Woodcock Creek Lake Paving Overlay of Parking Lots and Roadways
1. GENERAL REQUIREMENTS
1.1. GENERAL
The Contractor shall be responsible for furnishing all supplies, materials, equipment and labor as necessary to complete the work as specified herein. The work consists of, milling existing pavement as needed, placing an overlay of bituminous wearing course over existing asphalt, and areas of leveling course to fill existing potholes and ruts. All driving areas shall be milled 1” and receive a 2” overlay. The Contractor shall also restripe the parking lot stall markings and replace the parking bumpers for the parking lot. There shall be an awardable option for the milling and overlay of the parking stalls of the parking lot. Site plan satellite imagery of the areas are attached to the end of these specifications. Woodcock Creek Lake is located in Crawford County, PA. The work is located at Woodcock Creek Lake Visitors Center, 22079 State Route 198, Saegertown, PA 16433-0629. The site of the work may be reached from state and local roads and streets.
1.1.1. Coordination Meeting and Points of Contact (POCs)
Prior to commencement of any work being performed on site, the Contractor shall participate in a teleconference with the Administrative Contracting Officer (ACO) and the Woodcock Lake Resource Manager:
Resource Manager – Mr. Ryan Hill, 814-763-4422, ryan.j.hill@usace.army.mil
Administrative Contracting Officer (ACO) – Mr. David Conrad, 412-395-7679, or 412-600-2045, David.T.Conrad@usace.army.mil
1.2. SUBMITTALS
The Contractor shall provide submittals for Government Approval. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications. It will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work.
The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall, in such event, promptly replace, correct, or repair the rejected supplies or services at the Contractor’s expense.
1.2.1. Required Submittals
1.2.1.1. SD-01 Preconstruction Submittals
1.2.1.1.1. Manufacturer's Literature
For all proposed materials to be furnished under this contract the Contractor shall furnish manufacturer’s descriptive literature or catalog cuts, illustrations, specifications, and other data to show the proposed materials meet the specified requirements. All appropriate descriptive data shall be clearly indicated on the submittal.
1.2.1.1.2. Quality Control Plan (QCP)
The Contractor shall complete and submit a Quality Control Plan. A QCP template is provided as an attachment to the specifications. There shall be one qualified Superintendent and one qualified Contractor Quality Control (CQC) Manager. The SSHO and the Contractor Quality Control Manager may be the same person and may be the designated representative (DR). The quality control system shall consist of plans, procedures, and organization necessary to produce a product that complies with the contract requirements. Cover all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence. The project Superintendent will be held responsible for the quality of work and is subject to removal by the Contracting Officer. The Contracting Officer reserves the right to conduct any inspections or perform any tests deemed necessary at any time during the execution of the contract to determine conformance with the requirements of these specifications. Superintendent and CQC Manager shall be on site at all times work is being done.
1.2.1.1.3. Accident Prevention Plan (APP)
In addition to other requirements, the Accident Prevention Plan shall be coordinated with and refer to the Site Access and Work Plan to ensure proposed equipment can be used in a safe manner on the terrain encountered in the work area, including addressing the work conditions in the Activity Hazard Analysis (AHA).
1.2.1.1.4. Project Schedule
Project Schedule must be provided in Excel format and updated as necessary or as required by the ACO.
1.2.1.1.5. Site Access and Work Plan
Contractor shall submit for approval a written plan describing in detail all phases of paving operations. Plan shall include all requirements specified in paragraph “Site Conditions and Site Access And Work Plan”. Plan shall address work sequencing, time projections, as well as how each step will be controlled, tested, and evaluated. Plan shall address safety measures, equipment specifications, work scheduling around weather and record keeping.
1.2.2. SD-05 Design Data
1.2.2.1. Paving Plan
Contractor shall provide details for final layout and construction of the paving, including additional locations of leveling course for potholes and ruts, for approval by the Contracting Officer. Reference sketches are attached for reference.
1.2.2.2. Line Striping and Parking Plan
Contractor shall document the existing pavement markings, parking bumpers, and handicap parking stalls for the visitors parking lot in a sketch, for approval by the Contracting Officer. The plan shall match existing parking layout as closely as possible and facilitate the replacement in-kind of the existing line striping and parking bumpers. The plan shall include manufacturer’s information of the line paint to be utilized.
1.2.3. SD-11 Closeout Submittals Warranty Contractor's Warranty
The Contractor shall provide a one-year service warranty from the date of final acceptance against defects in workmanship.
1.2.4. Contractor Data Submission
All Contractor data submissions shall be submitted electronically to: Mr. David Conrad, David.T.Conrad@usace.army.mil
1.3. SECURITY REQUIREMENTS-AT/OPSEC
The Contractor shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation to the USACE Pittsburgh District Security Office within 2 weeks prior to onsite work. If any additional individuals are subsequently added to be onsite, their information must be submitted to Security for a background check via the process identified below. The Contractor must submit the Full Name, Date of Birth, and Social Security Number (Attachment 4) for all associated Contractor or subcontractor employees to the USACE
Pittsburgh District Security Office. The USACE Pittsburgh District Security Office needs a minimum of 30 day lead time to process Foreign Nationals. Please contact the District’s Security Office directly to obtain submission requirements. The completed Form shall be emailed as password-protected to the USACE Pittsburgh District Security Office, to the following individuals: Ivan Russell, Security Specialist, 412-395-7591, ivan.r.russell@usace.army.mil AND Andrew Wasko, Security Specialist, 412-395-7643, andrew.j.wasko@usace.army.mil, followed by a new, separate email with the password to the Security Specialists. The District retains the right to deny any Contractor and subcontractor employee from working on one of its contracts based on final background investigation results.
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
1.3.1. Physical Security and Access Control Requirements
All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
1.3.2. Pre-Screen Candidates using E-Verify Program
: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
1.4. SAFETY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, all work shall comply with the most recent edition of the USACE Engineering Manual (EM) 385-1-1, “Safety and Health Requirements Manual”, and all applicable federal, state, and local laws, ordinances, criteria, rules, and regulations. If there are any standards that require interpretation, submit matters to the appropriate administrative agency for resolution before the commencement of work. Where the requirements herein, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern. The Superintendent, CQC Manager, and SSHO are subject to dismissal if any of the required regulatory requirements are not being effectively carried out.
If dismissal occurs, project work will be stopped and no work shall proceed until a suitable replacement is approved and the appropriate requirements are assured to be effectively carried out. The latest version of the EM 385-1-1 is available online at:
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_ 385-1-1.pdf.
1.4.1. Accident Prevention Plan (APP)
An Accident Prevention Plan (APP) is a safety and health policy and program document that shall be contract-and/or job-specific. The APP shall be developed by the Contractor and shall interface with the Contractor's overall Safety and Health Program, such that any portions of the Contractor's overall program referenced in the APP shall be included as appropriate. The Contractor shall develop the APP in accordance with EM 385-1-1, Appendix A, and shall address each of the elements/sub-elements in the outline contained in the appendix in the order that they are provided in the manual, and as supplemented herein. If an item is not applicable because of the nature of the work to be performed, the Contractor shall state this exception and provide a justification. The APP shall be written in English by the Prime Contractor and shall articulate the specific work, work processes, equipment to be used, and hazards pertaining to the contract.
The non-mandatory APP Checklist, Form A-2 of the EM 385-1-1, may be used to ensure each area of required information has been provided as part of the APP to the Contracting Officer. The APP shall be submitted to the COR for review and acceptance within 15 calendar days after receipt of the Notice to Proceed (NTP) and prior to any commencement of work. Work cannot begin without an accepted APP. Once accepted by the Contracting Officer, the APP and all attachments will be enforced as part of the contract. Disregarding provisions of this contract or the accepted APP is a cause for stopping of that portion of the work at the direction of the Contracting Officer until the matter has been rectified. Each sub-Contractor shall be provided a copy of the accepted APP and a copy shall be available on the worksite at all times. A signature log shall be completed by each sub-Contractor supervisor attesting that they have read and understand the APP. All sub-Contractors shall comply with the APP.
The Contractor shall provide on-going evaluations of the APP throughout the life of the project.
Changes, revisions, and updates to the APP shall be reviewed and accepted by the Contracting Officer, project Superintendent, SSHO, and Contractor Quality Control Manger.
1.4.2. Infectious Disease Exposure Prevention, Preparedness, and Response Plan
Due to the recent COVID-19 pandemic, all Contractors that perform operations on LRP USACE-owned/operated facilities are to include an Infectious Disease Exposure Prevention, Preparedness, and Response Plan as an addition to their overall APP. The plan shall describe how the Contractor will implement the requirements and best practices issued by Federal, State, and Local authorities in order to prevent the spread of COVID and/or other infectious diseases.
1.4.3. Risk Management
A risk management assessment tool, such as activity hazard analysis (AHA), job safety analysis (JSA), or job hazard analysis (JHA) shall be developed by the Contractor performing the work for each activity, task, or defined feature of work (DFOW). The assessment shall identify the work sequence, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented to control the hazards. If Qualified or Competent Persons are required for a particular activity, they shall be identified and included in the assessment, and their competency/qualification identified. Work shall not begin until the assessment has been accepted by the Contracting Officer and discussed with all engaged in the activity.
These risk assessment tools are considered living documents and shall be updated as needed. If the RAC increases from what was originally accepted by the Contracting Officer, the assessment shall be re-submitted for acceptance prior to work proceeding. Changes that do not increase the RAC are not required to be resubmitted for acceptance.
The risk assessment shall be developed in accordance with EM 385-1-1 Section 1, or as specified by the Contracting Officer. The Contractor may use the AHA form in Attachment _ to assist with completion of their risk assessments. Risk assessments shall be submitted for review at least 15 working days prior to the start of the activity, task, or defined feature of work is set to begin. The Government reserves the right to require the Contractor to revise and resubmit any documents if they fail to effectively identify the work sequence, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented.
Each employee performing work as part of an activity, task, or defined feature of work shall review the risk assessment for the activity and sign the signature log designated for the assessment prior to beginning work. A signature log shall be maintained for each risk assessment.
1.4.4. Implementation of Safety and Occupational Health (SOH) Program
The Contractor shall employ a minimum of one Competent Person at each project site to function as the primary Site Safety and Health Officer (SSHO) to implement and administer the Contractor’s safety program and the Government-accepted Accident Prevention Plan (APP). The SSHO is a full-time responsibility and shall be an employee other than the supervisor (unless specified differently in the contract and coordinated with the local SOH Office), that reports directly to a senior project, or corporate, official. The SSHO shall be present at the project site and be located so they have full mobility and reasonable access to all major work operations during the shift. The SSHO shall meet all training and experience qualifications as outlined in EM 385-1-1 Section 01, Paragraph A.17. The SSHO may also serve as the Quality Control Manager. The SSHO may not serve as the Superintendent. SSHO shall attend the pre-construction conference, pre-work meetings, including preparatory and periodic in-progress meetings.
1.4.5. Mishap Reporting
A mishap is any unplanned, undesired event that occurs during the course of work being performed, to include, accidents, incidents, and near misses. All mishaps shall be reported to the Contracting Officer within 24-hours after notification from the affected employee(s). Contractors are responsible for maintaining an OSHA Log of Work- Related Injuries and Illnesses (Form 300) and complying with all reporting and recordkeeping requirements specified in 29 Code of Federal Regulations (CFR) 1904.
1.4.6. Damage Reports
All instances where Government materials, supplies, property, and/or equipment are damaged shall be reported immediately to the Contracting Officer and Resource Manager.
1.4.7. Minimum Personal Protective Equipment
Personal Protective Equipment (PPE) is governed in all areas by the nature of work personnel are performing based on conducted hazard evaluations. AHAs shall detail the PPE to be used that will provide appropriate protection for the work to be performed when required. All PPE shall be provided by the Contractor, used, and maintained in a sanitary and reliable condition whenever the hazard dictates use.
Mandatory PPE, at minimum, shall include hardhat (construction sites), long pants, short sleeve shirts, and leather or protective work shoes or boots. Personal Floatation Devices (PFDs) shall be worn at all times when working above or near water in which other fall protection methods do not provide the appropriate protection.
1.4.8. Designated Persons
The Contractor shall provide Qualified and/or Competent Persons in accordance with EM 385-1-1, OSHA, ANSI, and where specified herein. All Qualified and Competent Persons shall be designated in writing and shall meet the requirements for the specific activity for which they are designated. Competent Persons identified in the Contractor’s Safety and Health Program and Government-accepted APP shall be onsite at all times when the work that presents the hazards associated with the competency is being performed. Certificates of Qualification/Competency shall be provided to the Contracting Officer for review and provided as part of the applicable AHAs and appendices of the APP.
1.4.9. Hazardous Material Exclusion
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with EM 385-1-1 such as, nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury, polychlorinated biphenyls (PCBs), Diisocyanates, lead, lead-based paint (LBP), and hexavalent chromium, are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials.
Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval. Notify the Radiation Safety Officer (RSO), Safety Office, and the Contracting Officer prior to excepted items of radioactive material and devices being brought on site.
1.4.10. Unforeseen Hazardous Materials
All known hazardous materials will be identified by the Government to the Contractor. If materials that may be hazardous to human health upon disturbance are encountered during the performance of contract work, that portion of the work shall be stopped, and the COR immediately notified.
1.5. PROJECT/SITE CONDITIONS
1.5.1. Photos and Site Plan
Photos, site plan, and sketches have been provided to show existing conditions to the best knowledge of the Government. The photos, sketches, site plan are intended to assist the Contractor in evaluating how to perform the work safely and in accordance with Paragraph “Site Conditions and Site Access And Work Plan”. The Government cannot guarantee the accuracy of the dimensions, elevations, and features shown or stated, and it shall be the responsibility of the Contractor, if necessary, to verify all elevations and the dimensions by measurements in the field. The Contractor shall verify elevations and dimensions before laying out the work. The Contracting Officer shall be notified of any discrepancies prior to commencing work.
1.5.2. Verification of Field Conditions
The Contractor shall verify all dimensions and conditions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. Prior to mobilization, the Contractor and the Contracting Officer or their designated representative shall conduct a joint inspection of access routes to the construction site, work areas, and the construction site.
1.5.3. Work Areas
The Contractor shall ensure that his operations will not interfere with the operation of the project or the duties of project personnel. Transport of materials and equipment shall be the responsibility of the Contractor. The Contractor shall be fully responsible for determining the methods used to transport materials and equipment to and from the areas as well as the removal of waste materials from such spaces. The proposed laydown area is indicated in blue on the Site Plan. The approved laydown and work area will be coordinated and agreed upon with the ACO.
1.5.4. Site Access And Work Plan
Neither the Contractor nor the Contractor’s employees shall be permitted inside of the Maintenance Building for any reason. Transport of materials and equipment shall be the responsibility of the Contractor. The Contractor shall be fully responsible for determining the methods used to transport materials and equipment to and from the areas as well as the removal of waste materials from such spaces. The Contractor shall ensure that his operations shall not interfere with the operation of the project or the duties of project personnel. Work areas shall be coordinated and agreed upon with the Resource Manager, dependent on other contracts being carried out at the time.
1.5.5. Time of Performance
The Contractor shall notify the Points of Contact prior to start of work. The Contractor shall schedule work through the ACO. The Contractor shall coordinate work with the ACO at least 3 days before starting work. The Contractor shall confine all operations at the work site between the hours of 7:30 AM and 4:00 PM, Monday through Friday, unless otherwise approved by the ACO. Work will not be permitted on weekends or Federal holidays unless otherwise approved. The following is a list of federal holidays:
New Year's Day January 1 Birthday of Martin Luther King, Jr. Third Monday in January Washington's Birthday Third Monday in February Memorial Day Last Monday in May Juneteenth National Independence Day June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25
1.5.6. Period of Performance
The Contractor shall complete all work within 270 calendar days, but no later than 1 June 2023, after receipt of Notice to Proceed.
1.5.7. Protection of Government Property
The Contractor shall protect all government property during the performance of this contract. All damage to existing government property as a result of the Contractors work shall be repaired or replaced to the satisfaction of the Contracting Officer.
1.5.8. Protection of Personnel
The Contractor shall ensure that adequate measures are in place to protect workers, facility operation personnel and the public from injury due to the operations being performed. All protective measures shall be in accordance with EM 385-1-1.
1.5.9. QUALITY ASSURANCE
1.5.9.1. Daily Inspection Report
1.5.9.2. Submit one copy of the daily inspection report to the Contracting Officer within 24 hours of the date recorded.
1.5.10. Pre-work Conference
After approval of submittals and before performing the paving work, hold a Pre-work conference to review the following: Drawings, specifications, and submittals related to the work; Site access and work plan installation;
Safety requirements; and Proposed schedule.
Coordinate pre-work conference scheduling with the Contracting Officer. The conference must be attended by the Contractor, the Contracting Officer's designated personnel, personnel directly responsible for the paving operation and the Resource Manager and/or their designee(s).
1.5.11. MEASUREMENT AND PAYMENT
1.5.11.1. JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.5.11.1.1. Line Striping and Parking Bumpers
1.5.11.1.1.1. Payment: Payments shall constitute full compensation for all costs to complete the work, including, but not limited to, design, materials, application, equipment costs for re-painting parking stalls, removing existing parking bumpers, and replacing existing parking bumpers in the visitors parking lot, 27 parking bumpers total. All costs in connection therewith shall be included in the applicable pavement to which the work applies.
1.5.11.1.1.2. Measurement: The measure shall be the required materials to complete the parking lot painting and parking bumper placement based on the approved parking plan.
1.5.11.1.1.3. Unit of Measure: Job
1.5.11.1.1.4. Payment Item: 1002 LINE STRIPING AND PARKING BUMPERS–
AWARDABLE OPTION
1.5.11.2. UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract progress payments will be based are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular unit price item, shall be included in the listed unit price item most closely associated with the work involved. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.5.11.2.1. Bituminous Pavement Visitors Parking Lot
1.5.11.2.1.1. Payment: Payments for bituminous paving shall constitute full compensation for all costs to complete the work, including, but not limited to, joint treatment at the interfaces of new paving with existing paving, milling of existing pavement, and bituminous wear courses. No separate payment will be made for bituminous tack coat, and all costs in connection therewith shall be included in the applicable pavement to which the work applies.
1.5.11.2.1.2. Measurement: The area of bituminous binder or wearing course in place and accepted will be determined by a measurement of the actual area of pavement, properly placed and compacted to the specified thickness.
1.5.11.2.1.3. Unit of Measure: Square Yards (SY)
1.5.11.2.1.4. Payment Item: 0003 BITUMINOUS PAVEMENT VISITORS PARKING LOT
1.5.11.2.2. Pavement Dam Parking Lot – Parking Stalls – Awardable Option
1.5.11.2.2.1. Payment: Payments for bituminous paving shall constitute full compensation for all costs to complete the work, including, but not limited to, joint treatment at the interfaces of paving transitions, and bituminous wear course. No separate payment will be made for bituminous tack coat, and all costs in connection therewith shall be included in the applicable pavement to which the work applies.
1.5.11.2.2.2. Measurement: The area of bituminous binder or wearing course in place and accepted will be determined by a measurement of the actual area of pavement, properly placed and compacted to the specified thickness.
1.5.11.2.2.3. Unit of Measure: Square Yards (SY)
1.5.11.2.2.4. Payment Item: 1001 PAVEMENT DAM PARKING LOT – PARKING
STALLS – AWARDABLE OPTION
1.5.11.2.3. Leveling Course
1.5.11.2.3.1. Payment: Payments shall constitute full compensation for all costs to complete the work, including, but not limited to, design, materials, application, equipment costs, surface preparation, and leveling course placement. The asphalt pavement shall be paid as a unit price item. All costs in connection therewith shall be included in the applicable pavement to which the work applies.
1.5.11.2.3.2. Measurement: The measure shall be the required materials to complete for up to 560 square yards leveling course.
1.5.11.2.3.3. Unit of Measure: Job
1.5.11.2.3.4. Payment Item: 0002 LEVELING COURSE
Payment Item
Description Quantity U/M U/P Amount
0001 PERFORMANCE AND
PAYMENT BOND
1 JOB $ $
0002 LEVELING COURSE 100 SY $ $
0003 BITUMINOUS
PAVEMENT DAM
PARKING LOT
1700 SY $
1001 BITUMINOUS
PAVEMENT DAM
PARKING LOT –
PARKING STALLS –
AWARDABLE OPTION
1450 SY $
1002 LINE STRIPING AND
PARKING BUMPERS–
AWARDABLE OPTION
1 JOB $
Total $
2. MATERIALS
2.1. Bituminous Pavement
Bituminous surface treatment shall be supplied and placed in accordance with the applicable requirements of PADOT PUB 408, SECTION 413, with a nominal maximum aggregate size of 12.5mm.
2.2. Bituminous Leveling Course
2.3. Bituminous Course - Coarse Aggregate
Coarse aggregates shall consist of clean, sound durable particles of crushed limestone or washed gravel meeting the requirements of PADOT PUB 408 SECTION 703.2, type A
2.4. Bituminous Course – Fine Aggregate
Fine aggregates shall consist of natural sand or sand manufactured from stone or gravel meeting the requirements of PADOT PUB 408 SECTION 703.1.
2.5. Bituminous Course – Asphalt Binder
The asphalt binder shall conform to PADOT PUB 408 SECTION 413.2 (a) 1 “Virgin Mix”. It shall have a viscosity designation meeting SUPERPAVE PG64E-22.
2.6. Bituminous Tack Coat
The bituminous tack coat shall meet the requirements of PADOT PUB 408 SECTION 460 with a residual rate of 0.04-0.08 gal/sy, for “milled surface”
2.7. Line Paint
2.8. The line paint shall be “white” in color, meeting the requirements of PADOT PUB 408 SECTION 964
2.9. Aggregate Base
The aggregate base shall meet the requirements AASHTO No. 57 Coarse Aggregate
2.10. Traffic Counter Inductive Loop
A preformed wire loop for an existing traffic counter shall be supplied by the government
3. EXECUTION
3.1. Preparation
3.1.1. Bituminous Tack Coat
All areas that are to receive the bituminous surface treatment, and the interface between pavement layers, shall be sprayed with a bituminous tack coat. Immediately before applying the bituminous tack coat, remove all loose material from the surface to be treated by means of a power broom or blower. The surface shall be dry and clean at the time of treatment. The tack coat shall be applied uniformly at a residual rate of between 0.04-0.08 gallons per square yard of pavement surface.
3.1.2. Milling
Mill and dispose of existing bituminous surfacing material 1” in the visitors parking to accommodate 2” new wearing course. Mill pavement at transitions to accommodate new pavement depth. Dispose of material offsite.
Dispose material in accordance with Federal, State, and Local regulations. Provide documentation that material was properly disposed of.
Remove surface pavement and base course as indicated. Make cut square or rectangular with vertical straight faces. Make one pair of faces at right angles to traffic flow. Spray vertical surfaces with tack coat.
Mill and dispose of 1” of thin overlay material, across the site to accommodate new road material placement and adhesion. Increase milling depth to 2” at pavement transitions to ensure smooth transitions between existing pavement and new pavement.
Traffic counter wire loop at exit of Visitors Parking Lot shall be removed. Disconnect existing counter by cutting wire leads from counter. Reference “Traffic Counter Wire Loop” below for replacement details.
Dispose material in accordance with Federal, State, and Local regulations. Provide documentation that material was properly disposed of.
3.2. Construction
3.2.1. Leveling Course
Where indicated on the paving plan as approved by the ACO, place a leveling course ahead of resurfacing operations. Leveling course shall be placed for the full length of the maintenance building access road. Use the leveling course to fill wheel ruts and other local small depressions even with the surrounding pavement and to provide a relatively uniform working platform for placement of the surface treatment.
3.2.2. Traffic Counter Wire Loop
Prior to placement of bituminous overlay on eastern edge of visitors parking lot, place new preformed wire loop for TDS 50 traffic counter. Secure with asphalt sealant material to ensure no damage or movement occurs when placing bituminous overlay. Protect new wire leads from damage. Retain wire disconnects on the traffic counter, and remit to Resource Manager, Ryan Hill, for reconnection by others.
3.2.3. Bituminous Pavement
The bituminous pavement shall be applied in a manner so that uniform distribution is obtained over all the areas treated. Compaction and rolling equipment shall follow as closely behind the paving machine as possible. Areas inaccessible to rollers shall be compacted by mechanical vibratory tampers. Compaction shall continue until no marks or tracks are left from the compaction or rolling equipment. The bituminous surface course shall be constructed in one compacted lift equal to a minimum 2 inches in thickness. Unless otherwise directed, the bituminous pavement shall not be placed when temperature of the surface of the existing pavement is below 40 degrees F.
3.2.4. Bituminous Surface Treatment
The parking shall receive an overlay of bituminous surface treatment as indicated. Prior to the overlay, the existing asphalt shall be cleaned from dirt and debris and be coated with a bituminous tack coat as described above. No water shall be present prior to placement of overlay. Bituminous surface treatment shall be placed in accordance with the applicable requirements of PENNDOT PUB 408. The bituminous overlay shall be applied in a manner so that uniform distribution is obtained over all the areas treated. Compaction and rolling equipment shall follow as closely behind the paving machine as possible.
Areas inaccessible to rollers shall be compacted by mechanical vibratory tampers. Compaction shall continue until no marks or tracks are left from the compaction or rolling equipment. The bituminous surface treatment shall be constructed in one compacted lift equal to a minimum of 2 inches in thickness. Unless otherwise directed, the bituminous surface treatment overlay shall not be placed when temperature of the surface of the existing pavement is below 40 degrees F.
3.2.5. Thickness Control
As the bituminous layers is placed, the Contractor shall monitor the thickness to verify conformance with the design thicknesses. The thickness of the asphalt concrete wearing course shall be measured at intervals of no less than 25 linear feet along the centerline of the roadway or parking lot. The total measured thickness of the overlay shall be within +/- 1/4-inch of their total combined design thickness. The overlay areas that do not comply with the minimum thickness shall be removed and replaced by the Contractor. Such areas shall be corrected by removing the bituminous surface treatment to its full thickness and placing and compacting additional new overlay to the proper design thicknesses. No additional payment will be made for areas that receive additional thickness of bituminous surface treatment.
3.2.6. Existing Paving Interface
Where the new bituminous surface treatment pavement meets the existing pavement a straight, smooth sawcut joint shall be constructed. The surfaces of the existing pavement at the interface shall be cleaned of all loose material and dirt and treated with a bituminous tack coat at the residual rates specified in Section 2. Joints between old and new pavement shall be made in accordance with the applicable requirements of PA DOT specifications.
The hot-applied asphalt sealant shall be applied along each joint between the new and existing pavement sections for a minimum width of six inches on each side of the joint.
3.2.7. Pavement Markings
The Contractor shall develop a Parking Bumper Line Striping Plan, for ACO approval. The layout and spacing of the parking lot stall markings, and parking bumpers (quantity 45) shall match the existing layout. The visitors parking lot shall be remarked with parking lot stall markings according to the approved plan. The existing bumpers shall be removed and disposed of. New rubberized parking bumpers shall be procured and placed at existing parking bumper locations. The Contractor shall clean all visible loose or foreign material from the surface to be marked. The lines for the parking lot stall marking shall be continuous 4-inch wide white stripes. Paint shall be applied to clean, dry surfaces, and only when air and pavement temperatures are above 40 degrees F and less than 95 degrees F, or as otherwise specified by the manufacturer.
REFERENCE PHOTOS
Site Plan
ABBREVIATED QUALITY CONTROL PLAN
Location Project Contractor Name Contractor Address
1. SIGNATURE SHEET.
This QUALITY CONTROL PLAN was
Prepared By:
Name Title of Preparer
Approved By:
Name President/Owner
2. BACKGROUND INFORMATION
Contractor: Name Address City, State Zip
Contract Number W911WN-##-#-####
Project Name: Enter Name of Project
Project Description: Enter description of work
3. Organization Name of the (QCSM) Person will perform the duties and responsibilities of the Quality Control System Manager (QCSM) for this contract.
It is acknowledged that Name of the (QCSM) Person shall conduct 3-phase inspections for all the definable features of work.
The Name of the (QCSM) Person and the Quality Control staff reports to the project manager or someone higher (President or Owner of the Company) in the organization. List the name of the Individual that CQC reports too.
The Project Superintendent is Name the Superintendent. (if specs permit, the Superintendent may be the QCSM)
4. Personnel and Assignments Name of the (QCSM) Person Name of the (QCSM) Person and name the staff all work for the Name of the Contractor.
Provide the qualification of QCSM and any staff in a Resume format.
Name of the (QCSM) Person has the authority to stop work which is not in compliance with the contract. (See copy of letter) In addition to the above experience and/or education requirements the CQC System Manager must have completed the course entitled "Construction Quality Management for Contractors". This course is periodically offered by the Pittsburgh District and sponsored by the Contractors Association of Western Pennsylvania.
Completion of the course offered by other Corps of Engineers Districts will be accepted upon presentation of a valid certificate. Submit a copy of the Certificate.
Name of Superintendent
The Major definable features of work for this contract List the Major definable features of work for this contract.
Also list any test that may be required to be performed for each definable feature of work.
A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable feature under a particular section. This list will be agreed upon during the coordination meeting.
5. 3-Phase Control Inspections The Contractor Quality Control System Manager (CQC-SM) Name of the (QCSM) Person, will conduct a minimum of three phases of control for each definable feature of work to ensure that the construction, including sub-contractors and suppliers complies with the requirements of the contract. The three phases of control are:
Preparatory Phase Initial Phase Follow Up Phase
Three Phase Control Inspections will be tracked by the CQC-SM on the Three Phase Inspection Checklist included in the Attachments Section of this Plan.
Preparatory Phase Inspection After all required plans, documents and materials are approved and before work begins on each definable feature of work, a Preparatory Phase Inspection will be performed. The CQC-SM will conduct a meeting attended by the Contracting Officer, project superintendent, other QC personnel (as applicable), subcontractors, and the foreman responsible for the definable feature. The results of the preparatory phase actions will be documented by separate minutes prepared by the CQC-SM and attached to the Daily QC Report. The superintendent and/or foreman responsible for the work will instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.
The CQC-SM will prepare a Preparatory Inspection Checklist (see sample in Attachments Section of this plan) and submit it for approval to the Contracting Officer before any Preparatory Inspection Meetings. At least 48-hour notice will be provided to the government for all Preparatory Inspection Meetings.
Items covered-at- Preparatory Inspection Meetings will-be-as follows, - - A review of each paragraph of applicable Specifications.
A review of the Contract Drawings.
A check to ensure that all materials and/or equipment have been tested; submitted and approved.
A review of provisions that have been made to provide required control inspection and testing.
An examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.
A physical examination of required materials, equipment, and sample work to verify that all items are on hand, are properly stored and conform to the approved submittals.
A review of the appropriate Activity Hazard Analysis (AHA) to assure safety requirement is met.
A discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards.
Initial Phase Inspection At the beginning of a definable feature of work, Initial Phase Inspections will be performed by the QC Personnel assigned to the work. Initial Phase Inspections will be repeated for each new crew to work on site, or any time acceptable specified quality standards are not being met.
The Contracting Officer will be notified by the CQC-SM at least 48 hours in advance of beginning the Initial Phase Inspection. The CQC-SM will prepare an Initial Inspection Checklist (see sample in Attachments Section of this plan) to document the inspection and attach it to the Daily QC Report. The exact location of the Initial Inspection will be indicated for future reference and comparison with Follow-Up Inspections.
Items covered at Initial Phase Inspections will be as follows.
A check of work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.
A verification of the adequacy of controls to ensure full contract compliance. Verify required control inspection and testing.
Establish the level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required samples as appropriate.
Resolve all differences.
Check safety to include compliance with and upgrading of the Safety Plan and Activity Hazard Analysis (AHA).
Review the AHA with each worker.
Follow-up-Phase Inspection – Daily checks will be performed to assure control activities, including control testing are providing continued compliance with contract requirements until completion of the particular Feature of Work.
Those daily checks shall be documented on the Contractor's Daily Quality Control Report. Control testing reports shall be attached to the Daily Quality Control Report.
Final Follow-Up Inspections will be conducted, and all deficiencies corrected prior to the start of additional features of work that may be affected by the deficient work. All deficiencies will be addressed before follow-on work is initiated.
6. Completion Inspections Punch-Out Inspection Near the completion of all work or any increment thereof established in the contract, the Contractor Quality Control System Manager (CQC-SM) will conduct an inspection of the work and develop a punch list of items which do not conform to the approved drawings and specifications. The punch list of deficiencies will be provided to the Project Superintendent for corrections. The CQC-SM will make a second inspection to ensure that all deficiencies have been addressed. Once this is accomplished, the CQC-SM will notify the Contracting Officer that the work is ready for the Government
Pre-Final Inspection.
The government will perform this inspection to verify that the work is complete. A Government Pre-Final Punch List may be developed as a result of this inspection. The CQC-SM will ensure that items on this list have been corrected before notifying the Contracting Officer that the work is ready for Final Inspection.
Final Acceptance Inspection The CQC-SM will provide 14 - days’ notice to the Contracting Officer that the work is ready for Final Inspection.
The Contracting Officer will schedule the Final Inspection. The CQCSM, the Project Superintendent and the Contracting Officer will be in attendance.
7. Deficiency Tracking Procedures The CQC-SM will review inspections and tests conducted either by Name of the Contractor or subcontractors-for compliance with the contract-documents. Corrective-actions to repair unsatisfactory items will be monitored and documented using the following procedures.
a. Discrepancies in Contract Documents
The following procedures will be followed as soon as subcontractors, vendors or field personnel discover discrepancies in the contract documents or field layout.
CQC-SM will prepare a Request for Information (RFI) and submit it to the Contracting Officer for review and comment.
All RFls and government responses will be submitted and tracked electronically in the Construction
b. Deficiencies in Workmanship All Quality Control Representatives will report deficiencies in the work they are inspecting to the CQC-SM immediately for corrective action. The CQC-SM will report to the Contracting Officer immediately upon receiving reports from his field staff.
c. Tracking The QCS/RMS system will be used to track deficiencies. Deficiencies identified by the QC staff will be numerically tracked using QC punch list items. QCS will be used to maintain a current log of all QC punch list items. The Contracting Officer will track deficiencies they have identified using its QA punch list item log.