Drawing E502 (1 Page).pdf

PDF 363 KB Posted

Attached to
Z1DA--PN: 636-18-303, Construct Air Handling Tower (OM) SDVOSB Set-Aside
Solicitation number
36C26321R0102
Issued by

About this file

This document package includes an electrical drawing and schedule for a federal construction project along with the corresponding solicitation notice. The solicitation is for construction services to build an air handling tower at a Veterans Affairs medical center in Omaha, Nebraska. The project is set aside for service-disabled veteran-owned small businesses. Responses are due based on the solicitation number 36C26321R0102 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. The electrical drawing and schedule provide details on the circuiting and load information to support the construction of the air handling tower.

View the file

Other files

File Type Posted
36C26321R0102 0004.pdf PDF
36C26321R0102 0003.pdf PDF
Electrical Addendum 1 (1 Page).pdf PDF
Prime EMR Information for Responsibility Determination (1 Page).doc DOC document
Questions and Answers (4 Pages).docx DOCX document
Drawing EP108 (1 Page).pdf PDF
Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Site Visit Attendance Roster (1 Page).pdf PDF
Drawing EP100 (1 Page).pdf PDF
36C26321R0102 0002.pdf PDF
36C26321R0102 0001.pdf PDF
Attachment_JA TycoSimplex Redacted 6.23.21 (4 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 7 of 10 Plumb Fire 21.05.28 (27 Pages).pdf PDF
Attachment_Wage Determination Douglas County 4-23-21 (5 Pages).docx DOCX document
Attachment_100_ CD Bid Set Drawings - 1 of 10 Gen 21.05.28 (19 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 10 of 10 Tech 21.05.28 (13 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 5 of 10 Struct 21.05.28 (14 Pages).pdf PDF
Attachment_100_ CD Specs Vol II 21.05.28 (1115 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 3 of 10 Arch 1 21.05.28 (31 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 6 of 10 Mech 21.05.28 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 8 of 10 Elec 1 21.05.28 (35 Pages).pdf PDF
Attachment_Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Attachment_100_ CD Bid Set Drawings - 9 of 10 Elec 2 21.05.28 (9 Pages).pdf PDF
Attachment_Prime EMR Information for Responsibility Determination (1 Pages).doc DOC document
Attachment_Past Performance Questionnaire for Responsibility Determination (3 Pages).doc DOC document
Attachment_JA Snyder Electric Redacted (2 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 2 of 10 Civil Haz 21.05.28 (11 Pages).pdf PDF
Attachment_Design Narrative 5-28-21 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 4 of 10 Arch 2 21.05.28 (3 Pages).pdf PDF
Attachment_JA Coremax Redacted (2 Pages).pdf PDF
Attachment_100_ CD Specs Vol I 21.05.28 (824 Pages).pdf PDF
36C26321R0102_4.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRANCH CIRCUIT WIRING KEY

WIRE

ID 2 WIRE 3 WIRE 4 WIRE

THHW/THWN COPPER

CONDUCTORS

EQUIPMENT

GROUNDING

CONDUCTOR CONDUIT

A# 2#12 3#12 4#12 1#12 3/4"

B# 2#10 3#10 4#10 1#10 3/4"

C# 2#8 3#8 4#8 1#10 3/4"

D# 2#6 3#6 4#6 1#10 1"

E# 2#4 3#4 4#4 1#8 1 1/4"

G# 2#2 3#2 4#2 1#8 1 1/4"

H# 2#1 3#1 4#1 1#6 1 1/2"

J# 2#1/0 3#1/0 4#1/0 1#6 2"

ALL BRANCH CIRCUITS SHALL INCLUDE THE EQUIPMENT GROUND

CONDUCTOR

F# 2#3 3#3 4#3 1#8 1 1/4"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID SET

C R e v it L o c a l F ile s \M

E P

T

.0

-V A

-O m a h a -A

H U

T o w e r_

C z a c h a ry .r

.r o s s .r v t

/2

/2

:3

:5

P

M

E502

ELECTRICAL SCHEDULES NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 RICVED KRISPI15744

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.01

[Key*:]

Total Amps: 61.97 31.54 56.64

Total Load: 7.03 kVA 3.79 kVA 6.4 kVA

-- 59 SPACE -- -- -- 0 0 -- -- -- SPACE 60 --

-- 57 SPACE -- -- -- 0 0 -- -- -- SPACE 58 --

-- 55 SPACE -- -- -- 0 0 -- -- -- SPACE 56 --

-- 53 SPACE -- -- -- 0 0 -- -- -- SPACE 54 --

51 SPARE 20 A 1 -- 0 0 -- -- -- SPACE 52 --

49 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 50

47 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 48

45 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 46

43 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 44

41 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 42

39 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 40

37 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 38

35 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 36

33 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 34

31 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 32

29 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 30

27 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 28

25 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 26

23 SPARE 20 A 1 -- 0 0.57 -- -- -- -- 24 --

21 SPARE 20 A 1 -- 0 0.57 2 20 A SP-1 22

19 AHU-1A-LIGHTS 20 A 1 1 0.68 1 20 A Lighting 20

17 AHU-BA-LIGHTS 20 A 1 1 1 1 20 A AHU-BB-LIGHTS 18

15 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 16

13 SPARE 20 A 1 -- 0 0.83 1 20 A FCU-1 14

11 FCU-1 20 A 1 0.83 1 1 20 A AHU-1B-LIGHTS 12

9 CRS-2 20 A 1 0.67 0.83 1 20 A FCU-1 10

7 CRS-1 20 A 1 1.13 1.13 1 20 A CRS-1 8

5 AHU-1B-HEAT WHEEL 20 A 1 1 1 1 20 A AHU-BB-HEATWHEEL 6

3 RECEPTACLES 20 A 1 0.72 1 1 20 A AHU-1A-HEATWHEEL 4

1 AHU-BA-HEATWHEEL 20 A 1 1 1.26 1 20 A RECEPTACLES 2

CKT

NO. LOAD DESCRIPTION

OVERCURRENT

PROTECTION

AMPS P

WIRE

ID

A B C

WIRE

ID

OVERCURRENT

PROTECTION

P AMPS LOAD DESCRIPTION

CKT

NO.

Panel Notes: ALL WIRING IS 2#12 & 1#12 GND IN 3/4" C. UNLESS OTHERWISE NOTED.

LOCATION: BASEMENT FLOOR DEMAND: 17.21 kVA

SCCR: WIRE: 4

FED FROM: US-2 GROUND BUS PHASE: 3

MOUNTING: SURFACE SOLID NEUTRAL VOLTS: 120/208 Wye

TYPE: BOLT-ON MAIN: 200 A/MLO

PANEL NAME: LB CONNECTED 17.2 kVA

[Key*:]

Total Amps: 44.05 25.37 0

Total Load: 4.88 kVA 2.64 kVA 0 kVA

-- 41 SPACE -- -- -- 0 0 -- -- -- SPACE 42 --

-- 39 SPACE -- -- -- 0 0 -- -- -- SPACE 40 --

-- 37 SPACE -- -- -- 0 0 -- -- -- SPACE 38 --

-- 35 SPACE -- -- -- 0 0 -- -- -- SPACE 36 --

33 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 34

31 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 32

29 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 30

27 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 28

25 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 26

23 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 24

21 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 22

19 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 20

17 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 18

15 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 16

13 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 14

11 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 12

9 Lighting 20 A 1 0.64 10

7 RECEPTACLES 20 A 1 1.44 1.44 1 20 A RECEPTACLES 8

5 FCU-1 20 A 1 0 0 1 20 A FCU-1 6

3 AHU-2B-LIGHTS 20 A 1 1 1 1 20 A AHU-2B-HEATWHEEL 4

1 AHU-2A-LIGHTS 20 A 1 1 1 1 20 A AHU-2A-HEATWHEEL 2

CKT

NO. LOAD DESCRIPTION

OVERCURRENT

PROTECTION

AMPS P

WIRE

ID

A B C

WIRE

ID

OVERCURRENT

PROTECTION

P AMPS LOAD DESCRIPTION

CKT

NO.

Panel Notes: ALL WIRING IS 2#12 & 1#12 GND IN 3/4" C. UNLESS OTHERWISE NOTED.

LOCATION: SECOND FLOOR DEMAND: 7.52 kVA

SCCR: WIRE: 4

FED FROM: US-2 GROUND BUS PHASE: 3

MOUNTING: SURFACE SOLID NEUTRAL VOLTS: 120/208 Wye

TYPE: BOLT-ON MAIN: 200 A/MLO

PANEL NAME: L2 CONNECTED 7.5 kVA

[Key*:]

Total Amps: 31.51 22.61 15

Total Load: 3.66 kVA 2.59 kVA 1.8 kVA

-- 41 SPACE -- -- -- 0 0 -- -- -- SPACE 42 --

-- 39 SPACE -- -- -- 0 0 -- -- -- SPACE 40 --

-- 37 SPACE -- -- -- 0 0 -- -- -- SPACE 38 --

-- 35 SPACE -- -- -- 0 0 -- -- -- SPACE 36 --

33 SPARE 20 A 1 -- 0 0 -- -- -- SPACE 34 --

31 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 32

29 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 30

27 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 28

25 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 26

23 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 24

21 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 22

19 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 20

17 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 18

15 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 16

13 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 14

11 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 12

9 Lighting 20 A 1 0.39 0.2 1 20 A Lighting 10

7 FCU-1 20 A 1 0.83 0.83 1 20 A FCU-1 8

5 RECEPTACLES 20 A 1 0.9 0.9 1 20 A RECEPTACLES 6

3 AHU-3B-LIGHTS 20 A 1 1 1 1 20 A AHU-3B-HEATWHEEL 4

1 AHU-3A-LIGHTS 20 A 1 1 1 1 20 A AHU-3A-HEATWHEEL 2

CKT

NO. LOAD DESCRIPTION

OVERCURRENT

PROTECTION

AMPS P

WIRE

ID

A B C

WIRE

ID

OVERCURRENT

PROTECTION

P AMPS LOAD DESCRIPTION

CKT

NO.

Panel Notes: ALL WIRING IS 2#12 & 1#12 GND IN 3/4" C. UNLESS OTHERWISE NOTED.

LOCATION: THIRD FLOOR DEMAND: 8.05 kVA

SCCR: WIRE: 4

FED FROM: US-2 GROUND BUS PHASE: 3

MOUNTING: SURFACE SOLID NEUTRAL VOLTS: 120/208 Wye

TYPE: BOLT-ON MAIN: 200 A/MLO

PANEL NAME: L3 CONNECTED 8.1 kVA

[Key*:]

Total Amps: 29.4 20.93 16.67

Total Load: 3.46 kVA 2.44 kVA 2 kVA

-- 41 SPACE -- -- -- 0 0 -- -- -- SPACE 42 --

-- 39 SPACE -- -- -- 0 0 -- -- -- SPACE 40 --

-- 37 SPACE -- -- -- 0 0 -- -- -- SPACE 38 --

-- 35 SPACE -- -- -- 0 0 -- -- -- SPACE 36 --

33 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 34

31 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 32

29 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 30

27 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 28

25 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 26

23 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 24

21 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 22

19 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 20

17 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 18

15 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 16

13 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 14

11 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 12

9 Lighting 20 A 1 0.44 0 -- 1 20 A SPARE 10

7 RECEPTACLES 20 A 1 0.9 0.9 1 20 A RECEPTACLES 8

5 AHU-5B-LIGHTS 20 A 1 1 1 1 20 A AHU-5B-HEATWHEEL 6

3 AHU-5A-LIGHTS 20 A 1 1 1 1 20 A AHU-5A-HEATWHEEL 4

1 FCU-1 20 A 1 0.83 0.83 1 20 A FCU-1 2

CKT

NO. LOAD DESCRIPTION

OVERCURRENT

PROTECTION

AMPS P

WIRE

ID

A B C

WIRE

ID

OVERCURRENT

PROTECTION

P AMPS LOAD DESCRIPTION

CKT

NO.

Panel Notes:

LOCATION: FIFTH FLOOR DEMAND: 7.9 kVA

SCCR: WIRE: 4

FED FROM: US-2 GROUND BUS PHASE: 3

MOUNTING: SURFACE SOLID NEUTRAL VOLTS: 120/208 Wye

TYPE: BOLT-ON MAIN: 200 A/MLO

PANEL NAME: L5 CONNECTED 7.9 kVA

[Key*:]

Total Amps: 32.61 20.9 13.83

Total Load: 3.8 kVA 2.39 kVA 1.66 kVA

-- 41 SPACE -- -- -- 0 0 -- -- -- SPACE 42 --

-- 39 SPACE -- -- -- 0 0 -- -- -- SPACE 40 --

-- 37 SPACE -- -- -- 0 0 -- -- -- SPACE 38 --

-- 35 SPACE -- -- -- 0 0 -- -- -- SPACE 36 --

33 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 34

31 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 32

29 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 30

27 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 28

25 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 26

23 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 24

21 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 22

19 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 20

17 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 18

15 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 16

13 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 14

11 SPARE 20 A 1 -- 0 0 -- 1 20 A SPARE 12

9 Lighting 20 A 1 0.39 0 -- 1 20 A SPARE 10

7 RECEPTACLES 20 A 1 0.9 0.9 1 20 A RECEPTACLES 8

5 FCU-1 20 A 1 0.83 0.83 1 20 A Power 6

3 AHU-4B-LIGHTS 20 A 1 1 1 1 20 A AHU-4B-LIGHTS 4

1 AHU-4A-LIGHTS 20 A 1 1 1 1 20 A AHU-4A-HEATWHEEL 2

CKT

NO. LOAD DESCRIPTION

OVERCURRENT

PROTECTION

AMPS P

WIRE

ID

A B C

WIRE

ID

OVERCURRENT

PROTECTION

P AMPS LOAD DESCRIPTION

CKT

NO.

Panel Notes: ALL WIRING IS 2#12 & 1#12 GND IN 3/4" C. UNLESS OTHERWISE NOTED.

LOCATION: FOURTH FLOOR DEMAND: 7.85 kVA

SCCR: WIRE: 4

FED FROM: US-2 GROUND BUS PHASE: 3

MOUNTING: SURFACE SOLID NEUTRAL VOLTS: 120/208 Wye

TYPE: BOLT-ON MAIN: 200 A/MLO

PANEL NAME: L4 CONNECTED 7.9 kVA

[Key*:] H- HANDLE LOCK

Total Amps: 12.06 21.09 11.42

Total Load: 1.44 kVA 2.52 kVA 1.37 kVA

41 42

39 40

37 38

35 36

33 34

31 32

29 30

27 28

25 26

23 24

21 22

19 20

17 18

15 16

13 14

11 12

9 10

7 LIGHTING 20 A 1 0 0.5 1 20 A FACP 8 *H

5 Receptacles 20 A 1 0.54 0.83 1 20 A FCU-1 6

3 RECEPTACLES 20 A 1 1.26 1.26 1 20 A RECEPTACLES 4

1 LIGHTING 20 A 1 0.59 0.35 1 20 A LIGHTING 2

CKT

NO. LOAD DESCRIPTION

OVERCURRENT

PROTECTION

AMPS P

WIRE

ID

A B C

WIRE

ID

OVERCURRENT

PROTECTION

P AMPS LOAD DESCRIPTION

CKT

NO.

Panel Notes:

LOCATION: FUTURE MECHANICAL 1104A DEMAND: 5.33 kVA

SCCR: WIRE: 4

FED FROM: GROUND BUS PHASE: 3

MOUNTING: SURFACE SOLID NEUTRAL VOLTS: 120/208 Wye

TYPE: BOLT-ON MAIN: 200 A/MLO

PANEL NAME: L1 CONNECTED 5.3 kVA

Revisions: Date:

Revised for Addendum 7/27/2021

Sheets
E502 - ELECTRICAL SCHEDULES
EP100 - BASEMENT PLAN - POWER
EP108 - EIGHTH LEVEL FLOOR PLAN - POWER

File details come from the government source that posted it. Updated .