Drawing EP108 (1 Page).pdf

PDF 403 KB Posted

Attached to
Z1DA--PN: 636-18-303, Construct Air Handling Tower (OM) SDVOSB Set-Aside
Solicitation number
36C26321R0102
Issued by

About this file

This document package includes a drawing file and related federal contract opportunity. The drawing file contains architectural plans for an eighth level floor of a building, including existing and proposed layouts.

The related federal contract opportunity is a solicitation notice seeking bids to construct an air handling tower at the Omaha VA Medical Center. The solicitation is set aside for service-disabled veteran-owned small businesses. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23 is the contracting agency. Bids are due by the date specified in the solicitation attachments. The award will be made following evaluation of bids received by the deadline. The construction work includes work at the eighth floor level as shown in the architectural drawings.

View the file

Other files

File Type Posted
36C26321R0102 0004.pdf PDF
36C26321R0102 0003.pdf PDF
Electrical Addendum 1 (1 Page).pdf PDF
Prime EMR Information for Responsibility Determination (1 Page).doc DOC document
Questions and Answers (4 Pages).docx DOCX document
Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Site Visit Attendance Roster (1 Page).pdf PDF
Drawing EP100 (1 Page).pdf PDF
Drawing E502 (1 Page).pdf PDF
36C26321R0102 0002.pdf PDF
36C26321R0102 0001.pdf PDF
Attachment_JA TycoSimplex Redacted 6.23.21 (4 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 7 of 10 Plumb Fire 21.05.28 (27 Pages).pdf PDF
Attachment_Wage Determination Douglas County 4-23-21 (5 Pages).docx DOCX document
Attachment_100_ CD Bid Set Drawings - 1 of 10 Gen 21.05.28 (19 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 10 of 10 Tech 21.05.28 (13 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 5 of 10 Struct 21.05.28 (14 Pages).pdf PDF
Attachment_100_ CD Specs Vol II 21.05.28 (1115 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 3 of 10 Arch 1 21.05.28 (31 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 6 of 10 Mech 21.05.28 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 8 of 10 Elec 1 21.05.28 (35 Pages).pdf PDF
Attachment_Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Attachment_100_ CD Bid Set Drawings - 9 of 10 Elec 2 21.05.28 (9 Pages).pdf PDF
Attachment_Prime EMR Information for Responsibility Determination (1 Pages).doc DOC document
Attachment_Past Performance Questionnaire for Responsibility Determination (3 Pages).doc DOC document
Attachment_JA Snyder Electric Redacted (2 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 2 of 10 Civil Haz 21.05.28 (11 Pages).pdf PDF
Attachment_Design Narrative 5-28-21 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 4 of 10 Arch 2 21.05.28 (3 Pages).pdf PDF
Attachment_JA Coremax Redacted (2 Pages).pdf PDF
Attachment_100_ CD Specs Vol I 21.05.28 (824 Pages).pdf PDF
36C26321R0102_4.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EYE

WASH

OAV

OAV

A

EF-??

A/C DUCT

STOR

#7 #8

DOWN

UU

FE

E

E

E

E

H

J

K

L

M

N

14 15 16 17 18 19

27 28 30 3226

O

P

Q

M.2

L.2

K.6

29 31

1-77' 2-77'

C-77'

B-77'

A-77'

EXIST STAIR

EXIST GI PROCED

EXIST GI PROCED

EXIST BREAK RM

EXIST SPD STORAGE

EXIST STOR

EXIST WAIT

EXIST KITCHEN

EXIST OP NUTRITION OFFICE

EXIST OFFICE

EXIST LOBBY

EXIST PATIENT SAFETY

EXIST NURSING OFF

EXIST SCOPE CLEAN

8C305

(TYPICAL)

(TYPICAL)

(TYPICAL)

H

J

K

L

M

N

14 15 16 17 18 19

27 28 30 3226

O

P

Q

M.2

L.2

K.6

29 31

1-77' 2-77'

C-77'

B-77'

A-77'

EBB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID SET

C R e v it L o c a l F ile s \M

E P

T

.0

-V A

-O m a h a -A

H U

T o w e r_

C z a c h a ry .r

.r o s s .r v t

/2

/2

:3

:5

P

M

EP108

EIGHTH LEVEL FLOOR PLAN -

POWER

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 RICVED KRISPI15744

N O R

HT

1/8" = 1'-0"

EIGHTH LEVEL FLOOR PLAN - POWER

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.01

N O R

HT

1/8" = 1'-0"

EIGHTH LEVEL FLOOR DEMOLITION - POWER

KEYNOTES:

1. REMOVE AND RELOCATE EXISTING DEVICES IN

THIS AREA AS REQUIRED TO ACCOMMODATE

NEW CONSTRUCTION. RECONNECT DEVICES

TO EXISTING CIRCUIT.

2. REFER TO 1/E302 FOR ADHESIVE AIR TERMINAL

DETAIL.

3. REFER TO 4/E302 FOR PARAPET AIR TERMINAL

DETAIL.

4. REFER TO 3/E302 FOR TYPICAL BONDING

DETAIL OF METAL BODIES.

5. DOWN CONDUCTORS ARE TO BE ROUTED

THROUGH STEEL COLUMNS AND NOT DOWN

THE EXTERIOR OF THE BUILDING. REFER TO

3/E302 FOR TYPICAL ROOF PENETRATION AND

COLUMNCONNECTOR GROUND DETAIL.

SHEET NOTES:

1. ALT DEDUCT #1: OMIT CONSTRUCTION OF THE

SEVENTH FLOOR; ROOF LEVEL AT SEVENTH

FLOOR. REFER TO AE207 FOR THE REVISED

SCOPE OF WORK APPLICABLE TO THE

SEVENTH FLOOR LEVEL. NO PROJECT SCOPE

REQUIRED AT EIGHTH FLOOR.

2. ALT DEDUCT #2: OMIT CONSTRUCTION OF THE

SIXTH AND SEVENTH FLOORS; ROOF LEVEL AT

SIXTH FLOOR. REFER TO AE207 FOR THE

REVISED SCOPE OF WORK APPLICABLE TO

THE SIXTH FLOOR LEVEL. NO PROJECT SCOPE

OF WORK REQUIRED ON THE SEVENTH OR

EIGHTH FLOOR.

Revisions: Date:

Revised for Addendum 7/27/2021

Sheets
E502 - ELECTRICAL SCHEDULES
EP100 - BASEMENT PLAN - POWER
EP108 - EIGHTH LEVEL FLOOR PLAN - POWER

File details come from the government source that posted it. Updated .