This document is an amendment to a solicitation notice for an air handling tower construction project at a Veterans Affairs medical center. The solicitation is identified as number 36C26321R0102 and involves opportunity number 636-18-303. The amendment provides answers to questions received from potential offerors. It clarifies that a 20-inch diameter cast-in-place concrete pile should be used as typical, with a larger size to be specified in an upcoming addendum. Reinforcing details and design loads for the piles are also outlined. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23 is the contracting agency. The amendment does not change the response due date or provide any new information on pricing, set asides, or other contract terms.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0004 08-05-2021 636-21-4-5998-0001 636-21-4-5998-0006
636-18-303
36C263
Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077
36C263
Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077
To all Offerors/Bidders
36C26321R0102
06-25-2021
X
X X
636-3610162-5998-854200-3220 23NR0WA06
The purpose of this amendment is to answer questions received in response to this solicitation. See page 2 for questions and answers.
Gregg R. Sutcliffe
VA-VHA-2019-BB2D4962
Question 1: Specification 03 45 00 for Thin Brick – The specification calls out a think brick called Greystone Velour by Cloud Ceramics. Cloud Ceramics has confirmed they don’t have any PCI testing results for their thin brick and therefore their brick does not meet the PCI standard as outlined at the beginning of 2.7.A in the specification. Is Endicott and approved product for this project? Their brick does meet PCI standards.
Answer 1: Revise 034500 (2.7.A) to:
A. Thin Brick Units: PCI Standard or ASTM C-1088 type TBX, not less than 13 mm (1/2 inch), nor more than 25 mm (1 inch) thick, with an overall tolerance of plus 4 mm, minus 4 mm (+5/32 inch, - 5/32 inch) for any unit dimension 203 mm (8 inch) or less and an overall tolerance of plus 5.6 mm, minus 5.6 mm (+7/32 inch, -7/32 inch) for any unit dimension greater than 203 mm (8 inch) measured according to ASTM C67.
Question 2: What elevation do you think the site will be at for us to install the piles?
Answer 2: The top of basement mat slab elevation is 221'-4" with top of pile elevation at 217'-8".
Actual site conditions are determined by the excavation contractor and soil conditions during construction.
Question 3: What is the design load of the piles: compression, tension and lateral?
Answer 3: 20"Ø ACIP:
Compression = 250 kips Tension = 160 kips Lateral = 19 kips *additional ACIP size (larger) will be required and included in addendum documents.
Question 4: Drawing SF300 detail 3 shows a single #9 bar full length and a 20-inch diameter pile. Detail 8 on same page shows 16-inch diameter pile with a reinforcing cage and a center bar. Which one is correct?
Answer 4: 20"Ø should be used is the typical ACIP size. 16"Ø is not use or required.