Attachment 11 - VHA Required Division 01 Specification Sections List.docx

DOCX document 19 KB Posted

Attached to
C1DA--EHRM Infrastructure Upgrade Central Western Massachusetts 631-21-700
Solicitation number
36C77621R0089
Issued by

About this file

This presolicitation notice seeks Standard Form 330 qualification packages from architecture and engineering firms for a design contract. The selected firm will provide complete construction documents including drawings, specifications, reports and construction period services for an EHRM Infrastructure Upgrade project located at the Edward P. Boland VAMC in Central Western Massachusetts. The project requires experience in network infrastructure installation, IT system renovations and upgrades. The anticipated award date for the A-E contract is September 2021, with a 290-day period of performance for design completion. The construction magnitude is estimated between $20-50 million. Responses are due by June 23, 2021 and will be evaluated based on specialized experience, professional qualifications, capacity, past performance and knowledge of the locality. The secondary selection criterion is geographic proximity to the project site.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements