Attachment (1) Work Item Listing (DRAFT) - JAM DS FY22Q2.pdf
PDF 285 KB Posted
- Attached to
- Dock-Side: USCGC JAMES FY22 DS1
- Solicitation number
- 70Z08522SP45-JAMES-DS-FY22-FYQ2
About this file
This document is a sources sought notice for a federal contract opportunity to perform dockside repairs on the USCGC James. The notice seeks information from companies interested in the repair work items listed in an attachment, which include replacing deck coverings, cleaning fuel tanks, inspecting fire detection and relief valve systems, and performing various maintenance. Interested parties are requested to provide company information, business size, certifications, a statement of ability to complete the listed work items and submit a proposal. Prior experience on similar naval vessel repair projects should also be detailed. The period of performance is March 2nd to June 1st 2022 at the cutter's homeport in North Charleston, South Carolina. Responses are due by the date specified in order to be considered for the work, which will be solicited following review of market research received.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment (2) DHS Form 11000-6 NDA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Item List (DRAFT) Doc-Side: USCGC JAMES FY22 FYQ2
WORK ITEM 1: Deck Covering (Slip-Resistant), Flight Deck, Renew
WORK ITEM 2: Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect
WORK ITEM 3: Fire Detection System, Inspect and Test
WORK ITEM 4: Relief Valves, Inspect And Test
WORK ITEM 5: Ship Stores Plant Refrigeration System Rupture Disks, Leak Test
WORK ITEM 6: Folding Boom Cranes, Biennial Maintenance, Perform
WORK ITEM 7: Dual Point Davit ,Biennial Maintenance, Perform
WORK ITEM 8: Carriage and Centerline Winch, Inspect and Test
WORK ITEM 9: VCHT Pump Discharge Check Valve, Renew
WORK ITEM 10: Deck Covering (Polymeric), Repair and Seal
WORK ITEM 11: Decks, Preserve (Full)
WORK ITEM 12: Deck Covering (Slip-Resistant), Renew
WORK ITEM 13: Cracks (Steel), Repair
WORK ITEM 14: Gooseneck Vent, Modify
WORK ITEM 15: Berthing, Upgrade, Phase 1 (NSC 3 & FOLLOW-Adding 17 New Rack)
WORK ITEM 16: Main Propulsion Diesel Engine, Exhaust Silencer, Replace
WORK ITEM 17: HVAC System (Port Aft Capstan), Modify
WORK ITEM 18: BERP and QAWTD 01-57-2, Install
WORK ITEM 19: Tenting, Provide
File details come from the government source that posted it. Updated .