Attachment_100_ CD Bid Set Drawings - 1 of 10 Gen 21.05.28 (19 Pages).pdf

PDF 7 MB Posted

Attached to
Z1DA--PN: 636-18-303, Construct Air Handling Tower (OM) SDVOSB Set-Aside
Solicitation number
36C26321R0102
Issued by

About this file

This solicitation notice is for contract 36C26321R0102 to construct an air handling tower at the Omaha VA Medical Center. The solicitation is a set-aside for service-disabled veteran-owned small businesses. The Department of Veterans Affairs Veterans Health Administration VISN 23 is the contracting agency. The solicitation seeks construction services to build an eight level addition including a basement through the seventh floor. The addition will house two air handling units per floor to supply air to each floor. The scope also includes demolition of an existing one-story metal building in the new building footprint. The selected contractor must complete the air handling tower construction. No other details were provided in the solicitation notice attachment.

View the file

Other files

File Type Posted
36C26321R0102 0004.pdf PDF
36C26321R0102 0003.pdf PDF
Electrical Addendum 1 (1 Page).pdf PDF
Prime EMR Information for Responsibility Determination (1 Page).doc DOC document
Questions and Answers (4 Pages).docx DOCX document
Drawing EP108 (1 Page).pdf PDF
Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Site Visit Attendance Roster (1 Page).pdf PDF
Drawing EP100 (1 Page).pdf PDF
Drawing E502 (1 Page).pdf PDF
36C26321R0102 0002.pdf PDF
36C26321R0102 0001.pdf PDF
Attachment_JA TycoSimplex Redacted 6.23.21 (4 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 7 of 10 Plumb Fire 21.05.28 (27 Pages).pdf PDF
Attachment_Wage Determination Douglas County 4-23-21 (5 Pages).docx DOCX document
Attachment_100_ CD Bid Set Drawings - 10 of 10 Tech 21.05.28 (13 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 5 of 10 Struct 21.05.28 (14 Pages).pdf PDF
Attachment_100_ CD Specs Vol II 21.05.28 (1115 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 3 of 10 Arch 1 21.05.28 (31 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 6 of 10 Mech 21.05.28 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 8 of 10 Elec 1 21.05.28 (35 Pages).pdf PDF
Attachment_Prime Contractor Information for Responsibility Determination (1 Page).doc DOC document
Attachment_100_ CD Bid Set Drawings - 9 of 10 Elec 2 21.05.28 (9 Pages).pdf PDF
Attachment_Prime EMR Information for Responsibility Determination (1 Pages).doc DOC document
Attachment_Past Performance Questionnaire for Responsibility Determination (3 Pages).doc DOC document
Attachment_JA Snyder Electric Redacted (2 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 2 of 10 Civil Haz 21.05.28 (11 Pages).pdf PDF
Attachment_Design Narrative 5-28-21 (20 Pages).pdf PDF
Attachment_100_ CD Bid Set Drawings - 4 of 10 Arch 2 21.05.28 (3 Pages).pdf PDF
Attachment_JA Coremax Redacted (2 Pages).pdf PDF
Attachment_100_ CD Specs Vol I 21.05.28 (824 Pages).pdf PDF
36C26321R0102_4.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseCONSULTANT

321 4 5 6 7 8 9 10

PROJECT NAME:

SITE ADDRESS:

VA PROJECT NUMBER:

OWNER AND CONSULTANTS:

VICINITY MAP:

ARCHITECT/ENGINEER OF RECORD

BID SET

GI000

COVER SHEET NWIHCS - CONSTRUCT AIR

HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

636-18-303

VA COR:

CONTACT:

ADDRESS:

PHONE:

AMANDA HOMAN

4101 WOOLWORTH AVE

OMAHA, NE 68105

(402) 995-5971

MECHANICAL/PLUMBING/FIRE PROTECTION ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

ERIC HENDERSON

PHONE: 630-717-2433

ARCHITECT AND COORDINATING PROFESSIONAL:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

THOMAS OLESAK

PHONE: 763-412-4000

CIVIL ENGINEER:

NAME:

ADDRESS:

CONTACT: MIKE BRANDVOLD

PHONE: 763-412-4000

ELECTRICAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

KRISTEN SPINA

PHONE: 515-639-3041

TECHNOLOGY ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

DAMON DEEN

PHONE: 515-334-4329

STRUCTURAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

ALEX CARNAHAN

PHONE: 515-334-7936

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

Revisions: Date:

SHEET ABBREVIATION AND NUMBERING

AE 1 1 1 - 01

DI

SC

IP

LIN

E

DE

SI

GN

AT

OR

SH

EE

T T

YP

E

DE

SI

GN

AT

OR

FL

OO

R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

ZO

NE

N

UM

BE

R

AE 111-01

ARCHITECTURAL ELEMENTS, PLAN, FIRST LEVEL, FLOOR PLAN, ZONE 1

QH 1 1 0 - 01

DI

SC

IP

LIN

E

DE

SI

GN

AT

OR

SH

EE

T T

YP

E

DE

SI

GN

AT

OR

FL

OO

R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

ZO

NE

N

UM

BE

R

QH110-01

EQUIPMENT HOSPITAL, PLAN, FIRST LEVEL, ZONE 1

DISCIPLINE

DESIGNATOR

SHEET TYPE

DESIGNATOR

FLOOR

LEVEL

SHEET

GROUPING

GC - GENERAL CONTRACT

GI - GENERAL INFORMATION

AC - ARCHITECTURAL RCP

AD - ARCHITECTURAL DEMOLITION

AS - ARCHITECTURAL SITE

AE - ARCHITECTURAL ELEMENTS

AF - ARCHITECTURAL FINISHES

IF - INTERIOR FURNISHINGS

QC - EQUIPMENT LAUNDRY

QF - EQUIPMENT FOOD SERVICE

QH - EQUIPMENT HOSPITAL

QL - EQUIPMENT LABORATORY

0 - GENERAL

1 - PLANS

2 - ELEVATIONS

3 - SECTIONS

4 - LARGE SCALE VIEWS

5 - DETAILS

6 - SCHEDULES & DIAGRAMS

0 - LOWER LEVEL

1 - FIRST LEVEL

2 - SECOND LEVEL

3 - THIRD LEVEL

4 - FOURTH LEVEL

GENERAL:

00-10 - TITLE SHEET, NOTES,

ABBREVIATIONS, SYMBOLS,

SCHEDULES

PLANS:

1 - LEVEL FLOOR PLAN

2 - DIMENSION PLAN

ELEVATIONS:

01-10 - EXTERIOR ELEVATIONS

11-19 - INTERIOR ELEVATION

SECTIONS:

01-10 - BUILDING SECTIONS

11-19 - WALL SECTIONS

20-29 - STAIR SECTIONS & PLANS

DETAILS:

01-19 - EXTERIOR PLAN DETAILS

20-29 - EXTERIOR SECTION DETAILS

30-39 - ROOF DETAILS

40-49 - INTERIOR PLAN DETAILS

50-59 - INTERIOR SECTION DETAILS

60-69 - CEILING DETAILS

PLANS ONLY

AE 5 1 2

DI

SC

IP

LIN

E

DE

SI

GN

AT

OR

SH

EE

T T

YP

E

DE

SI

GN

AT

OR

SH

EE

T G

RO

UP

IN

G

AE 501

ARCHITECTURAL ELEMENTS, EXTERIOR PLAN DETAILS

AF 6 7 0

DI

SC

IP

LIN

E

DE

SI

GN

AT

OR

SH

EE

T T

YP

E

DE

SI

GN

AT

OR

SH

EE

T G

RO

UP

IN

G

AF 670

ARCHITECTURAL FINISHES, FINISH SCHEDULE

1. REFER TO 09 06 09 COLOR SCHEDULE FOR SPECIFIC PRODUCT SELECTION BASIS OF DESIGN AND

OTHER REQUIREMENTS.

2. FIELD FINISH VENTS, GRILLES, ACCESS PANELS, PLUG STRIP, BASEBOARD RADIATION ENCLOSURES, ELECTRICAL PANEL BOARDS (IN FINISHED SPACES) TO MATCH SURFACE ON WHICH THEY OCCUR UNLESS OTHERWISE INDICATED. EXCEPTION: ITEMS WITH FACTORY WHITE FINISH, OCCURRING IN WHITE ACT OR WHITE GYPSUM BOARD CEILING SHALL NOT BE PAINTED. STAINLESS STEEL ITEMS

SHALL NOT BE PAINTED

3. FIELD VERIFY ALL EXISTING CONDITIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO

INSTALLATION

4. LOCATE CHANGES IN FLOOR FINISH MATERIAL UNDER CENTERLINE OF CLOSED DOOR UNLESS

OTHERWISE INDICATED

5. PROVIDE CLEAR SILICONE SEALANT AT PERIMETER OF PLUMBING FLOOR DRAINS, CLEAN OUTS, ETC IN RESILIENT AND CERAMIC TILE FLOORS

6. PROVIDE CLEAR SILICONE SEALANT AT THE BASE OF DOOR FRAME TO RESILIENT AND CT

FLOORING, TYP. SEE PLANS AND ROOM FINISH SCHEDULE FOR FLOOR FINISH LOCATIONS

7. HOLLOW METAL DOORS AND FRAMES TO BE PAINTED P-2, UNLESS NOTED OTHERWISE IN THE

ROOM OPENING SCHEDULE

8. WOOD: PRE-FINISHED TO MATCH BUILDING STANDARD, REFER TO SPECIFICATION

9. CEILING HEIGHTS AND MATERIALS/FINISHES CALLED OUT IN ROOM FINISH SCHEDULE ARE FOR ENTIRE CEILING OR MAJORITY OF THAT ROOM, UNLESS OTHERWISE INDICATED. SEE REFLECTED

CEILING PLAN FOR CHANGES IN CEILING MATERIAL AND CEILING HEIGHT.

10. COLOR SELECTIONS ARE BASED ON USE OF PRODUCTS INDICATED IN THE COLOR SCHEDULE. IF

MANUFACTURERS OTHER THAN THOSE INDICATED ARE USED, ARCHITECT MAY REVISE COLOR

SELECTIONS OF OTHER FINISHES TO ENSURE PROPER COORDINATION

11. CEILING HEIGHTS ARE MEASURED FROM FINISH FLOOR

12. SEE PLAN KEYNOTES FOR ADDITIONAL FINISH INFORMATION

ROOM FINISH GENERAL NOTES

- UNFINISHED

ACT ACOUSTICAL CEILING (TILE)

CSF-ND CONCRETE FLOOR SEALER - NORMAL DUTY

CT CERAMIC TILE

CPT CARPET TILE

ES EDGE STRIPS

FRP FIBERGLASS REINFORCED PANELING

LVT LUXURY VINYL TILE

MAT-1 WALK - OFF MAT

P PAINT

PT PORCELAIN TILE (FLOOR AND BASE)

PTM PATCH TO MATCH EXISTING

RB RESILIENT BASE

RES RESINOUS EPOXY FLOORING

RF RUBBER FLOORING

RWG RIGID WALL GUARD

S SOLID SURFACE

SC SPECIAL COATING

SP SPECIAL FACED

SV SHEET VINYL

WD WOOD

ROOM FINISH LEGEND &

ABBREVIATIONS

KEYNOTECORNER GUARD

WALL

PROTECTION

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

CG

VCTCPT

AF10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

GI001

SHEET INDEX & ROOM FINISH

SCHEDULE

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

ROOM FINISH SCHEDULE

NO. ROOM NAME FLOOR BASE

WALLS

CEILING REMARKSNORTH EAST SOUTH WEST

1104A FUTURE MECHANICAL CSF-ND RB-1 SEE REMARKS SEE REMARKS SEE REMARKS SEE REMARKS - ALL GYP BD WALLS TO RECIEVE P-1A & RB-1. PRECAST WALLS TO REMAIN UNFINISHED.

1104B CORRIDOR MAT-1 RB-1 RWG-1/P-1A RWG-1/P-1A RWG-1/P-1A RWG-1/P-1A AT-1 RWG FROM TOP OF WALL BASE TO CHAIR RAIL ABOVE. TOP OF CHAIR RAIL AT 4'-0".

2090A FUTURE MECHANICAL CSF-ND RB-1 SEE REMARKS SEE REMARKS SEE REMARKS SEE REMARKS - ALL GYP BD WALLS TO RECIEVE P-1A & RB-1. PRECAST WALLS TO REMAIN UNFINISHED.

3062 CORRIDOR EXIST/PTM EXIST/PTM PTM PTM PTM PTM PTM PATCH TO MATCH EXISTING FINISHES DISTURBED BY CONSTRUCTION 3062C EXIST STORAGE EXIST EXIST/PTM - - - PTM PTM PATCH TO MATCH EXISTING FINISHES DISTURBED BY CONSTRUCTION 3062D EXIST STORAGE EXIST EXIST/PTM PTM PTM - PTM PTM PATCH TO MATCH EXISTING FINISHES DISTURBED BY CONSTRUCTION 3064 FUTURE MECHANICAL CSF-ND RB-1 SEE REMARKS SEE REMARKS SEE REMARKS SEE REMARKS - ALL GYP BD WALLS TO RECIEVE P-1A & RB-1 4087A FUTURE MECHANICAL CSF-ND RB-1 SEE REMARKS SEE REMARKS SEE REMARKS SEE REMARKS - ALL GYP BD WALLS TO RECIEVE P-1A & RB-1 5012A FUTURE MECHANICAL CSF-ND RB-1 SEE REMARKS SEE REMARKS SEE REMARKS SEE REMARKS - ALL GYP BD WALLS TO RECIEVE P-1A & RB-1 6012A FUTURE MECHANICAL CSF-ND RB-1 SEE REMARKS SEE REMARKS SEE REMARKS SEE REMARKS - ALL GYP BD WALLS TO RECIEVE P-1A & RB-1 7012A FUTURE MECHANICAL CSF-ND RB-1 SEE REMARKS SEE REMARKS SEE REMARKS SEE REMARKS - ALL GYP BD WALLS TO RECIEVE P-1A & RB-1 B092 FUTURE MECHANICAL CSF-ND RB-1 SEE REMARKS SEE REMARKS SEE REMARKS SEE REMARKS - ALL GYP BD WALLS TO RECIEVE P-1A & RB-1. PRECAST WALLS TO REMAIN UNFINISHED.

B093 CORRIDOR EXIST/PTM EXIST/PTM PTM PTM PTM PTM EXIST/PTM PATCH TO MATCH EXISTING FINISHES DISTURBED BY CONSTRUCTION, MATCH FINISHES IN ROOM B094

SHEET INDEX - GENERAL

SHEET NO. SHEET TITLE

GI000 COVER SHEET

GI001 SHEET INDEX & ROOM FINISH SCHEDULE

GI002 ABBREVIATIONS

GI010 BASEMENT LEVEL LIFE SAFETY PLAN

GI011 FIRST LEVEL LIFE SAFETY PLAN AND CODE SUMMARY

GI012 SECOND LEVEL LIFE SAFETY PLAN

GI013 THIRD LEVEL LIFE SAFETY PLAN

GI014 FOURTH LEVEL LIFE SAFETY PLAN

GI015 FIFTH LEVEL LIFE SAFETY PLAN

GI016 SIXTH LEVEL LIFE SAFETY PLAN

GI017 SEVENTH LEVEL LIFE SAFETY PLAN

GI018 EIGHTH LEVEL LIFE SAFETY PLAN

GC110 BASEMENT LEVEL ICRA, CONSTRUCTION BARRIER PLAN

GC111 FIRST LEVEL ICRA, CONSTRUCTION BARRIER PLAN

GC112 SECOND LEVEL ICRA, CONSTRUCTION BARRIER PLAN

GC113 THIRD LEVEL ICRA, CONSTRUCTION BARRIER PLAN

GC114 FOURTH AND FIFTH LEVEL ICRA, CONSTRUCTION BARRIER PLAN

GC116 SIXTH AND SEVENTH LEVEL ICRA, CONSTRUCTION BARRIER PLAN

GC118 EIGHTH LEVEL ICRA, CONSTRUCTION BARRIER PLAN

SHEET INDEX - CIVIL

SHEET NO. SHEET TITLE

CL101 ACCESS AND LOGISTICS PLAN

CL102 ACCESS AND LOGISTICS PLAN

CD101 DEMOLITION PLAN

CS101 SITE PLAN

CG101 GRADING AND EROSION CONTROL PLAN

CU101 UTILITY PLAN

C501 DETAILS 1

C502 DETAILS 2

L101 LANDSCAPING PLAN

SHEET INDEX - HAZARDOUS MATERIALS

SHEET NO. SHEET TITLE

HA100 BASEMENT AND SECOND LEVEL HAZ MAT ASBESTOS

HA103 THIRD AND EIGHTH LEVEL HAZ MAT ASBESTOS

SHEET INDEX - ARCHITECTURAL

SHEET NO. SHEET TITLE

AE100 BASEMENT LEVEL FLOOR PLAN - OVERALL

AE101 FIRST LEVEL FLOOR PLAN - OVERALL

AE102 SECOND LEVEL FLOOR PLAN - OVERALL

AE103 THIRD LEVEL FLOOR PLAN - OVERALL

AE104 FOURTH LEVEL FLOOR PLAN - OVERALL

AE105 FIFTH LEVEL FLOOR PLAN - OVERALL

AE106 SIXTH LEVEL FLOOR PLAN - OVERALL

AE107 SEVENTH LEVEL FLOOR PLAN - OVERALL

AE108 EIGHTH LEVEL ROOF PLAN - OVERALL

AE200 BASEMENT LEVEL DEMO AND FLOOR PLAN - PARTIAL

AE201 FIRST LEVEL DEMO AND FLOOR PLAN - PARTIAL

AE202 SECOND LEVEL DEMO AND FLOOR PLAN - PARTIAL

AE203 THIRD LEVEL DEMO AND FLOOR PLAN - PARTIAL

AE204 FOURTH LEVEL DEMO AND FLOOR PLAN - PARTIAL

AE205 FIFTH LEVEL DEMO AND FLOOR PLAN - PARTIAL

AE206 SIXTH LEVEL DEMO AND FLOOR PLAN - PARTIAL

AE207 SEVENTH LEVEL DEMO AND FLOOR PLAN - PARTIAL

AE208 EIGHTH LEVEL DEMO AND FLOOR PLAN (ROOF) - PARTIAL

AC201 FIRST LEVEL REFLECTED CEILING PLAN AND DETAILS

AE230 EXTERIOR ELEVATIONS

AE231 EXTERIOR ELEVATIONS

AE301 BUILDING SECTIONS

AE302 BUILDING SECTIONS

AE311 WALL SECTIONS

AE501 EXTERIOR DETAILS - PRECAST PANELS

AE502 EXTERIOR DETAILS - STONE VENEER AND INSUL MTL PANEL

AE503 DETAILS - MISC

AE510 JOINT PLAN AND SECTION DETAILS

AE520 JOINT SECTION DETAILS

AE530 ROOF DETAILS

AE531 ROOF DETAILS

AE601 CONSTRUCTION TYPES AND DETAILS

AE602 DOOR SCHEDULE AND ELEVATIONS

AW601 WAYFINDING BLDG MESSAGE SCHEDULES & SIGNAGE DETAILS

SHEET INDEX - STRUCTURAL

SHEET NO. SHEET TITLE

S000 GENERAL NOTES

SB010 AUGERED CAST-IN-PLACE PILE PLAN

SB100 FOUNDATION PLAN

SF101 FIRST FLOOR FRAMING PLAN

SF102 SECOND FLOOR FRAMING PLAN

SF103 THIRD FLOOR FRAMING PLAN

SF104 FOURTH - EIGHTH FLOOR (ROOF) FRAMING PLAN

SF200 CONCENTRICALLY BRACED FRAME

SF300 CONCRETE DETAILS

SF301 CONCRETE DETAILS

SF400 STEEL DETAILS

SF401 STEEL DETAILS

SF402 STEEL DETAILS

SF403 STEEL DETAILS

SHEET INDEX - MECHANICAL

SHEET NO SHEET TITLE

M000 MECHANICAL COVERSHEET

MD100 BASEMENT DEMOLITION - MECHANICAL

M100 BASEMENT PLAN - MECHANICAL

MD101 FIRST LEVEL DEMOLITION - MECHANICAL

M101 FIRST LEVEL FLOOR PLAN - MECHANICAL

M102 SECOND LEVEL FLOOR PLAN - MECHANICAL

M103 THIRD LEVEL FLOOR PLAN - MECHANICAL

M104 FOURTH LEVEL FLOOR PLAN - MECHANICAL

M105 FIFTH LEVEL FLOOR PLAN - MECHANICAL

M106 SIXTH LEVEL FLOOR PLAN - MECHANICAL

M107 SEVENTH LEVEL FLOOR PLAN - MECHANICAL

M108 EIGHTH LEVEL FLOOR PLAN - MECHANICAL

M300 MECHANICAL DETAILS

M301 MECHANICAL DETAILS

M302 MECHANICAL ENLARGED PLANS AND DETAILS

M400 CHILLED WATER FLOW DIAGRAM

M401 STEAM AND CONDENSATE FLOW DIAGRAM

M402 HEATING WATER FLOW DIAGRAM

M500 CONTROL DIAGRAMS

M600 MECHANICAL SCHEDULES

SHEET INDEX - FIRE PROTECTION

SHEET NO. SHEET TITLE

F000 FIRE PROTECTION COVERSHEET

FD100 BASEMENT DEMOLITION PLAN - FIRE PROTECTION

F100 BASEMENT FLOOR PLAN - FIRE PROTECTION

FD101 FIRST LEVEL DEMOLITION PLAN - FIRE PROTECTION

F101 FIRST LEVEL FLOOR PLAN - FIRE PROTECTION

F102 SECOND LEVEL FLOOR PLAN - FIRE PROTECTION

F103 THIRD LEVEL FLOOR PLAN - FIRE PROTECTION

F104 FOURTH LEVEL FLOOR PLAN - FIRE PROTECTION

F105 FIFTH LEVEL FLOOR PLAN - FIRE PROTECTION

F106 SIXTH LEVEL FLOOR PLAN - FIRE PROTECTION

F107 SEVENTH LEVEL FLOOR PLAN - FIRE PROTECTION

F108 EIGHTH LEVEL FLOOR PLAN - FIRE PROTECTION

SHEET INDEX - PLUMBING

SHEET NO. SHEET TITLE

P000 PLUMBING COVERSHEET

P10U BASEMENT UNDERFLOOR PLAN - PLUMBING

PD100 BASEMENT DEMOLITION PLAN - PLUMBING

P100 BASEMENT FLOOR PLAN - PLUMBING

PD101 FIRST LEVEL DEMOLITION PLAN - PLUMBING

P101 FIRST LEVEL FLOOR PLAN - PLUMBING

P102 SECOND LEVEL FLOOR PLAN - PLUMBING

P103 THIRD LEVEL FLOOR PLAN - PLUMBING

P104 FOURTH LEVEL FLOOR PLAN - PLUMBING

P105 FIFTH LEVEL FLOOR PLAN - PLUMBING

P106 SIXTH LEVEL FLOOR PLAN - PLUMBING

P107 SEVENTH LEVEL FLOOR PLAN - PLUMBING

P108 EIGHTH LEVEL FLOOR PLAN - PLUMBING

P300 PLUMBING DETAILS

P400 PLUMBING FLOW DIAGRAMS

SHEET INDEX - ELECTRICAL

SHEET NO. SHEET TITLE

E000 ELECTRICAL COVERSHEET

E010 SITE PLAN - ELECTRICAL

ELD100 BASEMENT LEVEL DEMOLITION - LIGHTING

EPD100 BASEMENT LEVEL FLOOR DEMOLITION - POWER

ESD100 BASEMENT LEVEL FLOOR DEMOLITION - SYSTEMS

EL100 BASEMENT FLOOR PLAN - LIGHTING

EP100 BASEMENT PLAN - POWER

ES100 BASEMENT PLAN - SYSTEMS

ELD101 FIRST LEVEL FLOOR DEMOLITION - LIGHTING

EPD101 FIRST LEVEL FLOOR DEMOLITION - POWER

ESD101 FIRST LEVEL FLOOR DEMOLITION - SYSTEMS

EL101 FIRST LEVEL FLOOR PLAN - LIGHTING

EP101 FIRST LEVEL FLOOR PLAN - POWER

ES101 FIRST LEVEL FLOOR PLAN - SYSTEMS

EL102 SECOND LEVEL FLOOR PLAN - LIGHTING

EP102 SECOND LEVEL FLOOR PLAN - POWER

ES102 SECOND LEVEL FLOOR PLAN - SYSTEMS

EL103 THIRD LEVEL FLOOR PLAN - LIGHTING

EP103 THIRD LEVEL FLOOR PLAN - POWER

ES103 THIRD LEVEL FLOOR PLAN - SYSTEMS

EL104 FOURTH LEVEL FLOOR PLAN - LIGHTING

EP104 FOURTH LEVEL FLOOR PLAN - POWER

ES104 FOURTH LEVEL FLOOR PLAN - SYSTEMS

EL105 FIFTH LEVEL FLOOR PLAN - LIGHTING

EP105 FIFTH LEVEL FLOOR PLAN - POWER

ES105 FIFTH LEVEL FLOOR PLAN - SYSTEMS

EL106 SIXTH LEVEL FLOOR PLAN - LIGHTING

EP106 SIXTH LEVEL FLOOR PLAN - POWER

ES106 SIXTH LEVEL FLOOR PLAN - SYSTEMS

EL107 SEVENTH LEVEL FLOOR PLAN - LIGHTING

EP107 SEVENTH LEVEL FLOOR PLAN - POWER

ES107 SEVENTH LEVEL FLOOR PLAN - SYSTEMS

EL108 EIGHTH LEVEL FLOOR PLAN - LIGHTING

EP108 EIGHTH LEVEL FLOOR PLAN - POWER

ES108 EIGHTH LEVEL FLOOR PLAN - SYSTEMS

E300 ELECTRICAL DETAILS

E301 ELECTRICAL DETAILS

E302 ELECTRICAL DETAILS

E400 15KV ELECTRICAL DISTRIBUTION

E401 ELECTRICAL ONE-LINE DIAGRAMS

E402 ELECTRICAL ONE-LINE DIAGRAMS

E500 ELECTRICAL SCHEDULES

E502 ELECTRICAL SCHEDULES

E503 ELECTRICAL SCHEDULES

SHEET INDEX - TECHNOLOGY

SHEET NO. SHEET TITLE

T000 TECHNOLOGY COVERSHEET

T100 BASEMENT PLAN - TECHNOLOGY

TD101 FIRST LEVEL FLOOR DEMOLITION - TECHNOLOGY

T101 FIRST LEVEL FLOOR PLAN - TECHNOLOGY

T102 SECOND LEVEL FLOOR PLAN - TECHNOLOGY

T103 THIRD LEVEL FLOOR PLAN - TECHNOLOGY

T104 FOURTH LEVEL FLOOR PLAN - TECHNOLOGY

T105 FIFTH LEVEL FLOOR PLAN - TECHNOLOGY

T106 SIXTH LEVEL FLOOR PLAN - TECHNOLOGY

T107 SEVENTH LEVEL FLOOR PLAN - TECHNOLOGY

T300 TECHNOLOGY DETAILS & RISERS

T500 TECHNOLOGY SCHEDULES

ARCHITECTURAL ABBREVIATIONS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACC

ACI

ACT

ACS DR

ACS FLR

ACS PNL

ACST

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

ACCESSIBLE

AMERICAN CONCRETE INSTITUTE

ACOUSTICAL CEILING TILE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EFF

EFS

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUE

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CARD READER

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

EFFICIENCY

EXTERIOR FINISH SYSTEM

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRT

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FIRE RETARDANT TREATED

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LT

LT GA

LT SW

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT

LIGHT GAGE

LIGHT SWITCH

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUTLET

OUNCE

PAINT

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PRIVACY CURTAIN TRACK

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERIMETER

PERPENDICULAR

PHARMACY

PHOTOGRAPH

PACKAGE

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE, PURCHASE ORDER

POLYETHYLENE (PLASTIC)

PUSH PLATE

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PORCELAIN TILE OR PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

PNEUMATIC TUBE STATION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARTER

QUANTITY

QUADRANT

QUALITY

RADIUS OR RISER

RETURN AIR

RADIATOR

REINFORCED BRICK MASONRY

RUBBER

RC

RCP

RCVR

RD

REC

RECD

RECPT

RECT

REF

REFR

REG

REINF

REP

REPL

REQ

REQD

RET

REV

RFG

RFI

RFP

RFS

RL

RLG

RM

RM LT

RND

RO

ROW

RS

RSV

RT

RV

RVS

RWL

S

SA

SALV

SAMP

SAN

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRD

SHT

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLDG

SLNT

SM

SMK

SND INS

SPEC

SPKLR

SPKR

SPLY

SPR

SQ

SQ IN

SQ YD

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

STRUCT STL

SUB

SURF

SUSP

SUSP CLG

SW

SWDR

SYM

SYNTH

SYS

REMOTE CONTROL

REFLECTED CEILING PLAN

RECEIVER

ROAD OR ROOF DRAIN

RECESSED

RECEIVED

RECEPTACLE

RECTANGLE

REFERENCE OR REFRIGERATOR

REFRACTORY, REFRIGERATION

REGISTER

REINFORCE

REPAIR

REPLACE

REQUIRE

REQUIRED

RETURN

REVISION

ROOFING

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

ROOF LEADER

RAILING

ROOM

NURSE CALL LIGHT/ROOM LIGHT

ROUND

ROUGH OPENING

RIGHT OF WAY

ROUGH SAWN

RESILIENT SHEET VINYL

RIGHT

ROOF VENT

REVERSE

RAIN WATER LEADER

SOLID SURFACE

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHARPS CONTAINER

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

SHOWER CURTAIN TRACK

SOLID CORE WOOD DOOR

SMOKE DETECTOR/SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

SLIDING

SEALANT

SHEET METAL

SMOKE

SOUND INSULATION

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SINGLE PLY ROOF SYSTEM

SQUARE

SQUARE INCH

SQUARE YARD

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

STRUCTURAL STEEL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&M

TB

TBD

TECH

TEL

TEMP

THERM

THK

THRES

THRU

THRUOUT

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TRANS

TRTD

TS

TSTAT

TV

TYP

U

UC

UGND

UL

ULT

UNFIN

UNO

UPS

UR

UTIL

UV

VAC

VAR

VEH

VENT

VERT

VEST

VFD

VIC

VID

VIF

VNR

VOC

VOL

VR

VTR

W/ W/O

WBL

WC

WD

WDW

WF

WFR

WFS

WH

WHSE

WP

WPM

WR

WS

WSCT

WT

X BRACE

XPS

YD

TREAD OR THERMOSTAT

TIME AND MATERIALS

TOWEL BAR

TACK BOARD

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF ___

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MASONRY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TRANSOM

TREATED

TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

HEAT TRANSFER COEFFICIENT

UNDERCUT

UNDERGROUND

UNDERWRITERS LABORATORIES

ULTIMATE

UNFINISH

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

URINAL

UTILITY

ULTRAVIOLET

VACUUM

VARIES

VEHICLE

VENTILATION

VERTICAL

VESTIBULE

VARIABLE FREQUENCY DRIVE

VICINITY

VIDEO

VERIFY IN FIELD

VENEER

VOLATILE ORGANIC COMPOUND

VOLUME

VAPOR RETARDER

VENT THROUGH ROOF

WITH

WITHOUT

WOOD BLOCKING

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WATERPROOFING

WATERPROOF MEMBRANE

WEATHER RESISTANT

WEATHERSTRIP OR WALL SCONCE

WAINSCOT

WEIGHT OR WINDOW TREATMENT

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

YARD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

GI002

ABBREVIATIONS NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CMRevisions: Date:

B007

B020

B001

#8#7

#5

#4

B075 B069

B069B

B054

B064

B051 B049 B046

B070

B119

B005

B003

B009

UP

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL DISTANCE

EA

EDEXIT EXIT

HORIZONTAL EXIT

EXIT DISCHARGE

EXIT ACCESS

FIRE EXTINGUISHERFE

FIRE EXTINGUISHER

CABINETFEC

LIMITS OF

CONSTRUCTION

HEALTH CARE SUITE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

OCCUPANCY

SEPERATION

SHAFT

ADJACENT SYMBOLS SHOW PARTITION RATING

AND DAMPER REQUIREMENTS

HAZARDOUS USE

ADJACENT SYMBOLS SHOW PARTITION RATING AND DAMPER

REQUIREMENTS. OPENINGS REQUIRE GASKET, CLOSER &

LATCH

EXIT PASSAGEWAY

RATE AS STAIR

ALL OPENINGS TO BE RATED AS STAIR SHAFT

CORRIDOR

WALLS TO LIMIT THE TRANSFER OF SMOKE

ADJUNCT CORRIDOR or PSYCHIATRIC AREA or

CONSTUCTED WITH MIN. 4'-0" CLEAR WITH (PER

CHAPTER 19)

100'-10"

COMMON PATH OF

TRAVEL DISTANCE

B092

FUTURE

MECHANICAL

FUTURE

AHU

FUTURE AHU

B119A

EXIST

9026B

EXIST STO/

PLUMBING

B113

EXIST

LOBBY

B111

EXIST

STORAGE

CANTEEN

B095

EXIST STOR

CANTEEN

B094

EXIST

STORAGE

B079

EXIST

OFFICES

B090

EXIST STOR

BIO HAZ/

INFECT

WASTE

B080

EXIST STAIR

B102

E WOM

B103

E MENS

CO

MMON P

AT

H O

F T

RA

VE

L 9

9' - 2"

EXIT

(EXIST)

EX

IT

(EXIST)

LIM

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIMITS OF CONSTRUCTION

LIM

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIMITS OF CONSTRUCTION

NOTE:

SEE OTHER DISCIPLINE DRAWINGS FOR

SITE SCOPE OF WORK BEYOND

ARCHITECTURAL

EX

IT(EXIST)

OCCUPANCY:

CH. 39 EXISTING BUSINESS

MIXED OCCUPANCY:

USE: CH. 42 STORAGE

(LOW HAZARD). SPACE

TO COMPLY W/

PREDOMINANT OCCUPANCY,

CH. 39 EXISTING BUSINESS.

39.2.4.2 EXIT ACCESS

PERMITS SINGLE EXIT

ACCESS PATH FOR

DISTANCES MEETING THE

CPOT.

39.3.2.1: HAZARDOUS AREAS INCLUDE THOSE

USED FOR GENERAL STORAGE, PROTECT PER 8.7.

8.7.1.2: IN NEW CONSTRUCTION, WHERE

SPRINKLERED, SPACE SHALL BE ENCLOSED BY

SMOKE PARTITIONS.

NOTE: PARTITIONS AROUND FUTURE MECHANICAL

ROOM UPGRADED TO 1 HR FIRE BARRIER RATING

IN EVENT THE VA WANTS TO ALSO USE THE

SPACE AS COMBUSTIBLE STORAGE WITH A

HEALTH CARE OCCUPANCY IN THE FUTURE.

39.3.2.1 - (8.7) (8.4.3.1):

8.4.3.3 DOORS SHALL NOT INCLUDE LOUVERS

8.4.3.5. DOOR TO ROOM TO BE SELF OR

AUTOMATIC-CLOSING.TR

AV

EL

DI

ST

AN

CE

7' -

2"

FE

LIM

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIM

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIMITS OF CONSTRUCTION

EXISTING CONCRETE WALL

CONSTRUCTION AT

BASEMENT LEVEL PROVIDES A

FIRE RATING EXCEEDING THE

2-HOUR FIRE BARRIER RATING

REQUIREMENT FOR A STAIR

ENCLOSURE

EXISTING EXT CIP CONC FOUNDATION

WALL. ANY EXISTING OR NEW

PENETRATIONS THROUGH THIS WALL

REQUIRE A FIRE RATING TO MATCH

THE REQUIRED 3 HOUR RATING FOR

BEARING WALLS

FE

AREA WELL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

GI010

BASEMENT LEVEL LIFE SAFETY

PLAN

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 BASEMENT LEVEL LIFE SAFETY FLOOR PLAN

OFFICE

OFFICE

AUDIOLOGYAUDIOLOGY

WAITING

SMALL

RM

EXAM

EXAM

EXAM

EXAM

SOUND

BOOTH

PNEUM TUBE

STATION

PNEUM TUBE

STATION

EXIT

EXIT

EXIT

EXIT

EXIT

PRNTR

(NIC)

FAX

(NIC)

PRNTR

(NIC)

UNDER

COUNTER

D C

C

H

J

TV

UP

DN

#13 #20

WAITING

WAITING

TELECOM

ELECTRIC

FEMALEMALE

OFFICE

OFFICE

OFFICE

#1

#2

#6 #7 #9

#10 #11 #12

#13 #14 #15

#16 #17 #18

UTIL #19

#3

OFFICE

WAITING

ELECSTOR

1751 1726

1655A

165316521651

164916481647

164516441643

164016391638

16581660

15601566

1434 1430

1436 1428

1442 1422

1446a

1450a

1615C

1505A

18071806

1432A

1620A

15071506

BREAK

ROOM

INFORMATION

WAITING

LOBBY

unisex mens

1352 1354 1356

1369 1368

137313721371

137413751376

1383A

1385A

1385B13841382

14061366A TLT

ELECTRICAL

POWER

DISTRIBUTION

EMERGENCY

GENERATORS

VASCULAR

LAB

VASCULAR

LAB

JANITOR

N.S.

WAITING

OFFICE OFFICE OFFICE

OFFICE

LOUNGE

TLT

OFFICE

STORAGE

JAN

WAITING

INTERVIEW

TLT

OFFICE

OFFICE

EXAM

TELCOM

OVER

HEAD

AUDIO

SUPPLY

AUDIOLOGY

AUDIOLOGY

MECHANICAL

OFFICE

CONF

JAN

VAULT

PHARMACY

OFFICE

CONSULT

COMPOUND

OFFICE

PERC

OFFICEOFFICE OFFICE OFFICE OFFICE

OFFICE

LAB

EXAMEXAMEXAM

EXAM EXAM

EXAM

STORAGE

EXAM

EXAM

LAB

EXAM

R.R.

OFFICE

WORKEXAM

EXAM

WORK

WORK

ROOM

EXAM

#15 EXAM

#6

EXAM

#7

EXAM

#8

EXAM

#13

EXAM

#12

EXAM

#11 EXAM

#10

EXAM

#9

EXAM

#3

EXAM

#4

EXAM

#5

EXAM

#2

EXAM

#1

COORIDOR

TEAM

CENTER

OFFICE

NURSE

STATION NURSE

STATION

CLERICAL/

BUSINESS

COFFEE

TELEPHONE

SW.BD

MENS

TLT

PRAYER

RM

CHECK

IN

STAFF

LOUNGE

OPTHAMOLOGYRM

#10

OPTHAMOLOGYRM

#9

OPTHAMOLOGYRM

#8

OPTHAMOLOGYRM

#1

OPTHAMOLOGYRM

#2

OPTHAMOLOGYRM

#3

OPTHAMOLOGYRM

#4

OPTHAMOLOGYRM

#7

OPTHAMOLOGYRM

#6

OPTHAMOLOGYRM

#5

OPTHAMOLOGY

LASER

ROOM

VASCULAR

PROC

CHECK

IN

SEATING

EXAM

OFFICE

INTERVIEW OFFICE

EXAM

C

EXAM

B

EXAM

A

EXAM

#7

TRIAGE

EXAM

#8

EXAM

#9

EXAM

#10

WAITING

ROOM

RECEPTION

SUPPLY

RM TLT

EXAM

#3

EXAM

#2

EXAM

#1

EXAM

#4

EXAM

#5

EXAM

#6

BREAK

ROOM

TLT

CALL

ROOM

OFFICE/

EXAM

WAIT

OFFICETLTTLT

CLST

DIRTY

UTILITY

UTILITY

OFFICE

OFFICE

POLICETLT

ELEV.

LOBBY

OFFICE

EXAM

#18

EXAM

#17

EXAM

#16

EXAM

#15

EXAM

#14

EXAM

#10

EXAM

#7

EXAM

#8

EXAM

#11

OFFICE

OFFICE

EXAM

#9

EXAM

#12

EXAM

#19

EXAM

#5

EXAM

#4

EXAM

#3

EXAM

#2

EXAM

#1

CONSULT

CHECK

IN/OUT

EXAM

#6

OFFICE

STOREXAM

#20

OFFICE

EXAM

#21

EXAM

#22

EXAM

#23

AGENT

CASHIER

CHECK

IN

LABSTOR

STAFF

TLT

PUBLIC

TLT

DRAW

DRAW

DRAW

DRAW

DRAW

DRAW

FAMILY

TLT

OFFICE

CARE

COORD

TLT

RECEPTIONOFFICE

TRANSITIONAL

CARE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

NOYES

APPLICABLE REGULATIONS

GENERAL TYPE OF PROJECT

NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)

2018 FGI GUIDELINES

2018 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

2018 IBC

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

CODE SUMMARY

New 8 level (Basement through Seventh floor) addition on the south side of Omaha's VA hospital for an air handling tower to house 2 air handling units per floor that will supply air to each floor. Demolition of existing one-story metal building in area of new building footprint. Installation of AHU's and associated ductwork to occur at a later date. Project is designed to accomodate a future vertical expansion to a total 12 story structure to accomodate a total of 24 air handling units.

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (TJC)

CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)

NOYES

UL TESTRATING (HRS)

NOYES

ALLOWABLE

ADDITION

*(ADDITION AREA -

DEMO AREA)EXISTING

ACTUAL

(IBC TABLE 601) / NFPA I (332)

(Section 8.3)

NEW ADDITION

EXISTING

TOTAL

CHANGE OF OCCUPANCY?

FIRE RESISTIVE CORRIDORS?

UNLIMITED

TYPE I-A

SPRINKLERED

EXTERIOR DOORS AND WINDOWS

VERT SHAFTS - CONNECT 4+ STORIES

OTHER (NFPA 101 7.1.3.1 AND 8.6.5)

ROOF-CEILING ASSEMBLIES

FLOOR -CEILING ASSEMBLIES

INTERIOR NON-BEARING WALLS

EXTERIOR NON-BEARING WALLS

EXTERIOR & INTERIOR BEARING WALLS

COLUMNS SUPPORTING MORE THAN ONE FL

SEPARATED OCCUPANCIES?

AREA SEPARATIONS / FIRE WALLS

FIRE BARRIER RATING(S)

SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)

INCIDENTAL USE AREA RATING(S) (EXISTING)

FIRE-RESISTIVE REQUIREMENTS

NFPA 220 TYPE 1(332)

SEE LIFE SAFETY PLANS

SEE PLANS

OCCUPANCY CLASSIFICATION(S)

TYPE(S) OF CONSTRUCTION

ACTUAL AREA PER FLOOR (SF)

OCCUPANCIES

(BY FLOOR)

CONSTRUCTION TYPE(S)

FIRST FLOOR

BLDG 1

BLDG 25

TOTAL

(FEET)

(FEET)

BUILDING HEIGHT AND STORIES (IBC TABLE 504.3 AND 504.4)

MISCELLANEOUS

BASEMENT

BLDG 1

BLDG 19

BLDG 25

BLDG 17

TOTAL

UNLIMITED

2015 LSC (TABLE 6.1.14.1)

SEE LIFE SAFETY PLANS

(IBC TABLE 506.2)

ALLOWABLE AREA PER FLOOR

BASIC ALLOWABLE AREA

See Life Safety Plans

MEANS OF EGRESS CAPACITY - CAPCITY FACTOR OF .2 USED, PER NFPA

101 TABLE 7.3.3.1

EGRESS

EXISTING EGRESS CAPACITY SUFFICIENT TO ACCOMODATE THE INCREASE

IN OCCUPANT LOAD AS NOTED IN THE FOLLOWING CHART.

OCCUPANT LOAD OF BUILDING NFPA 101 TABLE 7.3.1.2

SF/OCCUPANT OCCUPANTS (INCREASE)ACTUAL AREAAREA LOCATION

BASEMENT LEVEL

FIRST LEVEL

SECOND LEVEL

53,202 44,148 97,350

532,414 40,378

4,595

3,671

4,658

500 8

3 Y633, Y634, Y707

U415

0 NA

2 NA

0 NA

INTERIOR FINISHES CLASSIFICATION

I OR II

NOYES

172' - 6 1/2"

89'-9 3/4", FROM T.O. FIRST FL

ACCESSIBLE MEANS OF EGRESS ("MOE") REQUIRED

ELEVATOR REQUIRED AS MEANS OF EGRESS

(LSC CH 12-42)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMNTS H-18-8

NATIONAL ELECTRIC CODE (NEC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITTE AND COMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR

DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN

INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW

FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL

BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS

433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE

GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER

CONSTRUCTION SPECIFICATION

VENTILATION FOR ACCEPTDABLE INDOOR AIR QUALITY - ASHRAE

STANDARD 62.1-2004

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD

15 -2007

VA FIRE PROTECTION DESIGN MANUAL

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL

CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE

TECHNICAL INFORMATION LIBRARY (TIL)

FLOOR FINISH

Fl. B: Ch. 38 New Business Ch. 39 Exist Business Fl. 1: Ch. 38 New Business Ch. 39 Exist Business (Primary) Ch. 21 Exist Ambulatory Health Care Fl. 2: Ch. 18 New Health Care Ch. 19 Exist Health Care Fl. 3: Ch. 38 New Business Ch. 39 Exist Business Fl. 4: Ch. 18 New Health Care Ch. 19 Exist Health Care Fl. 5: Ch. 18 New Health Care Ch. 19 Exist Health Care Fl. 6: Ch. 18 New Health Care Ch. 19 Exist Health Care Fl. 7: Ch. 18 New Health Care Ch. 19 Exist Health Care Fl. 8: Ch. 20 New Ambulatory Health Care Ch. 21 Exist Ambulatory Health Care Fl. 9: Ch. 38 New Business Ch. 39 Exist Business Fl. 10: Ch. 18 New Health Care Ch. 19 Exist Health Care (Primary) Ch. 32 New Large Residential Board and Care Ch. 33 Exist Large Residential Board and Care Fl. 11: Ch. 38 New Business Ch. 39 Exist Business Fl. 12: Ch. 38 New Business Ch. 39 Exist Business Fl. 13: Ch. 40 Industrial Fl. 14: Ch. 40 Industrial

UNLIMITED

SECOND FLOOR

BLDG 1

BLDG 25

BLDG 17

TOTAL

38,158 17,875 4,711

60,744

THIRD FLOOR 38,730 3,094

FOURTH FLOOR 38,684

FIFTH FLOOR 28,575

SIXTH FLOOR 28,678

SEVENTH FLOOR 28,702

EIGHTH FLOOR 28,269

NINTH FLOOR 28,171

TENTH FLOOR 25,305

TOTAL

EXISTING +

ADDITION

572,792

41,824 41,778 31,669 31,772 31,796 31,363 31,265 28,399

ELEVENTH FLOOR 22,495 25,589

TWELFTH FLOOR 9,412 0 9,412

THIRTEENTH FLOOR 4,895 0 4,895

FOURTEENTH FLOOR 2,922 0 2,922

4,812

4,812

42,970 17,875 4,711

65,556

45,418 38,288 4,842 89,482

4,812

4,812

50,230 38,288 4,842 94,294

*(4,812-1,904) 2,908

2,908

56,110 44,148

100,258

2 D925

1.5

EXIT ACCESS CORRIDORS 1

A OR BWALL/CEILING - NEW BUSINESS,

EXITS AND EXIT ACCESS CORRIDORS

WALL/CEILING - NEW BUSINESS, OTHER SPACES A, B OR C

WALL/CEILING - NEW HEALTH CARE

WALL/CEILING - NEW AMBULATORY HEALTH,

EXITS AND EXIT ACCESS CORRIDORS

A OR B

WALL/CEILING - NEW AMBULATORY HEALTH, OTHER SPACES A, B OR C

WALL/CEILING - NEW LG RES BOARD AND CARE, EXITS A

WALL/CEILING - NEW LG RES BOARD AND CARE, LOBBIES,

CORRIDORS AND ROOMS

A OR B

A*

*ROOM OCCUPANT 4 OR LESS,

OR THE LOWER 48" OF WALL HEIGHT

A OR B

3,094 3,094 3,094 3,094 3,094 3,094 3,094 3,094

ARRANGEMENT OF MEANS OF EGRESS

(NFPA 101 19.2.6.2.4)TRAVEL DISTANCE

NOT

LIMITED(NFPA 101 TABLE 42.2.5)COMMON PATH OF TRAVEL

(NFPA 101 TABLE 42.2.5)DEAD END

HEALTH CARE OCCUPANY - FULLY SPRINKLERED - NON-PATIENT CARE SUITE

(NFPA 101 21.2.6.2.2)TRAVEL DISTANCE 200 FT

(NFPA 101 21.2.5.3.1)COMMON PATH OF TRAVEL 100 FT

(NFPA 101 21.2.5.2)DEAD END 50 FT

AMBULATORY HEALTH CARE - FULLY SPRINKLERED

PRIMARY USE: STORAGE LOW HAZARD (NFPA 101 TABLE 42.2.6)

NA

500 10 (x .2 = 2")

150 5

THIRD LEVEL 2,985 6

FOURTH LEVEL 2,985

FIFTH LEVEL

SIXTH LEVEL

SEVENTH LEVEL

EIGHTH LEVEL

NINTH LEVEL

TENTH LEVEL 2,904

ELEVENTH LEVEL 2,904 6

2,985

2,985 6

2,985 6

2,985

2,985

D925, P732, P717

(x .2 = 2.6")

(x .2 = 2")

(x .2 = 1.2")

(x .2 = 1.2")

(x .2 = 1.2")

(x .2 = 1.2")

(x .2 = 1.2")

(x .2 = 1.2")

(x .2 = 1.2")

(x .2 = 1.2")

(x .2 = 1.2")

COLUMNS SUPPORTING ROOFS ONLY 2 Y633, Y634, Y707

BEAMS, GIRDERS SUPPORTING SUPPORTING

MORE THAN ONE FL

BEAMS, GIRDERS SUPPORTING ROOFS ONLY 2 D925

D925

FU

TU

RE

P

HA

SE

-N

IC

ARRANGEMENT OF MEANS OF EGRESS (CONTINUED)

(NFPA 101 33.3.2.6.2)

TRAVEL DISTANCE

125 FT

(NFPA 101 33.3.2.5.3)COMMON PATH OF TRAVEL 160 FT

(NFPA 101 33.3.2.5.4)DEAD END 50 FT

LARGE RESIDENTIAL BOARD AND CARE - FULLY SPRINKLERED

WITHIN ROOM TO CORRIDOR

(NFPA 101 33.3.2.6.3.1)CORRIDOR DOOR TO EXIT 100 FT

(NFPA 101 39.2.6.3)TRAVEL DISTANCE 300 FT

(NFPA 101 39.2.5.3.1)COMMON PATH OF TRAVEL 100 FT

DEAD END 50 FT

BUSINESS OCCUPANY - FULLY SPRINKLERED

EXISTING (STORIES) UNLIMITED14

NEW ADDITION (STORIES) UNLIMITED8, INCLUDING BASEMENT

FUTURE EXPANSION (STORIES) UNLIMITED12, INCLUDING BASEMENT

FUTURE EXPANSION (FEET) UNLIMITED148'-8 1/2", FROM T.O. FIRST FL

FU

TU

RE

P

HA

SE

-N

IC

- SUPPORTING ROOF ONLY 2 NA

EX

IT

EXIT

(EXIST)

EXIT

(EXIST)

EXIT

(EXIST)

EXIT

(EXIST)

EX

IT(EXIST)

EX

IT(EXIST)

(EXIST) EX

IT

EXIT

(EXIST)

EXIT

(EXIST)

EXIT

(EXIST)

EXIT

(EXIST)

EXISTING

MECHANICAL

HVAC

ELECTRICAL

DISTRIBUTION

1205B

HAC

STORAGE

EXISTING

CORRIDOR

1104A

FUTURE

MECHANICAL

FEC -

EXIST

FEC -

EXIST

FE

FEC -

EXIST

FEC -

EXIST

FEC -

EXIST

FEC -

EXIST

FEC -

EXIST

FEC -

EXIST

FEC -

EXIST

BUILDING 17

TRAVEL DISTANCE 285' - 4"

1104B

CORRIDOR

NOTE:

SEE OTHER DISCIPLINE DRAWINGS FOR

SITE SCOPE OF WORK BEYOND

ARCHITECTURAL

FUTURE

AHU

FUTURE AHU

CO

MM

ON

PA

TH

O

F T

RA

VE

L 7

1' - 6"

EXIST STAIR

TR

AV

EL

DI

ST

AN

CE

5' -

OCCUPANCY:

CH. 39 EXISTING BUSINESS

MIXED OCCUPANCY:

USE: CH. 42 STORAGE

(LOW HAZARD). SPACE

TO COMPLY W/

PREDOMINANT OCCUPANCY,

CH. 39 EXISTING BUSINESS.

39.2.4.2 EXIT ACCESS

PERMITS SINGLE EXIT

ACCESS PATH FOR

DISTANCES MEETING THE

CPOT.

39.3.2.1: HAZARDOUS AREAS INCLUDE THOSE

USED FOR GENERAL STORAGE, PROTECT PER 8.7.

8.7.1.2: IN NEW CONSTRUCTION, WHERE

SPRINKLERED, SPACE SHALL BE ENCLOSED BY

SMOKE PARTITIONS.

NOTE: PARTITIONS AROUND FUTURE MECHANICAL

ROOM UPGRADED TO 1 HR FIRE BARRIER RATING

IN EVENT THE VA WANTS TO ALSO USE THE

SPACE AS COMBUSTIBLE STORAGE WITH A

HEALTH CARE OCCUPANCY IN THE FUTURE.

39.3.2.1 - (8.7) (8.4.3.1):

8.4.3.3 DOORS SHALL NOT INCLUDE LOUVERS

8.4.3.5. DOOR TO ROOM TO BE SELF OR

AUTOMATIC-CLOSING.

FEC

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

LIM

ITS

O F C

ON

ST

RU

CT

IO

N

LIM

ITS

O F C

ON

ST

RU

CT

IO

N

EXIT

(EXIST

BEYOND)

EXIT

(EXIST

BEYOND)

EXISTING EXTERIOR WALL

OF BUILDING 17 NOTED AS 2

HOUR RATED IN ASBUILTS

PROVIDED BY THE VA.

EXISTING WALL CONSTRUCTION, COMPOSED OF

BRICK VENEER ANCHORED TO 8" STRUCTURAL

CLAY TILE, SEPARATED WITH AN AIR GAP BY

ANOTHER 4" STRUCTURAL CLAY TILE AND FINISHED

W/ 3/4" PLASTER, AT FIRST LEVEL AND ABOVE,

PROVIDES A 3+ HOUR FIRE BARRIER RATING.

EXISTING EXTERIOR WALL FOR BUILDING 1 IS A

BEARING WALL AT THIS LEVEL.

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL DISTANCE

EA

EDEXIT EXIT

HORIZONTAL EXIT

EXIT DISCHARGE

EXIT ACCESS

FIRE EXTINGUISHERFE

FIRE EXTINGUISHER

CABINETFEC

LIMITS OF

CONSTRUCTION

HEALTH CARE SUITE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

OCCUPANCY

SEPERATION

SHAFT

ADJACENT SYMBOLS SHOW PARTITION RATING

AND DAMPER REQUIREMENTS

HAZARDOUS USE

ADJACENT SYMBOLS SHOW PARTITION RATING AND DAMPER

REQUIREMENTS. OPENINGS REQUIRE GASKET, CLOSER &

LATCH

EXIT PASSAGEWAY

RATE AS STAIR

ALL OPENINGS TO BE RATED AS STAIR SHAFT

CORRIDOR

WALLS TO LIMIT THE TRANSFER OF SMOKE

ADJUNCT CORRIDOR or PSYCHIATRIC AREA or

CONSTUCTED WITH MIN. 4'-0" CLEAR WITH (PER

CHAPTER 19)

100'-10"

COMMON PATH OF

TRAVEL DISTANCE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

GI011

FIRST LEVEL LIFE SAFETY PLAN

AND CODE SUMMARY

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 FIRST LEVEL LIFE SAFETY PLAN

#7

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

FE

#1

SURGERY

ACCESS

TO

FUTURE

ECHO

ECHO

SUPVR

SLEEPING

ADMIT SURGERY

SLEEPING

CARDIO

NE

SLEEPING

CAMERA

ROOM

C A

B C

A B

C A

B C

A B

TA

B

LE

TABLE

BIO

BIO

IV

IV

BED

STORAGE

ROOM

PATIENT

ROOM

PATIENTROOM

PATIENT

ULTRASOUND

STORAGE -

XRAY

CONFERENCE

ROOM

STORAGE

C/T

SCANNER

MECH

JANELEC

2774 2775 2774

2801 2802

TOILET

FORTE

CAMERA

READING

AREA

WAITING

ROOM

CHEMICAL

STRESS

ROOM

CORRIDOR

CORRIDOR

BRIGHTVIEW

XCT CONTROL

ROOM

GEMINI

PET/CT

UPTAKE

HOT

TOILET

HOT

LAB

CORRIDOR

WORK

RM.

CATH LAB

A

MED

PATIENT

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

WAITING

SLEEP

RM

SLEEP

RM

OFFICE

OFFICE

LOCKER

RMOFFICE

NURSING

REPORT

RM

MED

RM

DEXA

CONSULT

UTILITY

CLEAN

UTILITY

SOILEDJANRM

NUTRIT

RM

MED

OFFICE

OFFICEOFFICE

ROOM

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

HISTOLOGY

CHEMISTRY

ROOF

ROOF

ROOM

PROCEDURE

ROOM

PROCEDURE

CLEAN

STORAGE

TOILET

SUPPLIES

DIRTY

ROOM

PROCEDURE

AIR

HANDLER

AIR

HANDLER

AIR HANDLER

#2

ELECTRIC

VOLTAGE

HIGH

SHAFT

HVAC

TELECOM

WAITING

XRAY

CHEST

XRAY

C.R.

ROOM

VIEWING

TLTTLT

CTRLCTRL

XRAY

XRAY

LOCKER

ROOM

VIEWING

OFFICE

SOUND

ULTRAOFFICE

TLTTLT

OFFICE

OFFICE

OFFICE

ROOM

CONFERENCE

OFFICE

ROOM

READING

OFFICE

OFFICE

TLT

ACCESSION

CENTRALHEMATOLOGY

XRAY FILE

ROOM

ELEC

TLTJAN

OFFICEOFFICE

FROZEN

SECTION

BANK

BLOOD

TOXICOLOGY CHEMISTRY

OFFICE

OFFICE

PRINTERS

STORAGE

ROOM

BREAK

HR HR

CG

CG

CG

HRHR

HRHRHRHRHRHR

m x v1 mx11 m x

JOHN HAAS

SAJAN MAHAJAN

GREGORY PETERS

#8#7

BLDG.

BLDG.

FE

FE

FE

FE

FE

LIM

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIMITS OF CONSTRUCTION

LIM

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIMITS OF CONSTRUCTION

FUTURE AHU

FUTURE AHU

EXIST PROC

RM

EXIST

HOLDING

EXIST

HOLDING

EXIST

HOLDING

EXIST

HOLDINGEXIST

STORAGE

EXIST TLT

EXIST TLT

EXIST

LOBBY

EXIST

CNTRL

EXIST CT

SCAN

EXIST

EQUIP

2090A

FUTURE

MECHANICAL

EXIST STAIR

EXIT

(EXIST)

EX

IT

(EXIST)

EX

IT

(EXIST)

EXIT

(EXIST)

EX

IT

(EXIST)

EX

IT

(EXIST)

EXIT

(EXIST)

CO

MM

ON

PA

TH

O

F T

RA

VE

L 1

8"

NFPA 101

CH. 42 STORAGE OCCUPANCY:

6.2.2.2 LOW HAZARD CONTENTS - THOSE OF SUCH LOW

COMBUSTIBILITY THAT NO SELF-PROPAGATING FIRE THEREIN

CAN OCCUR.

42.2.4.1(1) IN LOW HAZARD OCCUPANCIES A SINGLE MEANS OF

EGRESS SHALL BE PERMITTED FROM ANY STORY OR SECTION.

TABLE 42.2.5 LOW HAZARD STORAGE OCCUPANCY, HAS NO

LIMIT ON DISTANCE FOR COMMON PATH OF TRAVEL.

NEW NON-PATIENT CARE SUITE, PRIMARY

USE: STORAGE (LOW HAZARD).

OCCUPANCY:

CH. 19 EXISTING HEALTH CARE

EXISTING PATIENT-CARE (NON-

SLEEPING) SUITE 4

19.3.2.1.2 SUITE SEPARATION - FIRE

PARTITION/SMOKE RATED

NOTE: PARTITIONS AROUND FUTURE

MECHANICAL ROOM UPGRADED TO 1 HR FIRE

BARRIER RATING IN EVENT THE VA WANTS TO

ALSO USE THE SPACE AS COMBUSTIBLE

STORAGE WITH A HEALTH CARE OCCUPANCY

IN THE FUTURE.

EXISTING SUITE 5

EXISTING SUITE 3

EXISTING SUITE 1EXISTING SUITE 2

TRAVEL DISTANCE 206' - 0"

19.3.2.1.3 DOOR TO ROOM TO BE

SELF-CLOSING

FE

EXIST

HOLDING

FE

INDUSTRIAL METAL FABRICATED STAIR FOR

ROOF ACCESS TO PODIUM ROOF FOR ACCESS

TO ROOF DRAINS ONLY. STAIR IS NOT

INTENDED NOR REQUIRED FOR EGRESS. SEE

PARTIAL FLOOR PLANS IN AE SERIES

DRAWINGS FOR MORE INFORMATION.

UP

EXISTING EXTERIOR WALL

OF BUILDING 17 NOTED AS 2

HOUR RATED IN ASBUILTS

PROVIDED BY THE VA.

EXISTING WALL CONSTRUCTION, COMPOSED OF BRICK

VENEER ANCHORED TO 8" STRUCTURAL CLAY TILE,

SEPARATED WITH AN AIR GAP BY ANOTHER 4" STRUCTURAL

CLAY TILE AND FINISHED W/ 3/4" PLASTER, AT FIRST LEVEL AND

ABOVE, PROVIDES A FIRE RATING WHICH EXCEEDS THE 2-

HOUR FIRE BARRIER RATING REQUIREMENT FOR A STAIR

ENCLOSURE

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL DISTANCE

EA

EDEXIT EXIT

HORIZONTAL EXIT

EXIT DISCHARGE

EXIT ACCESS

FIRE EXTINGUISHERFE

FIRE EXTINGUISHER

CABINETFEC

LIMITS OF

CONSTRUCTION

HEALTH CARE SUITE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

OCCUPANCY

SEPERATION

SHAFT

ADJACENT SYMBOLS SHOW PARTITION RATING

AND DAMPER REQUIREMENTS

HAZARDOUS USE

ADJACENT SYMBOLS SHOW PARTITION RATING AND DAMPER

REQUIREMENTS. OPENINGS REQUIRE GASKET, CLOSER &

LATCH

EXIT PASSAGEWAY

RATE AS STAIR

ALL OPENINGS TO BE RATED AS STAIR SHAFT

CORRIDOR

WALLS TO LIMIT THE TRANSFER OF SMOKE

ADJUNCT CORRIDOR or PSYCHIATRIC AREA or

CONSTUCTED WITH MIN. 4'-0" CLEAR WITH (PER

CHAPTER 19)

100'-10"

COMMON PATH OF

TRAVEL DISTANCE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

BID SET

I, THOMAS OLESAK, AM THE COORDINATING

PROFESSIONAL ON THE CONSTRUCT AIR

HANDLING TOWER PROJECT.

GI012

SECOND LEVEL LIFE SAFETY

PLAN

NWIHCS - CONSTRUCT

AIR HANDLING TOWER

OMAHA, NE

636-18-303

05/28/21 LA CM

1/16" = 1'-0"1 SECOND LEVEL LIFE SAFETY PLAN

M

GRILL

EXAHUST

H P S

H P S

H P S

HWS

H W S

H W S

HWS

LP

S

H W S

HWR

H W R

H W R

HWR

H W R

LP

S

LP

S

LP

S

LPS

C

C

C

C

C

C

LPS

LP

S

1 1/4"

2" S

HEAT TRACE

S

HEAT TRACE

EXPANSION TANK

AIR SEPARATOR

H W S

R W S

H W S

H W S

RWS

R W S

RWS

HWS

HWS

HWS

H W R

R W R

H W R

H W R

RWR

R W R

RWR

HWR

HWR

HWR

W P

S D

S D

OFFICE KITCHEN

CANTEEN

DININGDINING

CANTEEN

CANTEEN

DINING

TLT

OFFICE

OFFICE

CANTEEN

RETAIL

STORE

PICTEL

SITE

JAN ELEC

SHOPCANTEEN

TLT

LIBRARY

OFFICE STORAGE

OFFICE

OFFICE

RESEARCH

OFFICE

OFFICE

MED

MEDIAWORK

ROOM

CONF

ROOM

STORAGE

CONF

ROOM

CREDIT

UNION

OFFICE OFFICE

STOR TLT

OFFICE OFFICE OFFICE

KITCHEN

MECHANICAL

REFRIG

STORAGE

TLT

BREAK

ROOM

STOR

JAN

6 FTE

MODULAR

CASEWORK

MECH

MECH STORAGE

SHOP

PLASTER/MASON

ICU

MECHANICAL

OPEN

OFFICE

CORRIDOR

CONF.

OFFICE

PREP

CARTS

OFFICE

OFFICE

STORAGE

TLT

OFFICE

STORAGE

OFFICE

OFFICE

CRS

66A BLOWER/DRYER

CLEAN

TABLE

EXISTING

PREWASHTABLE TO

REMAIN

#6

3754A

3267D

X

X X X

FE FE

FE

FE

FE

FUTURE AHU

FUTURE AHU

FUTURE

MECHANICAL

EX

IT (EXIST)

EXIST

STORAGE

EXIST TRAY

MAKEUP

EXIST

OFFICE

EXIST

COOLER

EXISTING

COOLERS

EXIST

FREEZER

EXIST STAIR

EXIST

OFFICE

EXIST DISH

WASHING

EXIST

FREEZER

EX

IT

(EXIST)

EX

IT (EXIST)

EX

IT

(EXIST)

EX

IT

(EXIST)

EX

IT

(EXIST)

OCCUPANCY:

CH. 39 EXISTING BUSINESS

LIM

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIMITS OF CONSTRUCTION

LIM

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIMITS OF CONSTRUCTION

COMMON PATH OF TRAVEL 8

4' -

9"

EXIST

STORAGE

EXIST

STORAGE

TRAVEL D

ISTANCE 12

6' - 10"

MIXED OCCUPANCY:

USE: CH. 42 STORAGE

(LOW HAZARD). SPACE

TO COMPLY W/

PREDOMINANT OCCUPANCY,

CH. 39 EXISTING BUSINESS.

39.2.4.2 EXIT ACCESS

PERMITS SINGLE EXIT

ACCESS PATH FOR

DISTANCES MEETING THE

CPOT.

39.3.2.1: HAZARDOUS AREAS INCLUDE THOSE

USED FOR GENERAL STORAGE, PROTECT PER 8.7.

8.7.1.2: IN NEW CONSTRUCTION, WHERE

SPRINKLERED, SPACE SHALL BE ENCLOSED BY

SMOKE PARTITIONS.

NOTE: PARTITIONS AROUND FUTURE MECHANICAL

ROOM UPGRADED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .