Attachment_1_Umbagog_Demolition_Dumpsters_SOW.pdf
PDF 130 KB Posted
- Attached to
- Demolition dumpster services at Umbagog NWR NH
- Solicitation number
- 140FS326Q0063
About this file
This is a Statement of Work for dumpster rental and disposal services at Umbagog National Wildlife Refuge in Errol, NH. The Government requires a contractor to provide 30-yard dumpsters for disposal of general demolition debris from multiple structures within a 10-mile radius of the refuge headquarters. Acceptable materials include wood, roofing materials, drywall, flooring, siding, insulation, and miscellaneous construction materials. Hazardous materials including asbestos, lead-based paint debris, fuels, oils, refrigerants, and regulated waste are explicitly excluded. The project timeline runs from May 25 through September 25, 2026, with demolition activities expected to take approximately two weeks or less.
Pricing shall be provided on three components: initial delivery fee (if applicable), per-haul fee (including full removal and empty return/swap out), and per-ton disposal fee. The contractor must be capable of staging up to three dumpsters simultaneously and supporting up to eight swap-outs per day during peak operations with a maximum 4-hour response time during normal business hours (8 AM–4 PM, Monday–Friday). All fees, hauling, disposal, and permitting costs are included in the pricing. Documentation requirements include written tickets upon dumpster arrival and departure, notification of disposal weights within 24 hours, and itemized invoices with scale tickets attached. The contractor assumes full responsibility for transport, recycling, and disposal in accordance with federal, state, and local regulations. The Government reserves the right to suspend operations due to weather or operational requirements without penalty, and all standby or idle fees must be disclosed in advance. For additional information, potential contractors should contact Darren Stover, Logistics Management Specialist, at 302-222-7598 or darren_stover@fws.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS326Q0063.pdf | ||
| Attachment_3_Past_Performance_Survey.pdf | ||
| Attachment_2_Wage_Determination.pdf | ||
| Attachment_4_Bid_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DUMPSTER RENTAL AND DISPOSAL
FOR
UMBAGOG NWR
2756 Dam Rd, Errol, NH 03579
PART A – GENERAL INFORMATION AND INSTRUCTIONS
GENERAL DESCRIPTION OF WORK: Provide dumpsters to aid in the disposal of demolition debris from several structures within a 10 miles radius of the address listed above.
PART B – PERFORMANCE REQUIREMENTS
Dumpsters by material type: General Demolition Debris (30 yds dumpsters) General demolition debris may include wood, roofing materials, drywall, flooring, siding, insulation, and miscellaneous construction materials. Hazardous materials (including asbestos, lead-based paint debris requiring special handling, fuels, oils, refrigerants, or regulated waste) are excluded from this contract.
Pricing provided based on the following for General Construction Debris Materials:
1. Initial Delivery Fee (if applicable)
2. Per Haul Fee (Fee to include full removal and empty return – ie. swap out)
3. Per Ton Disposal Fee
Dumpsters will be provided on an as needed basis; contractor shall be capable of providing and staging up to three (3) dumpsters on site simultaneously when requested. Pricing will include all fees and charges associated with dumpster handling - ie. hauling, disposal, permitting (if necessary), etc. The expectation is that all dumpsters necessary to complete the project will be coordinated and completed from May 25 – September 25, 2026. The contractor must have sufficient fleet capacity to support up to eight (8) swap-outs per day during peak demolition operations with a maximum response time of 4 hours during normal business hours.
Coordination of deliveries and pickup will be done through refuge staff while the job is being completed. General refuge hours are 8AM – 4PM Monday – Friday. The demolition task is expected to take two weeks or less.
PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION
DOCUMENTATION AND REPORTING: A written ticket will be provided to refuge staff as dumpsters arrive and exit to ensure load counts are accurate. The weights for disposal for general debris will not be known at the time of departure; however, refuge staff will be notified within 24 hours of disposal weights. Sorted materials will be recycled to the maximum extent possible to divert as much waste from landfills. All local and state transportation regulations apply. Title to debris transfers to the contractor upon removal from Government property. The Contractor assumes responsibility for proper transport, recycling, and disposal in accordance with all applicable federal, state, and local regulations.
Invoices shall itemize delivery fees, swap/haul charges, tonnage disposed (with scale tickets attached), and applicable taxes or surcharges. Payment will be made based on verified weights.
The Government reserves the right to suspend operations due to weather or operational requirements without penalty.
Standby or idle fees must be disclosed in advance.
CONTACT INFORMATION: Possible contractors are encouraged to contact Darren Stover, Logistics Management Specialist at 302-222-7598 or darren_stover@fws.gov for additional information or site-specific requirements.
mailto:darren_stover@fws.gov
File details come from the government source that posted it. Updated .