This document provides the statement of work for an indefinite delivery-type contract for architectural and engineering services for airfield design and evaluation worldwide. The contract will be awarded by the U.S. Army Corps of Engineers, Omaha District as multiple award task order contracts under NAICS code 541330. Services required under task orders may include airfield design, pavement testing and evaluation, geotechnical investigations, workshops, and specialized engineering studies for airfields, pavements, lighting and navigational aids. Task orders will require compliance with Unified Facilities Criteria, sustainable design standards, and quality control plans. The contractor must be registered in SAM under NAICS 541330. The period of performance and total contract value are not specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
Indefinite Delivery-Type Contract for
Architectural and Engineering Services for
Airfield Design and Evaluation
Worldwide
Solicitation No. W9128F22R0014
APPENDIX "A"
PERFORMANCE REOUIREMENTS FOR ARCHITECT-ENGINEER (A-E) SERVICES
1. GENERAL
This Appendix "A" supplements Block 6 of Standard Form 252 and sets forth the general requirements for the performance of the various services required under the contract. Projects may generally include horizontal and vertical airfield design, development of DOD criteria related to airfields/pavements, technical reviews of horizontal and vertical airfield designs, construction phase support services, pavement destructive and non-destructive testing, geotechnical subsurface investigations, field and laboratory testing of pavement materials (including petrographic investigations), airfield obstruction surveys, conducting airfield design/construction workshops, developing future planning requirements, specialized consulting services and engineering studies related to the planning, design and construction of airfields (pavements, airfield lighting and
NAVAIDS, etc.), design of roadways on military and non-military installations for the U.S. Army
Corps of Engineers (USACE) and other Government agencies. Each task order to be issued on this contract will fully describe the project to be designed or the studies to be accomplished and will identify all work to be accomplished. Services to be performed include, but are not limited to the following:
a. Preparation of plans, specifications and design analysis for the design, maintenance, or rehabilitation of horizontal and vertical airfield facilities including, but not limited to, airfield runways, taxiways and aprons, heliports, airfield lighting and navigational aids, airfield lighting vaults, ancillary structures for airfield lighting and navigation aids, unmanned aircraft systems
(UAS) facilities, aircraft arresting systems (AAS), hangars, roadways, storm drainage, utilities, etc. Design projects may include new facilities or repair and maintenance of existing facilities.
b. Development of DOD criteria related to airfields/pavements including, but not limited to, Unified
Facility Criteria (UFC) documents, Unified Facility Guide Specifications (UFGS), engineer technical letters (ETLs) and other military design criteria documents.
c. Technical reviews of horizontal and vertical airfield designs.
d. Construction Phase Support Services including, but not limited to, participation in on-site partnering/pre-construction meetings, review of construction contractor’s submittals for government approval and for information only, review of Contractor’s request for information
(RFI), participation in site visits and furnishing inspection reports at critical points of construction, participation in start-up and commissioning of systems, attending warranty inspections, participation in lessons-learned sessions, preparation of operations and maintenance support information manuals.
e. Pavement destructive and non-destructive testing/evaluations including, but not limited to, coring, petrographic analysis, falling weight deflectometer (FWD) testing, skid resistance testing, etc.
f. Pavement materials testing. Unless otherwise indicated in the Task Order Statement of Work, testing laboratories shall meet the following requirements: Any testing laboratories used for design or construction purposes shall be USACE validated. Laboratories for testing concrete and concrete aggregates shall conform to ASTM C1077. Concrete laboratory technicians, concrete strength testing technicians and concrete field testing technicians must be American Concrete
Institute (ACI) certified. Laboratories for testing asphalt pavement shall conform to ASTM
D3666 and shall participate in the AASHTO Materials Reference Laboratory (AMRL) program.
Laboratories for testing soil and rock shall conform to ASTM D3740.
g. Geotechnical subsurface investigations including, but not limited to, taking soil borings and/or test pits, preparing soil boring logs, ground penetrating radar (GPR) testing, preparing geotechnical investigation reports, etc..
h. Conducting airfield obstruction surveys.
i. Conducting airfield design/construction workshops.
j. Developing future planning requirements.
k. Specialized consulting services and engineering studies related to the planning, design and construction of airfields (pavements, airfield lighting and NAVAIDS, etc.).
General contract requirements are as outlined for the A-E services listed below:
a. Preparation of design/construction documents, preparation of design/build requests for proposals
(RFPs), charrette/concept designs, design reviews, schematic designs, planning, programming, site investigations, surveying and geotechnical investigations, space planning, interior design, parametric and construction cost estimating, feasibility studies, National Environmental Policy
Act (NEPA) documents, plan formulation, etc.
b. Compliance with laws, regulations, Using Service criteria, or other critical project criteria as related to general project design and construction, and for special asbestos/lead paint removal, underground storage tank removal/replacement, and permitting required for project construction.
c. Development of construction cost estimates using the Computer Aided Cost Estimating System
2nd Generation (MII) software.
d. All specifications shall be developed and edited using the SpecsIntact automated specification processing system. Specifications shall be provided to the Government in the native SpecsIntact format, Microsoft Word format, and/or Adobe (.pdf) format as specified in the task order statement of work.
e. Task orders may require Building Information Modeling (BIM) or traditional Computer Aided
Design (CAD). In addition, task orders may require the use of Construction Operations Building
Information Exchange (COBie).
f. The A-E may be required to use the Dr Check’s design review and checking system
(http://www.projnet.org/drchecks/). Permissions and passwords will be distributed on a project-by-project basis.
g. Use of “Green Building” or sustainable design concepts including energy efficiency, use of recovered materials, waste reduction and pollution prevention in facility design.
h. Construction phase services, such as submittal reviews, commissioning, contractor oversight, etc.
i. Integration of current Antiterrorism and Force Protection (AT/FP) measures will be required on all military design projects.
2. DESIGN SERVICES
The A-E shall perform all or part of the following design services as identified below and in specific task orders under this contract. Each task order will have its own scope of services and will be provided to the
A-E at the initiation of a task order:
a. Obtain necessary permits, licenses and approval from all local, State and Federal authorities as are necessary for the performance of the A-E's services. Should it become necessary during the performance of the work and services for the A-E to secure the right of ingress and egress on properties not owned or controlled by the Government, the A-E shall secure the consent of the owner, his representative, or agent, prior to effecting entry on such property;
b. Utilize Government designs (where appropriate and applicable), drawings, specifications, criteria, and standards for buildings and other structures as necessary to meet the requirements of the approved layout of the proposed project;
c. Prepare preliminary studies, sketches, and layout plans and reports including the estimated cost of the proposed project and of all structures, utilities, and appurtenances thereto;
d. Accomplish the various work features as described in individual task orders to be issued.
3. OTHER SERVICES
The A-E shall perform the other services identified below and in specific task orders:
a. During the project construction period, check all shop drawings, materials, fixtures, equipment, samples, plant materials and color schedules submitted by the Constructor and approve or reject such items in accordance with the determination of their conformity to the contract plans and specifications;
b. During the project construction period, provide construction inspection services for the acceptability of materials, such as railroad track rails and ties, and conformance of the work to the plans and specifications. Work may include maintaining and/or revising contract CAD drawings to provide a record of “As-Built" conditions for the project;
c. Following completion of construction, develop and provide to the Government a complete set of record drawings that reflect the “As-Built” conditions of the project.
4. ARCHITECT-ENGINEER SERVICES
The A-E shall perform all work required to accomplish the intent of each task order, and unless otherwise specifically provided, shall perform the required services in accordance with the following requirements:
a. Studies and Reports
(1) Investigations. All field and office work as required to accomplish specific studies shall be performed;
(2) Submittal Materials. Drawings, documents, and computer prepared models and files shall be prepared as required to present the details and results of the study. Drawings and sketches shall be prepared in accordance with the specific task order;
(3) Reports. Reports shall present the following as a minimum:
(a) Discussion of the study and investigation;
(b) Description of all plans and schemes considered for obtaining the desired end result of the study;
(c) All drawings, designs, computer files and models required to present and illustrate the details and results of the study;
(d) Required estimates of construction costs, including comparative costs for indicated alternate plans and schemes;
(e) Results, conclusions and recommendations.
b. Preliminary Designs and Site Plans. Prepare preliminary designs based upon the project criteria and instructions provided by the requirements of the task order. Preliminary designs are required for all features of the project, including the siting of facilities, except as noted as subparagraph (3) below:
(1) Charrette. As part of preliminary design the A-E may be required to conduct a design charrette for a project. The design charrette process produces graphical solutions of specific project requirements. During the charrette the Using Service, Government project manager, and the A-E will collaborate to define project requirements and produce alternative solutions to accommodate all requirements. On the last day of the charrette the A-E will present the design to the Using Service and the Government Project Manager, who will review, approve/disapprove and recommend further revisions to the A-E. One solution incorporating the revisions will be selected for further development. This solution will be presented in a formal document defined as the Project Definition document;
(2) Preliminary designs shall be submitted as scale line drawings prepared at contract plan scale on media as required in the specific task order and provided design guidance. Plans shall be in sufficient detail to show adequacy of design, the utilization of the item involved, and conformance of the design with the intent of the project as set forth in the instructions;
(3) For facilities involving site adaptation of available plans, preliminary designs are not required for any construction feature that will be incorporated in the project without change from the design shown on the basic plans. Hence, if the plans can be site adapted without changes in the superstructures, preliminary designs are not required for the superstructure. If project criteria requires modifications to the superstructure, preliminary designs are required for the modifications only;
(4) Site Plans
(a) General. Prepare and submit site plans showing the location of each proposed runway, taxiway, apron, helipad, building and facility, critical grades, contours, drainage and relation of buildings and facilities to existing buildings, facilities, street systems, above and underground utilities, entrances and finished grades. Existing grades shall be included. Cultural features shall be indicated. At locations where survey control
(coordinate systems or base lines) have been established, runways, taxiways, aprons, helipads, buildings and facilities shall be tied-in to such control.
(b) Preliminary Submission. At the earliest practicable date, and in no case later than the limiting dates established in task orders, the A-E shall submit for preliminary approval the site plans developed to the extent necessary to show the siting of each building or facility involved in relation to adjacent buildings, facilities and street systems.
(c) Final Submission. Upon Government review and approval of the preliminary submission of the site plans, the A-E shall complete the site plans to include all details indicated in
(a) above and to include any changes directed with the preliminary approval.
(5) Design Analysis. Prepare and submit, for original designs to be accomplished by the A-E, a basis-of-design showing typical analyses for basic parts of the project, including geotechnical, architectural, structural, mechanical and electrical features and each utility and stating all loadings, hydraulic computations including computations for deluge sprinkler systems, criteria, factors, assumptions and codes on which the design is to be based. Where applicable, the Design Analysis shall include the planned utilization, relocation or removal of existing facilities. The A-E Firm will provide a separate chapter in the design report devoted to the findings of all external design. This document should include a copy of the review comments, summaries of reviewer’s evaluation of the design, lessons learned, etc.
(6) Preliminary Cost Estimates. If it is determined that the project cannot be constructed within the target construction cost, the Contracting Officer shall be so advised, and the A-E will be instructed as to the action to be taken.
c. Final Design
(1) Accomplish the final detail design of the project complete with all component parts and appurtenances. The final designs shall be based upon the project criteria and where furnished or required, upon approved preliminary design and subsequent direction;
(2) For structures involving site adaptation of plans, the final design shall be for all modifications, addition and appurtenances required adapting the design of structures as shown on the plans to local site conditions;
(3) Prepare and submit final design analyses for all original designs, comprising statements of all criteria, loads, factors, assumptions and codes used in the final design, diagrams and charts developed in connection with designs, and the computations made thereon;
(4) Drawings. Prepare complete detailed drawings for use in the contract construction of the project. Final drawings shall be based on approved designs and layouts and shall be prepared in accordance with the task order and placed on the media required under the specific task order.
(a) The drawings will be sufficiently complete to permit meaningful evaluation of such items as mechanical systems, and electrical systems and include scaled architectural floor plans, furniture footprints, roof plans, building exterior elevations showing approved architectural treatment, building sections, typical wall tabulation of all net areas for space limited by criteria of program, structural plans, mechanical plans, electrical plans, site plans, and landscaping plans. The coordinates of ties to base lines of at least two adjacent corners of each building and structure and of principal points on utility lines, roads, railroads, pavements and similar construction features shall be shown on the drawings.
(b) The contract drawings will be furnished for approval and shall be prepared for the entire project and shall provide for the solicitation of bids and award of construction contracts in accordance with the provisions of the developed contract specifications. Contract drawings shall incorporate applicable sheets of existing construction drawings being adapted with necessary modifications.
(5) Contract Specifications. Prepare complete specifications for the contract construction of the entire project. The contract specifications shall be prepared in a single volume covering all items of work. The volume shall include the complete Statement of Work, Special
Conditions and Technical Provisions and a list of Bid Items and Quantities for the project involved. The intent is to prepare complete specifications in such a manner that the project construction included in a specification volume may be readily advertised for bids and contracted for as a whole or in parts. The Project Manager shall be consulted in developing the bid items. Bid items shall be developed so that total construction costs of line items may be determined.
(a) Basic standards necessary for use in preparation of the Special Conditions and the format to be used in preparing the Statement of Work will be furnished by the Government for specific task orders.
(b) The Technical Provisions shall comprise a master technical specification covering all items of work common to all line items included under the task order, and shall be prepared with separate sections covering the various trades and work classification. The sequence of material shall be in the same order as that used in the guide specifications unless directed to do otherwise. Where applicable technical provisions shall be based upon specifications listed for use in the task order.
(c) Prepare and submit for review a loose-bound draft (copy) of the contract specifications in which will be appropriately placed marked-up copies of the printed Guide Specifications.
Those deleted portions of the Guide Specifications shall be left legible so as to determine what has been eliminated. Sections modified to meet site or specific project conditions shall be spelled out and inserted in their proper place. When specifically provided in the task order, drafts of modifications to Technical Provisions contained in specifications furnished by the Government may be submitted without furnishing the entire Technical
Provision.
(d) Final specifications, including complete technical provisions, shall be submitted on media specified under the task order.
(e) Construction Contractor's Submittals. A schedule of Construction Contractor's Submittals shall be prepared listing all shop drawings, samples, materials, fixtures, equipment, plant materials and color schedules to be submitted and all tests to be performed by the
Construction Contractor in accordance with the contract specifications. Each item listed shall be referenced to the paragraph in the contract specifications which requires the contractor's action.
(6) Design Analysis. Prepare and submit, for original designs to be accomplished by the A-E, a basis-of-design showing typical analyses for basic parts of the project, including geotechnical, civil, architectural, structural, mechanical and electrical features and each utility and stating all loadings, hydraulic computations including computations for deluge sprinkler systems, criteria, factors, assumptions and codes on which the design is to be based. Where applicable, the Design Analysis should include the planned utilization, relocation or removal of existing facilities. The A-E Firm will provide a separate chapter in the design report devoted to the findings of all external design. This document should include a copy of the review comments, summaries of reviewer’s evaluation of the design, lessons learned, etc.
(7) Final Cost Estimates. The A-E shall submit a professional quality cost estimate in accordance with the policies and procedures stated in the Task Order. Estimates of construction costs shall be prepared in accordance with proposed bidding schedule.
(8) Engineering Advice during Construction Period. Furnish, during the project construction period, such engineering advice in connection with the design as may be requested.
d. Cost Estimates. The A-E shall submit a professional quality cost estimate in accordance with the policies and procedures stated in the referenced Task Order. All estimates shall be independently prepared and reviewed by personnel who are trained and experienced in construction cost estimating. The A-E shall obtain assistance from firms specializing in cost estimating if its own firm is not adequately staffed to prepare the required cost estimates to the detail required.
5. COORDINATION AND EXECUTION OF WORK
a. During the execution of the work under each task order, the A-E shall keep in close liaison with the Government Project Manager and will coordinate the work with the Using Service and other agencies. All requests made by the Using Service and other agencies shall be referred to the
Project Manager for coordination with the Contracting Officer Representative.
b. All work shall be in accordance with the engineering instructions, directives, guide specifications, drawings, technical manuals and other furnished instructions.
c. The design of each project shall be the most economical with necessary consideration being given to the most efficient utilization of all materials consistent with the design criteria including
“Green Building” design concepts for energy efficiency, use of recovered materials, waste reduction, and pollution prevention in facility design.
d. The use of critical and strategic materials not otherwise restricted shall be limited to the minimum amounts required consistent with Corps of Engineers Conversation of Materials Policies and full consideration shall be given to the use of substitute materials as permitted by the Unified
Facilities Criteria and the Unified Facilities Guide Specifications.
e. Where not expressly specified, drawing scales shall be as approved by the Government Project
Manager.
f. After submission of the contract plans and specifications and cost estimates, the A-E shall make any corrections thereto as may be necessary because of errors or omissions, including the preparation of addenda during the bidding period that may be required as a result of such deficiencies.
g. The A-E shall make all visits to the sites of work as may be required to accomplish the work under the task orders.
h. The A-E's fee shall include the cost of all engineering, special studies, consultant services, laboratory work, travel and reproduction required to accomplish the work under the task orders.
i. The Government will furnish the general siting concepts of all facilities to be designed unless in specific cases it requests the A-E to develop general siting concepts for facilities.
j. The target construction cost set forth in a task order is the amount of funds estimated for the construction of the project involved and is not to be exceeded unless directed to do so. Every effort is to be exerted to develop a design within the project criteria and instructions so that the project may be constructed within the target cost. If, as the work progresses, it is determined that the project cannot be constructed within the target construction cost or subsequently approved preliminary cost estimates, the Contracting officer shall be so advised, and the A-E will be instructed as to the action to be taken.
k. The A-E shall advise the Government of any discrepancies, ambiguities and lack of clarity noted in plans and specifications furnished for use in connection with the project.
l. The time required by the Government to review submissions made the by the A-E under this contract will vary by task order. The review periods established in the completion schedule set forth under a task order are the maximum anticipated periods required.
m. Review of Progress and Technical Adequacy. At appropriate times, representatives of the
Contracting Officer may review the progress and technical adequacy of the work under this contract. Such review will not relieve the A-E from performing all contract requirements, except as may be waived by written instruction. The A-E under this contract will interpose neither objection nor restriction to the Contracting Officer's designation of another A-E for the purpose of reviewing the adequacy, coordination and correctness of the work performed under this contract.
6. DESIGN QUALITY MANAGEMENT
The A-E will maintain a quality management plan that includes overall implementation of the firm’s quality management program to include quality control and quality assurance practices and the quality management organization and processes that will be utilized for work to be performed under this contract. The A-E will outline the procedures to be used for interfacing between the prime A-E and their subcontractors. This plan should identify when key reviews occur during design development, how lessons learned are incorporated, and how design deficiencies are tracked and handled. The plan shall describe a quality control organization with names of individuals, responsibilities, and chains of authority. It shall describe who is responsible for internal quality control reporting, and the quality control reporting to the Government. The quality management plan will be submitted with the first task order issued to the A-E and resubmitted whenever revised. Upon request, the A-E will expediently provide documents/records related to execution of their internal quality management practices to include, but not limited to, review plans, quality control review comments and resolutions, review sign-off sheets, internal quality assurance documentation, etc.
The A-E will submit for evaluation and concurrence a project specific Quality Control Plan (QCP) for contract services required under each task order. The QCP must be prepared in accordance with ER
1110-1-12.The QCP will include quality objectives, organization and responsibilities, quality control processes and activities, and certifications. The QCP will reflect the firm’s existing internal processes, but the plan should include the concept of design checks, interdisciplinary checks, and independent technical review. Bidability, constructability, operability, environmental, and sustainability (BCOES) reviews will be performed for any design that would lead to a constructed project. The QCP needs to differentiate between the A-E internal quality control reviews and external reviews (e.g., customer, regulatory, etc.) and/or USACE quality assurance reviews that may occur at various design phases. The QCP will be in place before work begins on the task order.
The QCP for each task order will include, but is not limited to, the following information:
a. Background Information (e.g., project name, project location, project number/designation, customer, type (e.g., MILCON, FSRM, etc.)
b. Project Scope (e.g., project description; design, regulatory, and customer criteria; quality objectives; deliverables (e.g., plans, specifications, cost estimate, operations and maintenance plan, design documentation report); etc.)
c. Risk Assessment (e.g., assessment of anticipated or potential challenges or issues related to technical complexity, funding/cost, schedule, regulatory actions, political considerations, sensitive or high visibility items, issues/concerns requiring special attention, and associated mitigation strategies)
d. Quality Control Review Requirements (e.g., number and types of reviews, internal vs. external reviews, products to be reviewed, review schedule, etc.)
e. Project Development Team (e.g., design team and review team members, organization and responsibilities)
f. Records and Document Control (e.g., how internal/external comments will be documented and closed, how reviews will be documented; record retention; etc.)
g. Quality Control Certifications. The A-E firm shall provide certification that is signed and dated by the primary A-E firm and their consultants for each product delivery.
“The products included with this deliverable were completed in accordance with the scope-of-work, approved quality management plan and project specific quality control plan. All applicable quality control reviews have been completed as stated in the quality control plan. Our Company believes this product is in compliance with all applicable criteria and the stated scope of work. Incomplete work will be added to this product at no additional cost to the government.”
7. GOVERNMENT QUALITY ASSURANCE
The Government will review documents prepared by the A-E to ensure contract compliance and to verify that the appropriate criteria and assumptions were used. This effort should be performed to the degree necessary to satisfy the Government that it is receiving a full response to contract requirements. Government quality assurance reviews are not an extension of the A-E internal quality control processes. If, after a quality assurance review has been completed by the Government, it is determined that any portion of the design is technically deficient or otherwise not in compliance with contract requirements, the Government will require the A-E to revise and resubmit.
8. ERRORS IN DESIGN
The A-E Firm is totally responsible for the product being developed, and any review performed by the Government does not relieve the A-E from their design liability. If in the opinion of the
Contracting Officer, an error which is clearly the fault of the A-E is encountered in the design plans during the construction stage of the project, the Contracting Officer may direct the A-E to immediately contact the Area Engineer or other Government representatives at the site of the project for the purpose of rectifying the mistake. The A-E shall perform such services in the manner directed by the Contracting Officer at no additional cost to the Government and on an expedited schedule. In the event that the A-E should dispute the Contracting Officer’s decision in this regard, it shall be considered a dispute, and pending final decision of the dispute, the A-E shall proceed diligently with the work and services in accordance with the decision of the Contracting Officer.
9. PROFESSIONAL REGISTRATION
The A-E will submit for evaluation and concurrence and under separate cover with the fee proposal for each task order, the names and professional registration status of individual designers assigned to each task order. At time of advertisement, registered personnel representing each discipline involved in the design will sign, date, and seal the drawing cover sheet in the signature block provided by the
Government. At the request of the Government Project Manager, registered personnel will sign, date, and seal selected advertised drawings, and new amendment drawings. These documents, along with the electronic drawing files, will be submitted to the Government.
10. TECHNICAL CRITERIA
a. CAD/BIM. BIM or traditional CAD may be used for projects under this contract. Disciplines required for BIM are Architecture, Interior Design, Structural, Mechanical, Electrical, Civil and
Cost Engineering. BIM products shall be produced and delivered in the current version of either the Bentley BIM (DGN) or (the previous year’s version of the most current) Autodesk Revit BIM
(RVT)/Civil3D (DWG) and with imodels (.i.dgn) files for all model submittals as specified in each task order. Traditional deliverables, if required for individual task orders, shall include
Microstation (DGN) or AutoCAD (DWG) files as specified in each task order. The A-E must use the latest version of the A/E/C CAD Standard and the latest Workspace and Templates (project folder structure shall be the same for both Autodesk Revit/Civil3D and Bentley AECOsim
Building Designer/InRoads projects as provided by the Workspace). Standards are available from the CAD BIM Technology Center at https://cadbimcenter.erdc.dren.mil/. The A-E will provide all required submittals of the latest Attachment F and the Project Execution Plan (PxP) before doing any work. The A-E shall have a firm working knowledge and incorporate the requirements of ECB 2013-18 on BIM/CIM projects.
b. Sustainable Design. Sustainable Design shall be accomplished using an integrated design approach and emphasizing environmental stewardship; energy and water conservation and efficiency; use of alternative energy, use of recovered and recycled materials; waste reduction;
reduction or elimination of toxic and harmful substances in facilities construction and operation;
efficiency in resource and materials utilization; development of health, safe and productive work environments. Integration of Federal and agency energy and sustainable mandates is required on all building facilities. Design and documentation shall utilize United States Green Building
Council Design evaluation and Green Certification Institute web-based certification methodology.
Working knowledge and familiarity with other sustainability validation systems similar to https://cadbimcenter.erdc.dren.mil/
USGBC and Energy Star is encouraged. The A-E may also be required to perform and evaluate sustainability and energy audits.
c. Design Criteria. Unified Facilities Criteria (UFC) and other DoD criteria can be downloaded from the Whole Building Design Guide website (http://www.wbdg.org).
d. Unified Facilities Guide Specifications (UFGS). UFGS can be downloaded from the Whole
Building Design Guide website (http://www.wbdg.org). SpecsIntact software for editing UFGS may be downloaded from the SpecsIntact website (http://specsintact.ksc.nasa.gov).
11. ORDERING INFORMATION
a. Any agency wishing to utilize this contract must comply with the requirements stated herein. The
Transportation Systems Center located within the Omaha District will authorize use of this contract.
b. Task Orders issued against this contract will utilize the DD Form 1155 and all applicable contractual documents thereto.
c. The cumulative amount of all orders and modifications to orders, as applicable, cannot exceed the total amount authorized basic IDIQ award amount.
d. Task Orders issued against this contract must utilize the disciplines and rates negotiated for each, shown on the Payments Clause, of the then current performance period. Disciplines other than those negotiated and shown on the Payments Clause shall be negotiated separately with each task order.
e. Authority for each individual Task Order shall be vested in the Contracting Officer for the
USACE District, USACE Laboratory, Air Force Contracting Agency or any other Government agency issuing the order. Likewise, all authority for payment for services of an individually issued Task Order rests with the issuing agency.
12. GOVERNMENT RESPONSIBILITY
a. Government ordering offices shall provide a signed copy of the Task Order to the A-E, prior to any work being accomplished. The A-E Contractor is NOT authorized to commence with any work without a copy of the Task Order in hand.
b. Upon issuance of a Task Order, the ordering office will email a copy of the task order to the
Transportation Systems Center. All copies must be descriptive enough to determine what was ordered by the ordering office.
13. CONTRACTOR RESPONSIBILITY
a. Tracking of Monetary Limitations. The Contractor shall keep and maintain accurate records of all Task Orders, including modifications to such, issued against this contract insuring that the total amount does not exceed the total authorized basic IDIQ award amount. When it appears that limitation could be exceeded, based on current work requirements, the Contractor shall notify the ordering office of the task order project manager and the Omaha District Contracting Officer.
b. The Contractor is responsible to commence with and prosecute the work expeditiously, meeting all deliverable and completion dates agreed to during negotiations of an order.
c. Common Clauses for AT-OPSEC in work occurring OCONUS:
Clause 3: AT Awareness Training for Contractor Personnel Traveling Overseas. All US based contractor employees and associated sub-contractor employees traveling overseas will receive the government provided AOR specific AT awareness training. The documentation of training completion must be provided to the COR prior to departure.
Clause 2: For Contracts Requiring Performance or Delivery in a Foreign Country. All non-local contracting personnel will comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task force commander policies and directives.
14. CONTRACT INVOICING AND PAYMENT
a. Invoicing shall be mailed to the agency address shown in Block 14 of each individual task order.
b. Payment shall be made by the agency address shown in Block 15 of each individual task.