36C26321R0102 0001.pdf

PDF 85 KB Posted

Attached to
Z1DA--PN: 636-18-303, Construct Air Handling Tower (OM) SDVOSB Set-Aside
Solicitation number
36C26321R0102
Issued by

About this file

This amendment to solicitation 36C26321R0102 provides answers to questions from potential offerors. The solicitation is for the construction of an air handling tower at a Department of Veterans Affairs medical facility. It is a lowest price technically acceptable small business set-aside awarded by VA Network Contracting Office 23. Offerors must meet standards for relevant experience on similar mechanical and cooling tower projects, with a minimum of three examples. Submitted past performance will be rated only as acceptable or unacceptable. The response deadline has not changed from the original solicitation.

View the file

Other files

File Type Posted
36C26321R0102 0004.pdf PDF
36C26321R0102 0003.pdf PDF
Electrical Addendum 1 (1 Page).pdf PDF
Prime EMR Information for Responsibility Determination (1 Page).doc DOC document
Questions and Answers (4 Pages).docx DOCX document
Drawing EP108 (1 Page).pdf PDF
Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Site Visit Attendance Roster (1 Page).pdf PDF
Drawing EP100 (1 Page).pdf PDF
Drawing E502 (1 Page).pdf PDF
36C26321R0102 0002.pdf PDF
Attachment_JA TycoSimplex Redacted 6.23.21 (4 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 7 of 10 Plumb Fire 21.05.28 (27 Pages).pdf PDF
Attachment_Wage Determination Douglas County 4-23-21 (5 Pages).docx DOCX document
Attachment_100_ CD Bid Set Drawings - 1 of 10 Gen 21.05.28 (19 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 10 of 10 Tech 21.05.28 (13 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 5 of 10 Struct 21.05.28 (14 Pages).pdf PDF
Attachment_100_ CD Specs Vol II 21.05.28 (1115 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 3 of 10 Arch 1 21.05.28 (31 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 6 of 10 Mech 21.05.28 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 8 of 10 Elec 1 21.05.28 (35 Pages).pdf PDF
Attachment_Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Attachment_100_ CD Bid Set Drawings - 9 of 10 Elec 2 21.05.28 (9 Pages).pdf PDF
Attachment_Prime EMR Information for Responsibility Determination (1 Pages).doc DOC document
Attachment_Past Performance Questionnaire for Responsibility Determination (3 Pages).doc DOC document
Attachment_JA Snyder Electric Redacted (2 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 2 of 10 Civil Haz 21.05.28 (11 Pages).pdf PDF
Attachment_Design Narrative 5-28-21 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 4 of 10 Arch 2 21.05.28 (3 Pages).pdf PDF
Attachment_JA Coremax Redacted (2 Pages).pdf PDF
Attachment_100_ CD Specs Vol I 21.05.28 (824 Pages).pdf PDF
36C26321R0102_4.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0001 636-21-4-5998-0001 636-21-4-5998-0006

636-18-303

36C263

Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077

36C263

Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077

To all Offerors/Bidders

36C26321R0102

06-25-2021

X

X X

636-3610162-5998-854200-3220 23NR0WA06

The purpose of this amendment is to answer questions received in response to this solicitation. See below for questions and answers:

Question 1: The solicitation documents reference the proposal evaluation is based on both the Best Value and Low Price Technically Acceptable FAR criteria. These two FAR clauses carry different evaluation criteria. Please clarify which FAR clause the proposal will evaluate under.

Answer 1: Best Value Source Selection types include (a) Trade-Offs and (b) Lowest Price Technically Acceptable (LPTA) methodologies. In this solicitation, the type of source selection method used is the LPTA method, utilizing the evaluation factors described under paragraph 7 on pages 7-9 of this solicitation.

Gregg R. Sutcliffe

VA-VHA-2019-BB2D4962

PAGE NO.

CONTRACT NO. ORDER NO. MODIFICATION NO.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)

STANDARD FORM 30 (CONTINUATION)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTINUATION PAGE

Question 2: Will the Government prefer past performance example projects that are focused on mechanical or cooling tower related projects?

Answer 2: The Government assumes the question is referring to relevant experience, not past performance. The Government defines Factor 1 - Relevant Experience of the Prime Contractor - on page 8 of this solicitation. Please refer to it in determining which projects you submit to meet this factor.

Question 3: Will the Government accept past performance example projects in occupied facilities that are not medical related but owned by a Government entity?

Answer 3: The Government assumes the question is referring to relevant experience, not past performance. Factor 1 - Relevant Experience of the Prime Contractor - is defined on page 8 of this solicitation. To be found technically acceptable, an offeror must submit a minimum of three recent and relevant projects as defined in the solicitation.

Question 4: Can VA confirm that this project is Lowest Price Technically Acceptable (LPTA) and not a Best Value evaluation?

Answer 4: See answer #1 above.

Question 5: Will past performance be ranked as acceptable or unacceptable only or are there other degrees of ranking?

If so, what are those degrees of ranking?

Answer 5: Factor 1 - Relevant Experience of the Prime Contractor - will be rated as either acceptable or unacceptable.

Prime contractor past performance ratings will only be considered by the Contracting Officer while completing the Determination of Contractor's Responsibility.