This document provides details on a federal contract opportunity for construction services. The solicitation is numbered 36C26321R0102 and seeks offers to construct an air handling tower at a Veterans Affairs medical center. The opportunity is set aside for service-disabled veteran-owned small businesses. Offerors must submit responses by May 28, 2021. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23 is the contracting agency. The opportunity includes 31 pages of architectural drawings as attachments outlining the project specifications.

View the file

Other files

File Type Posted
36C26321R0102 0004.pdf PDF
36C26321R0102 0003.pdf PDF
Electrical Addendum 1 (1 Page).pdf PDF
Prime EMR Information for Responsibility Determination (1 Page).doc DOC document
Questions and Answers (4 Pages).docx DOCX document
Drawing EP108 (1 Page).pdf PDF
Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Site Visit Attendance Roster (1 Page).pdf PDF
Drawing EP100 (1 Page).pdf PDF
Drawing E502 (1 Page).pdf PDF
36C26321R0102 0002.pdf PDF
36C26321R0102 0001.pdf PDF
Attachment_JA TycoSimplex Redacted 6.23.21 (4 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 7 of 10 Plumb Fire 21.05.28 (27 Pages).pdf PDF
Attachment_Wage Determination Douglas County 4-23-21 (5 Pages).docx DOCX document
Attachment_100_ CD Bid Set Drawings - 1 of 10 Gen 21.05.28 (19 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 10 of 10 Tech 21.05.28 (13 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 5 of 10 Struct 21.05.28 (14 Pages).pdf PDF
Attachment_100_ CD Specs Vol II 21.05.28 (1115 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 6 of 10 Mech 21.05.28 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 8 of 10 Elec 1 21.05.28 (35 Pages).pdf PDF
Attachment_Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Attachment_100_ CD Bid Set Drawings - 9 of 10 Elec 2 21.05.28 (9 Pages).pdf PDF
Attachment_Prime EMR Information for Responsibility Determination (1 Pages).doc DOC document
Attachment_Past Performance Questionnaire for Responsibility Determination (3 Pages).doc DOC document
Attachment_JA Snyder Electric Redacted (2 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 2 of 10 Civil Haz 21.05.28 (11 Pages).pdf PDF
Attachment_Design Narrative 5-28-21 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 4 of 10 Arch 2 21.05.28 (3 Pages).pdf PDF
Attachment_JA Coremax Redacted (2 Pages).pdf PDF
Attachment_100_ CD Specs Vol I 21.05.28 (824 Pages).pdf PDF
36C26321R0102_4.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

STORAGE

OFFICE

OFFICEOFFICE

OFFICE OFFICE

OFFICES

OFFICE

OFFICE

OFFICE

OFFICES

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICEOFFICEOFFICEOFFICE

OFFICE

OFFICE OFFICE

OFFICE

ELEC

OFFICE

VAULTIT

BREAK

STOR

OFFICE

PHARMACY

LINEN

STORAGE

ROOM

CLOTHING

ROOM

LOCKER

MALE

ELECTRIC

OFFICEOFFICE

MECHANICAL

HVAC

TLT

TLT

00031 00032

05121 05122

F

F

54'-03/4"

B618A

B618

B069C

B702DB702EB702FB702G

B801

B588

B582A

B587

B586

B585

B584A

B584

B583

B582C

B582B

B582

B581 B580

B588A

B708 B707

B007

B622

B700B

B579

B530

B020

B002

B700A

B001

B556F

B556E

B628

B626

B702C

B702

B629

B702B

B611

B601A

B614

B802A

B609

B701

B703

B805B

B705

B805A

B805

B803

B806

B808

B821CB821D

B716

B804B719

B721

B712

B717

B710

B802

B714

B624

B630

B700

B632

B601

B605 B607

B613B615B617

B702

B610B612

B629DB629C

B629AB629B

B522A

B535A

B540A

B535

B514A

#8#7

B556C

B556D

B506B508

#5

#4

#3

B075 B069

B069B

B054

B064

B051 B049 B046 B069A

B030A

B040 B039

B036

B030

B070

B119

B005

B003

B009

B009A

B025

B024FB024D

B024C B024E

B024AA

B024A

B503

B502

B501

B505A B505

B024

B589

BLDG.

#2

#1

A101

B500B504

B522

B526

B533

B533A

B533AA

B537

B540

B542

B514 B545B551

B551AB556A

B556

B556B

B577

B590

UP

x x x xxxxx

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

A

B

C

D

E

F G

H

J

K

L

M

N

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 242 25

EXIST STO/

PLUMBING

B111

EXIST

STORAGE

CANTEEN

B113

EXIST

LOBBY

B090

EXIST STOR

BIO HAZ/

INFECT

WASTE

B094

EXIST

STORAGE

B095

EXIST STOR

CANTEEN

B102

E WOM

B103

E MENS

B080

EXIST STAIR

B079

EXIST

OFFICES

B119A

EXIST

B092

FUTURE

MECHANICAL

DEMOLITION

FLOOR

B093

CORRIDOR

HAZARDOUS

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE

WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY

ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN

THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO PROCEEDING WITH

REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL BE

VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS SHALL

PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR SCHEDULED

FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH TRADES

WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING BEHIND

ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE RESISTIVE

RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE RATING

INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT THE DECK

ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE SEALED WITH FIRE

CAULK.

15. FIRST FLOOR ELEVATION 234'-6" AS SHOWN ON ARCHITECTURE DRAWINGS WAS OBTAINED FROM

ORIGINAL BUILDING ASBUILTS PROVIDED BY THE OWNER AND WAS DERIVED FROM AN UNKNOWN

DATUM. ARCH FIRST FLOOR ELEVATION 234'-6" = EXISTING BUILDING FIRST FLOOR ELEVATION NOTED ON THE CIVIL DRAWINGS AS 235'-0", A RECENTLY SURVEYED ELEVATION BY THE DESIGN TEAM. THE INTENT OF THIS PROJECT IS FOR THE NEW T/O SLAB ELEVATIONS AT EACH FLOOR LEVEL TO MATCH THE ELEVATION OF THE EXISTING FLOOR IN THE EXISTING BUILDING. CONTRACTOR MUST VERIFY AND COORDINATE ACTUAL EXISTING FLOOR-TO-FLOOR ELEVATIONS AND ALIGN NEW FLOORS TO EXISTING.

16. REFER TO SHEET SERIES GC100-GC118 FOR INFECTION CONTROL AND RISK ASSESSMENT

CONSTRUCTION PLANS BY FLOOR LEVEL.

17. REFER TO SHEET SERIES GI010-GI018 FOR LIFE SAFETY AND CODE SUMMARY INFORMATION BY

FLOOR LEVEL.

18. REFER TO SHEET SERIES HA### FOR HAZARDOUS MATERIAL IDENTIFICATION AND ABATEMENT PLANS.

19. BLAST-RESISTANT DESIGN REQUIREMENTS ARE PROVIDED IN SPECIFICATION 044200 FOR EXTERIOR STONE CLADDING, 074213 METAL WALL PANELS, 034500 PRECAST ARCHITECTURAL CONCRETE, AND

089000 LOUVERS AND VENTS.

20. REFER TO SPECIFICATION SECTION 09 06 09 COLOR SCHEDULE, THE VA OMAHA'S FACILITY SPECIFIC SCHEDULE OF FINISHES, IN ADDITION TO EACH PRODUCT'S RESPECTIVE SPECIFICATION SECTION FOR INFORMATION REGARDING PROJECT BUILDING FINISHES. ROOM SPECIFIC FINISH INFORMATION

CAN BE FOUND ON SHEET GI001.

21. WOOD BLOCKING WITHIN WALL SYSTEM SHALL BE FIRE RETARDANT TREATED. ALL EXTERIOR WOOD BLOCKING SHALL ALSO BE MOISTURE TREATED. WOOD MAY NOT BE USED IN AN EXPOSED LOCATION

UNLESS IT IS A FINISH MATERIAL IN A NON-COMBUSTIBLE ASSEMBLY OR AS SPECIFIED.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG1A

AE2O1

INTERIOR SECTION

REFERENCE TAG1A

KEY NOTE

A NEW GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

A

EXISTING GRIDLINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

AE100

BASEMENT LEVEL FLOOR PLAN -

OVERALL

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 BASEMENT LEVEL FLOOR PLAN - OVERALL

Revisions: Date:

PNEUM TUBE

STATION

PNEUM TUBE

STATION

EXIT

EXIT

EXIT

EXIT

PRNTR

(NIC)

FAX

(NIC)

PRNTR

(NIC)

UNDER

COUNTER

D C

C

H

J

TV

UP

DN

WAITING

TELECOM

ELECTRIC

FEMALEMALE

OFFICE

OFFICE

OFFICE

#1

#2

#6 #7 #9

#10 #11 #12

#13 #14 #15

#16 #17 #18

UTIL #19

#3

OFFICE

WAITING

ELECSTOR

1655A

165316521651

164916481647

164516441643

164016391638

16581660

15601566

1434 1430

1436 1428

1442 1422

1446a

1450a

1615C

1505A

18071806

1432A

1620A

15071506

BREAK

ROOM

INFORMATION

WAITING

LOBBY

unisex mens

1352 1354 1356

1369 1368

137313721371

137413751376

1383A

1385A

1385B13841382

14061366A

TLT

ELECTRICAL

POWER

DISTRIBUTION

EMERGENCY

GENERATORS

VASCULAR

LAB

VASCULAR

LAB

JANITOR

N.S.

WAITING

OFFICE OFFICE OFFICE

OFFICE

LOUNGE

TLT

OFFICE

STORAGE

JAN

WAITING

INTERVIEW

TLT

OFFICE

OFFICE

EXAM

TELCOM

OVER

HEAD

AUDIO

SUPPLY

AUDIOLOGY

AUDIOLOGY

MECHANICAL

OFFICE

CONF

JAN

VAULT

PHARMACY

OFFICE

CONSULT

COMPOUND

OFFICE

PERC

OFFICEOFFICE OFFICE OFFICE OFFICE

OFFICE

LAB

EXAMEXAMEXAM

EXAM EXAM

EXAM

STORAGE

EXAM

EXAM

LAB

EXAM

R.R.

OFFICE

WORKEXAM

EXAM

WORK

WORK

ROOM

EXAM

#15 EXAM

#6

EXAM

#7

EXAM

#8

EXAM

#13

EXAM

#12

EXAM

#11 EXAM

#10

EXAM

#9

EXAM

#3

EXAM

#4

EXAM

#5

EXAM

#2

EXAM

#1

COORIDOR

TEAM

CENTER

OFFICE

NURSE

STATION NURSE

STATION

CLERICAL/

BUSINESS

COFFEE

MAIL

RM/

COPY

CENTER

TELEPHONE

SW.BD

MENS

TLT

PRAYER

RM

CHECK

IN

STAFF

LOUNGE

OPTHAMOLOGYRM

#10

OPTHAMOLOGYRM

#9

OPTHAMOLOGYRM

#8

OPTHAMOLOGYRM

#1

OPTHAMOLOGYRM

#2

OPTHAMOLOGYRM

#3

OPTHAMOLOGYRM

#4

OPTHAMOLOGYRM

#7

OPTHAMOLOGYRM

#6

OPTHAMOLOGYRM

#5

OPTHAMOLOGY

LASER

ROOM

VASCULAR

PROC

CHECK

IN

SEATING

EXAM

OFFICE

INTERVIEW OFFICE

EXAM

C

EXAM

B

EXAM

A

EXAM

#7

TRIAGE

EXAM

#8

EXAM

#9

EXAM

#10

WAITING

ROOM

RECEPTION

SUPPLY

RM TLT

EXAM

#3

EXAM

#2

EXAM

#1

EXAM

#4

EXAM

#5

EXAM

#6

BREAK

ROOM

TLT

CALL

ROOM

OFFICE/

EXAM

WAIT

OFFICETLTTLT

CLST

DIRTY

UTILITY

UTILITY

OFFICE

OFFICE

POLICETLT

ELEV.

LOBBY

OFFICE

EXAM

#18

EXAM

#17

EXAM

#16

EXAM

#15

EXAM

#14

EXAM

#10

EXAM

#7

EXAM

#8

EXAM

#11

OFFICE

OFFICE

EXAM

#9

EXAM

#12

EXAM

#19

EXAM

#5

EXAM

#4

EXAM

#3

EXAM

#2

EXAM

#1

CONSULT

CHECK

IN/OUT

EXAM

#6

OFFICE

STOREXAM

#20

OFFICE

EXAM

#21

EXAM

#22

EXAM

#23

AGENT

CASHIER

CHECK

IN

LABSTOR

STAFF

TLT

PUBLIC

TLT

DRAW

DRAW

DRAW

DRAW

DRAW

DRAW

FAMILY

TLT

OFFICE

CARE

COORD

TLT

RECEPTIONOFFICE

TRANSITIONAL

CARE

1206A

11001200

#1

#2

ELEV

1205A

1269A

1265 1257

1226 1228

1230 1231

1207 1205 1203 1201

ELEV

LOBBY

1317A

1140A

1001A 1001E

1001B

1025A

1053A 1053B 1053C 1053D

1053E

1053G

1053F

1132 1134 1138 1140

11431141113911371135

1129ELEV

A

#7 #8

#6

1110 1114

1012A 1012B 1012C

#3

#4

#5

#9 #10

1104A

1167A

1163A

12371236

13181320

1310 1300D

1300C

1300B

1300A1300E

1000A1301

13051315

1000B

1330A 1330B 1330C

FE

FE

A

B

C

D

E

F G

H

J

K

L

M

N

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 2421 25

1104A

FUTURE

MECHANICAL

EXIST EXAM

EXIST EXAM

EXIST EXAM

EXIST EXAM

EXIST

OFFICE

EXIST

WAITING

1050A

EXIST

OFFICE

EXIST

AUDIOLOGY

EXIST

AUDIOLOGY

EXIST

OFFICE

1103A

EXIST

OFFICE

1115A

EXIST

SOUND

BOOTH

EXIST STAIR

B

CO

RR

ID

OR

EXISTING

CORRIDOR

DOWN

UP

DEMOLITION

FLOOR

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE

WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY

ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN

THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO PROCEEDING WITH

REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL BE

VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS SHALL

PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR SCHEDULED

FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH TRADES

WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING BEHIND

ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE RESISTIVE

RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE RATING

INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT THE DECK

ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE SEALED WITH FIRE

CAULK.

15. FIRST FLOOR ELEVATION 234'-6" AS SHOWN ON ARCHITECTURE DRAWINGS WAS OBTAINED FROM

ORIGINAL BUILDING ASBUILTS PROVIDED BY THE OWNER AND WAS DERIVED FROM AN UNKNOWN

DATUM. ARCH FIRST FLOOR ELEVATION 234'-6" = EXISTING BUILDING FIRST FLOOR ELEVATION NOTED ON THE CIVIL DRAWINGS AS 235'-0", A RECENTLY SURVEYED ELEVATION BY THE DESIGN TEAM. THE INTENT OF THIS PROJECT IS FOR THE NEW T/O SLAB ELEVATIONS AT EACH FLOOR LEVEL TO MATCH THE ELEVATION OF THE EXISTING FLOOR IN THE EXISTING BUILDING. CONTRACTOR MUST VERIFY AND COORDINATE ACTUAL EXISTING FLOOR-TO-FLOOR ELEVATIONS AND ALIGN NEW FLOORS TO EXISTING.

16. REFER TO SHEET SERIES GC100-GC118 FOR INFECTION CONTROL AND RISK ASSESSMENT

CONSTRUCTION PLANS BY FLOOR LEVEL.

17. REFER TO SHEET SERIES GI010-GI018 FOR LIFE SAFETY AND CODE SUMMARY INFORMATION BY

FLOOR LEVEL.

18. REFER TO SHEET SERIES HA### FOR HAZARDOUS MATERIAL IDENTIFICATION AND ABATEMENT PLANS.

19. BLAST-RESISTANT DESIGN REQUIREMENTS ARE PROVIDED IN SPECIFICATION 044200 FOR EXTERIOR STONE CLADDING, 074213 METAL WALL PANELS, 034500 PRECAST ARCHITECTURAL CONCRETE, AND

089000 LOUVERS AND VENTS.

20. REFER TO SPECIFICATION SECTION 09 06 09 COLOR SCHEDULE, THE VA OMAHA'S FACILITY SPECIFIC SCHEDULE OF FINISHES, IN ADDITION TO EACH PRODUCT'S RESPECTIVE SPECIFICATION SECTION FOR INFORMATION REGARDING PROJECT BUILDING FINISHES. ROOM SPECIFIC FINISH INFORMATION

CAN BE FOUND ON SHEET GI001.

21. WOOD BLOCKING WITHIN WALL SYSTEM SHALL BE FIRE RETARDANT TREATED. ALL EXTERIOR WOOD BLOCKING SHALL ALSO BE MOISTURE TREATED. WOOD MAY NOT BE USED IN AN EXPOSED LOCATION

UNLESS IT IS A FINISH MATERIAL IN A NON-COMBUSTIBLE ASSEMBLY OR AS SPECIFIED.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG1A

AE2O1

INTERIOR SECTION

REFERENCE TAG1A

KEY NOTE

A NEW GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

A

EXISTING GRIDLINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

AE101

FIRST LEVEL FLOOR PLAN -

OVERALL

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 FLOOR PLAN - LEVEL 1 - OVERALL

STATION

PNEUM

TUBE

STATION

#7

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

#1

SURGERY

ACCESS

TO

FUTURE

C A

B C

A B

C A

B C

A B

TA

B

LE

TABLE

BIO

BIO

IV

IV

BED

STORAGE

ROOM

PATIENT

ROOM

PATIENTROOM

PATIENT

ULTRASOUND

STORAGE -

XRAY

CONFERENCE

ROOM

STORAGE

C/T

SCANNER

MECH

JANELEC

2774 2775 2774

2801 2802

TOILET

FORTE

CAMERA

READING

AREA

WAITING

ROOM

CHEMICAL

STRESS

ROOM

CORRIDOR

CORRIDOR

BRIGHTVIEW

XCT CONTROL

ROOM

GEMINI

PET/CT

UPTAKE

HOT

TOILET

HOT

LAB

CORRIDOR

WORK

RM.

CATH LAB

A

MED

PATIENT

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

WAITING

SLEEP

RM

SLEEP

RM

OFFICE

OFFICE

LOCKER

RMOFFICE

NURSING

REPORT

RM

MED

RM

DEXA

CONSULT

UTILITY

CLEAN

UTILITY

SOILED

JANRM

NUTRIT

RM

MED

OFFICE

OFFICEOFFICE

ROOM

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

HISTOLOGY

CHEMISTRY

ROOF

ROOF

ROOM

PROCEDURE

ROOM

PROCEDURE

CLEAN

STORAGE

TOILET

SUPPLIES

DIRTY

ROOM

PROCEDURE

AIR

HANDLER

AIR

HANDLER

AIR HANDLER

#2

ELECTRIC

VOLTAGE

HIGH

SHAFT

HVAC

TELECOM

WAITING

XRAY

CHEST

XRAY

C.R.

ROOM

VIEWING

TLTTLT

CTRLCTRL

XRAY

XRAY

LOCKER

ROOM

VIEWING

OFFICE

SOUND

ULTRAOFFICE

TLTTLT

OFFICE

OFFICE

OFFICE

ROOM

CONFERENCE

OFFICE

ROOM

READING

OFFICE

OFFICE

TLT

ACCESSION

CENTRALHEMATOLOGY

XRAY FILE

ROOM

ELEC

TLTJAN

OFFICEOFFICE

FROZEN

SECTION

BANK

BLOOD

TOXICOLOGY CHEMISTRY

OFFICE

OFFICE

PRINTERS

STORAGE

ROOM

BREAK

HR HR

CG

CG

CG

HRHR

HRHRHRHRHRHR

m x v1 mx11 m x

JOHN HAAS

SAJAN MAHAJAN

GREGORY PETERS

#8#7

BLDG.

BLDG.

FE

FE

FE

FE

FE

A

B

C

D

E

F G

H

J

K

L

M

N

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2421 25

4 27/64"

EXIST STAIR

EXIST PROC

RM

EXIST

HOLDING

EXIST

HOLDING

EXIST

HOLDING

EXIST

HOLDING

EXIST

HOLDING

EXIST

EQUIP

EXIST CT

SCAN

EXIST

CNTRL2105

EXIST TLT

EXIST TLT

EXIST

STORAGE 2090

EXIST

LOBBY

2090A

FUTURE

MECHANICAL

FUTURE AHU

FUTURE AHU

DEMOLITION

FLOOR

HAZARDOUS

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE

WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY

ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN

THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO PROCEEDING WITH

REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL BE

VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS SHALL

PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR SCHEDULED

FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH TRADES

WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING BEHIND

ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE RESISTIVE

RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE RATING

INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT THE DECK

ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE SEALED WITH FIRE

CAULK.

15. FIRST FLOOR ELEVATION 234'-6" AS SHOWN ON ARCHITECTURE DRAWINGS WAS OBTAINED FROM

ORIGINAL BUILDING ASBUILTS PROVIDED BY THE OWNER AND WAS DERIVED FROM AN UNKNOWN

DATUM. ARCH FIRST FLOOR ELEVATION 234'-6" = EXISTING BUILDING FIRST FLOOR ELEVATION NOTED ON THE CIVIL DRAWINGS AS 235'-0", A RECENTLY SURVEYED ELEVATION BY THE DESIGN TEAM. THE INTENT OF THIS PROJECT IS FOR THE NEW T/O SLAB ELEVATIONS AT EACH FLOOR LEVEL TO MATCH THE ELEVATION OF THE EXISTING FLOOR IN THE EXISTING BUILDING. CONTRACTOR MUST VERIFY AND COORDINATE ACTUAL EXISTING FLOOR-TO-FLOOR ELEVATIONS AND ALIGN NEW FLOORS TO EXISTING.

16. REFER TO SHEET SERIES GC100-GC118 FOR INFECTION CONTROL AND RISK ASSESSMENT

CONSTRUCTION PLANS BY FLOOR LEVEL.

17. REFER TO SHEET SERIES GI010-GI018 FOR LIFE SAFETY AND CODE SUMMARY INFORMATION BY

FLOOR LEVEL.

18. REFER TO SHEET SERIES HA### FOR HAZARDOUS MATERIAL IDENTIFICATION AND ABATEMENT PLANS.

19. BLAST-RESISTANT DESIGN REQUIREMENTS ARE PROVIDED IN SPECIFICATION 044200 FOR EXTERIOR STONE CLADDING, 074213 METAL WALL PANELS, 034500 PRECAST ARCHITECTURAL CONCRETE, AND

089000 LOUVERS AND VENTS.

20. REFER TO SPECIFICATION SECTION 09 06 09 COLOR SCHEDULE, THE VA OMAHA'S FACILITY SPECIFIC SCHEDULE OF FINISHES, IN ADDITION TO EACH PRODUCT'S RESPECTIVE SPECIFICATION SECTION FOR INFORMATION REGARDING PROJECT BUILDING FINISHES. ROOM SPECIFIC FINISH INFORMATION

CAN BE FOUND ON SHEET GI001.

21. WOOD BLOCKING WITHIN WALL SYSTEM SHALL BE FIRE RETARDANT TREATED. ALL EXTERIOR WOOD BLOCKING SHALL ALSO BE MOISTURE TREATED. WOOD MAY NOT BE USED IN AN EXPOSED LOCATION

UNLESS IT IS A FINISH MATERIAL IN A NON-COMBUSTIBLE ASSEMBLY OR AS SPECIFIED.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG1A

AE2O1

INTERIOR SECTION

REFERENCE TAG1A

KEY NOTE

A NEW GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

A

EXISTING GRIDLINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

AE102

SECOND LEVEL FLOOR PLAN -

OVERALL

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 SECOND LEVEL FLOOR PLAN - OVERALL

M

GRILL

EXAHUST

H P S

H P S

H P S

ERV-

M

ERV-

LPS

LP

S

1 1/4"

2" S

HEAT TRACE

S

HEAT TRACE

EXPANSION TANK

AIR SEPARATOR

W P

S D

S D

OFFICE KITCHEN

CANTEEN

DININGDINING

CANTEEN

CANTEEN

DINING

TLT

OFFICE

OFFICE

CANTEEN

RETAIL

STORE

PICTEL

SITE

JAN ELEC

SHOPCANTEEN

TLT

LIBRARY

OFFICE STORAGE

OFFICE

OFFICE

RESEARCH

OFFICE

OFFICE

MED

MEDIAWORK

ROOM

CONF

ROOM

STORAGE

CONF

ROOM

CREDIT

UNION

OFFICE OFFICE

STOR TLT

OFFICE OFFICE OFFICE

KITCHEN

MECHANICAL

REFRIG

STORAGE

TLT

BREAK

ROOM

STOR

JAN

6 FTE

MODULAR

CASEWORK

MECH

MECH STORAGE

SHOP

PLASTER/MASON

ICU

MECHANICAL

OPEN

OFFICE

CORRIDOR

CONF.

OFFICE

PREP

CARTS

OFFICE

OFFICE

STORAGE

TLT

OFFICE

STORAGE

OFFICE

OFFICE

#6

3754A

3267D

X

X X X

DININGDINING

CANTEENCANTEEN

T

T 3267D

FE FE

FE

FE

FE

A

B

C

D

E

F G

H

J

K

L

M

N

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2421

EXIST ROOF

AREA BELOW

3062B

EXIST STAIR

FUTURE

MECHANICAL

EX

IS

T

FR

EE

ZE

R

EXIST

COOLER

EXISTING

COOLERS

EXIST

FREEZER

CORRIDOR

3062A

EXIST

OFFICE

EXIST TRAY

MAKEUP

EXIST DISH

WASHING

EXIST

STORAGE

EXIST

OFFICE

3062C

EXIST

STORAGE

3062D

EXIST

STORAGE

DEMOLITION

FLOOR

HAZARDOUS

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE

WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY

ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN

THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO PROCEEDING WITH

REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL BE

VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS SHALL

PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR SCHEDULED

FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH TRADES

WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING BEHIND

ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE RESISTIVE

RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE RATING

INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT THE DECK

ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE SEALED WITH FIRE

CAULK.

15. FIRST FLOOR ELEVATION 234'-6" AS SHOWN ON ARCHITECTURE DRAWINGS WAS OBTAINED FROM

ORIGINAL BUILDING ASBUILTS PROVIDED BY THE OWNER AND WAS DERIVED FROM AN UNKNOWN

DATUM. ARCH FIRST FLOOR ELEVATION 234'-6" = EXISTING BUILDING FIRST FLOOR ELEVATION NOTED ON THE CIVIL DRAWINGS AS 235'-0", A RECENTLY SURVEYED ELEVATION BY THE DESIGN TEAM. THE INTENT OF THIS PROJECT IS FOR THE NEW T/O SLAB ELEVATIONS AT EACH FLOOR LEVEL TO MATCH THE ELEVATION OF THE EXISTING FLOOR IN THE EXISTING BUILDING. CONTRACTOR MUST VERIFY AND COORDINATE ACTUAL EXISTING FLOOR-TO-FLOOR ELEVATIONS AND ALIGN NEW FLOORS TO EXISTING.

16. REFER TO SHEET SERIES GC100-GC118 FOR INFECTION CONTROL AND RISK ASSESSMENT

CONSTRUCTION PLANS BY FLOOR LEVEL.

17. REFER TO SHEET SERIES GI010-GI018 FOR LIFE SAFETY AND CODE SUMMARY INFORMATION BY

FLOOR LEVEL.

18. REFER TO SHEET SERIES HA### FOR HAZARDOUS MATERIAL IDENTIFICATION AND ABATEMENT PLANS.

19. BLAST-RESISTANT DESIGN REQUIREMENTS ARE PROVIDED IN SPECIFICATION 044200 FOR EXTERIOR STONE CLADDING, 074213 METAL WALL PANELS, 034500 PRECAST ARCHITECTURAL CONCRETE, AND

089000 LOUVERS AND VENTS.

20. REFER TO SPECIFICATION SECTION 09 06 09 COLOR SCHEDULE, THE VA OMAHA'S FACILITY SPECIFIC SCHEDULE OF FINISHES, IN ADDITION TO EACH PRODUCT'S RESPECTIVE SPECIFICATION SECTION FOR INFORMATION REGARDING PROJECT BUILDING FINISHES. ROOM SPECIFIC FINISH INFORMATION

CAN BE FOUND ON SHEET GI001.

21. WOOD BLOCKING WITHIN WALL SYSTEM SHALL BE FIRE RETARDANT TREATED. ALL EXTERIOR WOOD BLOCKING SHALL ALSO BE MOISTURE TREATED. WOOD MAY NOT BE USED IN AN EXPOSED LOCATION

UNLESS IT IS A FINISH MATERIAL IN A NON-COMBUSTIBLE ASSEMBLY OR AS SPECIFIED.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG1A

AE2O1

INTERIOR SECTION

REFERENCE TAG1A

KEY NOTE

A NEW GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

A

EXISTING GRIDLINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

AE103

THIRD LEVEL FLOOR PLAN -

OVERALL

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 THIRD LEVEL FLOOR PLAN - OVERALL

F

DESKS

STORAGE

STOR

STORMECH

CLST

STOR

TLT

STAFF

DR.S

ATTENDING

OFFICE

ROOM

TEAM

OFFICE

EQUIPMENT

ELEVATOR

STOR

DICTWAITING

OR

#7

SCRUB

OR

#6

OFFICE

OFFICE

OR

#5

SCRUB STOR

OR

#4

STORAGE

ROOM

WORK

OR

#3

SCRUB

STORAGE

STORAGE

OFFICE

ROOM

WORK

ANESTHESIA

OR

#2

SCRUB

STORAGE OR

#1

OFFICE

DE

CONTAM

STORAGE

SPD

STERILE

SPD

CLEAN

STORAGE

WASH

CART

SPD

DIRTY

RESIDENT

OFFICE

OFFICE

FTE

SECTYS

SURGERY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

THORACIC

OFFICE

OFFICE

JAN

STORAGE

PT TREATMENT

ROOM

PROSTHETICS

OFFICE/STORAGE

OFFICE

PT

TREATMENT

ACTIVITY

OTOFFICE

OT

STAFF

FTE

OFFICE OFFICE

ISOLATION

ISOLATION

PACU

ONE

PACU

ONE

PACU

ONE

STOR OFFICE

LOCKER

ROOM

LOCKER

ROOM

STORAGE

PACU

TWO

PACU

TWO

PYXIS

PRE-OPPRE-OP

WORK

ROOM

TOILET

CORRIDOR

PACU

TWO

PACU

TWO

PACU

TWO

4013A 4015

SHAFT

DUCT

A/C

#10#9

#8#7

#5

#4

#3

#2

#1

4337A

42674294A

43034306

4353 4374E

4374F

4374D

4754A

4003 4007

4816A

4816B

4764A

4816 4814

4810A

4775A 4775B

4775B

4787A

4786A4787

4795A

4339 40264013 4019

40294028

4764 4775A4758

47544750

4374G

4374A

4374B

4361A

4374C

4033A

4033C4033B

4035A

4035B

4035C

4035D

40404041

40424216 4214 4213 4212 4211

42104215

4205 4204 4202

FE

FE FE FE

A

B

C

D

E

F G

H

J

K

L

M

N

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

4087A

FUTURE

MECHANICAL

EXIST STAIR

EXIST PACU

ONE

EXIST PACU

ONE

EXIST PACU

ONE

EXIST PACU

ONE

EXIST

CLERK

EXIST JAN

EXIST DIRTY

EXIST TLT4080

EXIST

OFFICE

EXIST

BREAK RM

EXIST

LOBBY

EXIST

PRE-OP

EXIST

OFFICE

DEMOLITION

FLOOR

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE

WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY

ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN

THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO PROCEEDING WITH

REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL BE

VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS SHALL

PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR SCHEDULED

FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH TRADES

WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING BEHIND

ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE RESISTIVE

RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE RATING

INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT THE DECK

ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE SEALED WITH FIRE

CAULK.

15. FIRST FLOOR ELEVATION 234'-6" AS SHOWN ON ARCHITECTURE DRAWINGS WAS OBTAINED FROM

ORIGINAL BUILDING ASBUILTS PROVIDED BY THE OWNER AND WAS DERIVED FROM AN UNKNOWN

DATUM. ARCH FIRST FLOOR ELEVATION 234'-6" = EXISTING BUILDING FIRST FLOOR ELEVATION NOTED ON THE CIVIL DRAWINGS AS 235'-0", A RECENTLY SURVEYED ELEVATION BY THE DESIGN TEAM. THE INTENT OF THIS PROJECT IS FOR THE NEW T/O SLAB ELEVATIONS AT EACH FLOOR LEVEL TO MATCH THE ELEVATION OF THE EXISTING FLOOR IN THE EXISTING BUILDING. CONTRACTOR MUST VERIFY AND COORDINATE ACTUAL EXISTING FLOOR-TO-FLOOR ELEVATIONS AND ALIGN NEW FLOORS TO EXISTING.

16. REFER TO SHEET SERIES GC100-GC118 FOR INFECTION CONTROL AND RISK ASSESSMENT

CONSTRUCTION PLANS BY FLOOR LEVEL.

17. REFER TO SHEET SERIES GI010-GI018 FOR LIFE SAFETY AND CODE SUMMARY INFORMATION BY

FLOOR LEVEL.

18. REFER TO SHEET SERIES HA### FOR HAZARDOUS MATERIAL IDENTIFICATION AND ABATEMENT PLANS.

19. BLAST-RESISTANT DESIGN REQUIREMENTS ARE PROVIDED IN SPECIFICATION 044200 FOR EXTERIOR STONE CLADDING, 074213 METAL WALL PANELS, 034500 PRECAST ARCHITECTURAL CONCRETE, AND

089000 LOUVERS AND VENTS.

20. REFER TO SPECIFICATION SECTION 09 06 09 COLOR SCHEDULE, THE VA OMAHA'S FACILITY SPECIFIC SCHEDULE OF FINISHES, IN ADDITION TO EACH PRODUCT'S RESPECTIVE SPECIFICATION SECTION FOR INFORMATION REGARDING PROJECT BUILDING FINISHES. ROOM SPECIFIC FINISH INFORMATION

CAN BE FOUND ON SHEET GI001.

21. WOOD BLOCKING WITHIN WALL SYSTEM SHALL BE FIRE RETARDANT TREATED. ALL EXTERIOR WOOD BLOCKING SHALL ALSO BE MOISTURE TREATED. WOOD MAY NOT BE USED IN AN EXPOSED LOCATION

UNLESS IT IS A FINISH MATERIAL IN A NON-COMBUSTIBLE ASSEMBLY OR AS SPECIFIED.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG1A

AE2O1

INTERIOR SECTION

REFERENCE TAG1A

KEY NOTE

A NEW GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

A

EXISTING GRIDLINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

AE104

FOURTH LEVEL FLOOR PLAN -

OVERALL

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 FOURTH LEVEL FLOOR PLAN - OVERALL

STATIONPNEUM TUBE

STATION

E

E

E

A

A

A

A

JAN

MECH

BARIATRIC

STORAGE

OFFICEOFFICE

N.S.

OFFICE

OFFICE

PULMONARY

CLASSROOM

SOIL

UTILITY

CLEAN

UTILITY

WOMENS

R.R.

MENS

R.R.

BREAK

ROOM

PROSTHETICS

STORAGE

STOR/SUPPLY

SURGERY

OFFICE

PUL/RESP

OFFICE

PULMONARY

OFFICE

PUL/RESP

CLASSROOM

PUL/

RESP

CLEAN

ROOM

ON

CALL

SLEEP

ROOM

PUL/RESP2

DOCTORS

OFFICE

STORAGE

RESPIRATORY

SECTY

PULMONARY

LAB

WORK

ROOM

STOR

STOR

STORAGE

STORAGE

SLEEP

LAB

SLEEP

CONTROL

PROSTHETICS

SLEEP

DISORDERS

CENTER

SLEEP

LAB

OFFICE

OFFICE

HO

GREY

TEAM

OFFICE

OFFICE STOR

STOR

LOCKER

RESP

STOR

TELE

COMM

RM

OFFICE VISITORS

LOUNGE

STOR

KITCH

SUPPLY

SOILED

STORAGE

PATIENT

ROOM

PATIENT

ROOM

TREATMENT

BED

BED

BED

BED

BED

BED

BED

BED

BED

A/C

DUCT

SHAFT

F .E

.C

LKR

LKR

LKR

NSLKR

LKR

LKR

NS NS

LKR

LKR

LKR

LKRLKR

NS

LKR

LKR

NS

LKR

LKR

NS

LKR

NSNSLKR

NS

LKR

NS

LKR

LKR

NS

NSNS LKRLKR

LKR

NS

F.E.C.

5705A

5704 5706

56005601

5600A

#9 #10

5607 5608

5500 5430

5F700A

54015405

5004 5008

52005110

51045103

51055102

A5418

5011B

5011A

5101 5106

5203 5204

52065207

5002A

A

#8#7

#5

#4

#3

#2

#1

5003AA

5705B

5705C

S

S

S S

S S

S

S

F

S S

FE

A

B

C

D

E

F G

H

J

K

L

M

N

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 242

5012A

FUTURE

MECHANICAL

EXIST

OFFICE

EXIST LKRS

/ BREAK RM

EXIST

CORRIDOR

EXIST

CLEAN

EXIST TLT -

EXIST TLT

EXIST 2 BED

EXIST 2 BED

EXIST 1 BED

EXIST STAIR

DEMOLITION

FLOOR

ALT DEDUCT #1:

OMIT CONSTRUCTION OF THE SEVENTH FLOOR; ROOF LEVEL AT SEVENTH FLOOR.

REFER TO AE208 FOR THE REVISED SCOPE OF WORK APPLICABLE TO THE SEVENTH FLOOR

LEVEL. THE SCOPE OF WORK FOR THE FIFTH AND SIXTH FLOOR REMAINS UNCHANGED. NO

PROJECT SCOPE OF WORK REQUIRED ON THE EIGHTH FLOOR.

ALT DEDUCT #2:

OMIT CONSTRUCTION OF THE SIXTH AND SEVENTH FLOORS; ROOF LEVEL AT SIXTH FLOOR.

REFER TO AE208 FOR THE REVISED SCOPE OF WORK APPLICABLE TO THE SIXTH FLOOR

LEVEL. NO PROJECT SCOPE OF WORK REQUIRED ON THE SEVENTH OR EIGHTH FLOOR.

ALT DEDUCT #3:

OMIT CONSTRUCTION OF THE FIFTH, SIXTH AND SEVENTH FLOORS; ROOF LEVEL AT FIFTH

FLOOR. REFER TO AE208 FOR THE REVISED SCOPE OF WORK APPLICABLE TO THE FIFTH

FLOOR LEVEL. NO PROJECT SCOPE OF WORK REQUIRED ON THE SIXTH, SEVENTH OR EIGHTH

FLOOR.

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE

WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY

ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN

THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO PROCEEDING WITH

REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL BE

VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS SHALL

PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR SCHEDULED

FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH TRADES

WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING BEHIND

ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE RESISTIVE

RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE RATING

INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT THE DECK

ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE SEALED WITH FIRE

CAULK.

15. FIRST FLOOR ELEVATION 234'-6" AS SHOWN ON ARCHITECTURE DRAWINGS WAS OBTAINED FROM

ORIGINAL BUILDING ASBUILTS PROVIDED BY THE OWNER AND WAS DERIVED FROM AN UNKNOWN

DATUM. ARCH FIRST FLOOR ELEVATION 234'-6" = EXISTING BUILDING FIRST FLOOR ELEVATION NOTED ON THE CIVIL DRAWINGS AS 235'-0", A RECENTLY SURVEYED ELEVATION BY THE DESIGN TEAM. THE INTENT OF THIS PROJECT IS FOR THE NEW T/O SLAB ELEVATIONS AT EACH FLOOR LEVEL TO MATCH THE ELEVATION OF THE EXISTING FLOOR IN THE EXISTING BUILDING. CONTRACTOR MUST VERIFY AND COORDINATE ACTUAL EXISTING FLOOR-TO-FLOOR ELEVATIONS AND ALIGN NEW FLOORS TO EXISTING.

16. REFER TO SHEET SERIES GC100-GC118 FOR INFECTION CONTROL AND RISK ASSESSMENT

CONSTRUCTION PLANS BY FLOOR LEVEL.

17. REFER TO SHEET SERIES GI010-GI018 FOR LIFE SAFETY AND CODE SUMMARY INFORMATION BY

FLOOR LEVEL.

18. REFER TO SHEET SERIES HA### FOR HAZARDOUS MATERIAL IDENTIFICATION AND ABATEMENT PLANS.

19. BLAST-RESISTANT DESIGN REQUIREMENTS ARE PROVIDED IN SPECIFICATION 044200 FOR EXTERIOR STONE CLADDING, 074213 METAL WALL PANELS, 034500 PRECAST ARCHITECTURAL CONCRETE, AND

089000 LOUVERS AND VENTS.

20. REFER TO SPECIFICATION SECTION 09 06 09 COLOR SCHEDULE, THE VA OMAHA'S FACILITY SPECIFIC SCHEDULE OF FINISHES, IN ADDITION TO EACH PRODUCT'S RESPECTIVE SPECIFICATION SECTION FOR INFORMATION REGARDING PROJECT BUILDING FINISHES. ROOM SPECIFIC FINISH INFORMATION

CAN BE FOUND ON SHEET GI001.

21. WOOD BLOCKING WITHIN WALL SYSTEM SHALL BE FIRE RETARDANT TREATED. ALL EXTERIOR WOOD BLOCKING SHALL ALSO BE MOISTURE TREATED. WOOD MAY NOT BE USED IN AN EXPOSED LOCATION

UNLESS IT IS A FINISH MATERIAL IN A NON-COMBUSTIBLE ASSEMBLY OR AS SPECIFIED.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG1A

AE2O1

INTERIOR SECTION

REFERENCE TAG1A

KEY NOTE

A NEW GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

A

EXISTING GRIDLINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

AE105

FIFTH LEVEL FLOOR PLAN -

OVERALL

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 FIFTH LEVEL FLOOR PLAN - OVERALL

G G

G

G

G

G

O A

V O

A V

V A

O V

A O

V A

O V

A O

VAO VAO

VAO VAO

VAO VAO

V A

O

V A

O V

A O

V A

O

V A

O

V A

O

V A

O V

A O

VAO

VAO

VAO

VAO

V A

O

VAO

VAO

VAO

NS

NS

LKR

LKR

LKR NS

LKR

NS

LKR

LKR

LKR

NS

LKRLKR

LKR

NS NS

LKR

LKR

LKR

LKR

NS

NSLKR

NS

NS

LKR

LKR

NS

LKRLKR

LKR LKR

NS

LKRNS

LKR

COPIER

ROOM

DUMBWAITER

MECHANICAL

C O

R R

ID

O

R

CORRIDOR

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

SLEEP

ROOM

CREIGHTON

NURSING

CONF

ROOM

SLEEP

ROOM

NEB

NURSING

CONF

ROOM

SLEEP

ROOM

CREIGHTON

ON-CALL

SLEEP

ROOM

OFFICE

MEDICINE

OFFICE

PRCROOM

B

PRCROOM

A

PRCROOM

C

PREPARATION

BSL3

ANTE

ROOM

BSL3

LAB

BSL2

LAB

TLT

ELEC/STOR

OFFICE

MICROSCOPY

STORAGE

CORRIDOR

C O

R R

ID

O

R

STOR

TLT

EMS

MECHANICAL

RECEP WAITING

WRK

RM EXAM

SEU

EXAM

SEU

EXAM

SEU

EXAM

SEU

EXAM

SEU

EXAM

CLEAN

DIRTY

TLT

PSP

OFFICE

NS

CONF

ONCOLOGY

STAFF

WOUND

OSTOMY

A/C

DUCT

SHAFT

EDUCATION

OFFICE

DIETITIANS

VISITORS

LOUNGE

WHITE

TEAM

ROOM

OFFICE

OFFICE MEDS

NS STOR

EMSELEC

S

TO

R

OFFICE

NS

NS

LKR

NS

LKR

NS

LKR

LKR

NS

F

F

F.E.C.F.E.C.

F .E

.C

F .E

.C

F.E.C.

F .E

.C

F.E.C.

6705A

#9

6704 6706

6703 6707

6432 6428

64356500

#10

#1

#2

#3

#4

6003B

64016405

61046103

61056102

6011B

6011A

6011 6100

6101 6106

6203 6204

62066207

6002A

64136417

A

6414A

#8#7

#56420

6705B

6605A

6605B

6606A

6606B

6606C

65056506

6507 6518

6510 6516

6515A

6515B

S

S

S

S

S

F

FE

A

B

C

D

E

F G

H

J

K

L

M

N

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 242 25

6012A

FUTURE

MECHANICAL

EXIST STAIR

EXIST PT

RM

EXIST PT

RM

EXIST PT

RM

EXIST TLT

EXIST

STORAGE6014

EXIST LCKR

EXIST

PHARM

EXIST EXAM

RESPIR FIT

TESTING

EXIST

SOCIAL

WRK

EXIST

CORRIDOR

DEMOLITION

FLOOR

ALT DEDUCT #1:

OMIT CONSTRUCTION OF THE SEVENTH FLOOR; ROOF LEVEL AT SEVENTH FLOOR.

REFER TO AE208 FOR THE REVISED SCOPE OF WORK APPLICABLE TO THE SEVENTH FLOOR

LEVEL. THE SCOPE OF WORK FOR THE FIFTH AND SIXTH FLOOR REMAINS UNCHANGED. NO

PROJECT SCOPE OF WORK REQUIRED ON THE EIGHTH FLOOR.

ALT DEDUCT #2:

OMIT CONSTRUCTION OF THE SIXTH AND SEVENTH FLOORS; ROOF LEVEL AT SIXTH FLOOR.

REFER TO AE208 FOR THE REVISED SCOPE OF WORK APPLICABLE TO THE SIXTH FLOOR

LEVEL. NO PROJECT SCOPE OF WORK REQUIRED ON THE SEVENTH OR EIGHTH FLOOR.

ALT DEDUCT #3:

OMIT CONSTRUCTION OF THE FIFTH, SIXTH AND SEVENTH FLOORS; ROOF LEVEL AT FIFTH

FLOOR. REFER TO AE208 FOR THE REVISED SCOPE OF WORK APPLICABLE TO THE FIFTH

FLOOR LEVEL. NO PROJECT SCOPE OF WORK REQUIRED ON THE SIXTH, SEVENTH OR EIGHTH

FLOOR.

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE

WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY

ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN

THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO PROCEEDING WITH

REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL BE

VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS SHALL

PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR SCHEDULED

FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH TRADES

WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING BEHIND

ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE RESISTIVE

RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE RATING

INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT THE DECK

ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE SEALED WITH FIRE

CAULK.

15. FIRST FLOOR ELEVATION 234'-6" AS SHOWN ON ARCHITECTURE DRAWINGS WAS OBTAINED FROM

ORIGINAL BUILDING ASBUILTS PROVIDED BY THE OWNER AND WAS DERIVED FROM AN UNKNOWN

DATUM. ARCH FIRST FLOOR ELEVATION…