||
| 1.4.11 | Authoritative Safety Device (ASD) | Weight - Electronics | Pounds | The item's electronics weight. | ||||||||
| 1.4.11 | Authoritative Safety Device (ASD) | Power - Maximum Consumption Rate | Kilowatts | Maximum rate of power consumption by the item. | ||||||||
| 1.6 | Platform Integration, Assembly, Test, and Checkout 1...n (Specify) | Number of Electrical Connections | Quantity | The number of electrical and electronic connections at this level of assembly. | ||||||||
| 1.6 | Platform Integration, Assembly, Test, and Checkout 1...n (Specify) | Number of Mechanical Connections | Quantity | The number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly. | ||||||||
| 1.6 | Platform Integration, Assembly, Test, and Checkout 1...n (Specify) | Number of Interface Control Drawings (ICD) | Quantity | |||||||||
| 1.7 | Systems Engineering | Number of Requirement Document - "Shalls" | Quantity | The number of requirements cited in the system's requirements documents. | ||||||||
| 1.7 | Systems Engineering | Number of Platforms - Integrated | Quantity | The number of platforms (e.g. aircraft) on which the system will be qualified. | ||||||||
| 1.8 | Program Management | Frequency of Government Program Reviews | Quantity | The Frequency of Government Program Reviews in the contract. | ||||||||
| 1.8 | Program Management | Number of Contract Line Item Number (CLIN)s | Quantity | The number of Contract CLINs in the contract. | ||||||||
| 1.8 | Program Management | Number of Subcontractors | Quantity | The number of major subcontractors/suppliers in the program. | ||||||||
| 1.8 | Program Management | Number of Customer Stakeholders | Quantity | The number of customers and stakeholders that may require management accommodation. Stakeholders consist of any group or organization with a related or subsequent responsibility that is directly related to the outcome of an action or result. Generally speaking they can influence the outcome or are the recipient of the results. The range of personnel selected to participate as stakeholders is based on the outcome and processes involved. Typical stakeholders are: users or operators, acquisition commands, test communities, depots, manpower, personnel & training communities, maintainers, and suppliers | ||||||||
| 1.8 | Program Management | Number of CDRLs | Quantity | The number of Contract Data Requirements List items for which the CRS element staff is responsible. | ||||||||
| 1.9.4 | Mock-ups/System Integration Labs (SILs) | Modeling Type | List | Describes the types of modeling to be performed by the SIL. | 3-DOF | 6-DOF | Hardware in the loop | Other | ||||
| 1.9.4 | Mock-ups/System Integration Labs (SILs) | Mock-up / SIL - Size | Square Feet | Facility area measured in square feet. | ||||||||
| 1.9.4 | Mock-ups/System Integration Labs (SILs) | Mock-up / SIL - Primary Purpose | List | Describes the SIL's primary purpose. | V&V | Prototyping | System Qualification | Other | ||||
| 1.9.5 | Test and Evaluation Support | System Supply Packages | Quantity | For System Supply Packages, provide parts list and count comprising the spares package for the test campaign. Contains the deliverable spare components, assemblies and subassemblies used for initial replacement purposes in the materiel system equipment end item. Use a copy of the Parts Level table for an extensive list. | ||||||||
| 1.9.6 | Test Facilities | Facility Name | Descriptor | The facility name. | ||||||||
| 1.9.6 | Test Facilities | Facility Description | Descriptor | Describes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc. | ||||||||
| 1.9.6 | Test Facilities | New product alteration square footage | Feet | New product alteration square footage | ||||||||
| 1.10.1 | Equipment | Training Device Name | Descriptor | Training equipment name. | ||||||||
| 1.10.1 | Equipment | Training Device Quantity | Quantity | Training equipment quantity. Note: Describe Annual Quantity by Location in Time Phased Quantity Table | ||||||||
| 1.10.1 | Equipment | Training Device Description | Descriptor | Description of training devices | ||||||||
| 1.10.3 | Facilities | Facility Name | Descriptor | The facility name. | ||||||||
| 1.10.3 | Facilities | Facility Description | Descriptor | Describes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc. | ||||||||
| 1.10.3 | Facilities | New product alteration square footage | Feet | New product alteration square footage | ||||||||
| 1.11.1 | Data Deliverables 1...n (Specify) | Data Rights Category | List | Category of Data Rights Purchased | Unlimited Rights | Government Purpose Rights | Limited Rights | Restricted Rights | Negotiated License Rights | SBIR Data Rights | Commercial Technical Data License Rights | Commercial Computer Software Licenses |
| 1.11.2 | Data Repository | Storage Footprint | Square Feet | The area required for data storage. | ||||||||
| 1.11.3 | Data Rights 1...n (Specify) | Data Rights Category | List | Category of Data Rights Purchased | Unlimited Rights | Government Purpose Rights | Limited Rights | Restricted Rights | Negotiated License Rights | SBIR Data Rights | Commercial Technical Data License Rights | Commercial Computer Software Licenses |
| 1.12.1 | Test and Measurement Equipment | Quantity of Support Equipment | Quantity | Total number of support equipment used on the program | ||||||||
| 1.12.1 | Test and Measurement Equipment | Number of Locations | Quantity | Number of locations support equipment is utilized | ||||||||
| 1.12.1 | Test and Measurement Equipment | Support Equipment Locations | Descriptor | List of all locations support equipment is utilized. | ||||||||
| 1.12.1 | Test and Measurement Equipment | Support and Handling Device Name | Descriptor | Support and Handling Device equipment name. | ||||||||
| 1.12.1 | Test and Measurement Equipment | Support and Handling Device Description | Descriptor | Describes the Support and Handling Device equipment | ||||||||
| 1.12.2 | Support and Handling Equipment | Quantity of Support Equipment | Quantity | Total number of support equipment used on the program | ||||||||
| 1.12.2 | Support and Handling Equipment | Number of Locations | Quantity | Number of locations support equipment is utilized | ||||||||
| 1.12.2 | Support and Handling Equipment | Support Equipment Locations | Descriptor | List of all locations support equipment is utilized. | ||||||||
| 1.12.2 | Support and Handling Equipment | Support and Handling Device Name | Descriptor | Support and Handling Device equipment name. | ||||||||
| 1.12.2 | Support and Handling Equipment | Support and Handling Device Description | Descriptor | Describes the Support and Handling Device equipment | ||||||||
| 1.13.1 | Test and Measurement Equipment | Quantity of Support Equipment | Quantity | Total number of support equipment used on the program | ||||||||
| 1.13.1 | Test and Measurement Equipment | Number of Locations | Quantity | Number of locations support equipment is utilized | ||||||||
| 1.13.1 | Test and Measurement Equipment | Support Equipment Locations | Descriptor | List of all locations support equipment is utilized. | ||||||||
| 1.13.1 | Test and Measurement Equipment | Support and Handling Device Name | Descriptor | Support and Handling Device equipment name. | ||||||||
| 1.13.1 | Test and Measurement Equipment | Support and Handling Device Description | Descriptor | Describes the Support and Handling Device equipment | ||||||||
| 1.13.2 | Support and Handling Equipment | Quantity of Support Equipment | Quantity | Total number of support equipment used on the program | ||||||||
| 1.13.2 | Support and Handling Equipment | Number of Locations | Quantity | Number of locations support equipment is utilized | ||||||||
| 1.13.2 | Support and Handling Equipment | Support Equipment Locations | Descriptor | List of all locations support equipment is utilized. | ||||||||
| 1.13.2 | Support and Handling Equipment | Support and Handling Device Name | Descriptor | Support and Handling Device equipment name. | ||||||||
| 1.13.2 | Support and Handling Equipment | Support and Handling Device Description | Descriptor | Describes the Support and Handling Device equipment | ||||||||
| 1.14 | Operational/Site Activation by Site 1...n (Specify) | Facility Description | Descriptor | Describes each facility and quantifies to the extent possible in terms of square feet, number of installations, power, etc. | ||||||||
| 1.14 | Operational/Site Activation by Site 1...n (Specify) | Organic Site Activation | List | Denotes if the site activation is a Government activity | Yes | No | ||||||
| 1.14 | Operational/Site Activation by Site 1...n (Specify) | Amplifying Descriptive Text | Descriptor | Additional text as needed regarding the description of the amplification. | ||||||||
| DD FORM 2794 (PAGE 8a), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019 |