About this file
This document outlines a supply requirement for materials to replace a deck and railing at the Arthur R. Marshall Loxahatchee National Wildlife Refuge in Boynton Beach, Florida. The Fish and Wildlife Service is seeking to procure lumber, composite decking boards, pressure treated wooden posts, wire mesh, fasteners and hardware, sandpaper, saw blades, and other tools to replace the existing wooden deck and railing at the C6 pavilion. The materials will be stockpiled at the refuge shop warehouse until a Fish and Wildlife Service maintenance team is available to perform the replacement work during fall/winter 2023. The related federal contract opportunity is solicitation number 140FS323Q0202 for deck and railing materials at Loxahatchee NWR, issued by the Department of Interior Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3-_Quote_Schedule-rev1_0002.docx | DOCX document | |
| Sol_140FS323Q0202_Amd_0002.pdf | ||
| Attachment_1-_Supply_Requirement_rev1_0002.pdf | ||
| Sol_140FS323Q0202_Amd_0001.pdf | ||
| Attachment_3-_Quote_Schedule.docx | DOCX document | |
| Attachment_2-_Past_Performance_Data_.docx | DOCX document | |
| Sol_140FS323Q0202.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supply Requirement Provide Materials to Replace Deck and Railing on C6 Pavilion
1. General:
Replace deck and railing on the C6 Pavilion at the Arthur R. Marshall Loxahatchee NWR, 10216 Lee Road, Boynton Beach, FL 33473-4797. NAICS code 238350.
1.1 Purpose/End Application:
The purpose of this project is to provide the materials needed to replace the wooded deck and railing at the C6 pavilion. Existing wooden deck material is rotten in many places and requires constant maintenance. Composite decking is needed to provide greater longevity and reduce maintenance costs and safety concerns. Existing railing is wooden stile and rail and will be replaced with wire mesh supported by pressure-treated wooden posts capped by a composite top rail. This is a DM project assigned WO F2023478044.
1.3 Other: Include, a relevant statutory authority, regulations, and/or references, pertinent background materials, or other relevant info.
Category Description Size Quantity
Lumber
Pressure Treated
2in x 10in x 12ft 15 2in x 12in x 12ft 15 2in x 4in x 12ft 70 4in x 4in x10ft 40
Trek Decking Boards 1in x 6in x 20ft 300 Telephone Poles 20ft 20
Stainless Steel Screws
T25 bit 2 ½ inch 47lbs T25 bit 3 inch 17lbs
Fasteners
SS Joist Hangers Single board 27 SS Through Bolts 8in. w/ ½ in.
diameter
SS Washers ½ inch 308 SS Nuts ½ inch 154 Staples 1/4 in. x 1-1/2 in. 1,500
Tool Accessories
T25 Bits T25 30 SQ2 Bits SQ2 30 Countersink Bits #6/#8/#10 1 pack (3 piece) Circular Saw Blade Laminate/Aluminum/Plastics
12 in. x 96-Tooth 1
Framing Circular Saw Blade 7-1/4 in. x 24- Tooth
SAWZALL Demolition Nail-Embedded Wood and Metal Cutting Bi-Metal Reciprocating Saw Blade Set
1 pack (13 piece)
Jig Saw Blade Set 1 pack (20 piece) 120-Grit Universal Hole Random Orbital Sanding Disc with Hook and Lock Backing
5 in. 120 grit 50 piece
60-Grit Universal Hole Random Orbital Sanding Disc with Hook and Lock Backing
5 in. 60 grit 50 piece
Vinyl Coated Wire Mesh 11 gauge, 2" x 4" mesh, 36" x 100'
3 rolls
2. Place of Performance and Period of Performance
Arthur R. Marshall Loxahatchee NWR 10216 Lee Road Boynton Beach, FL 33473-4797
Worked will be performed on the C6 pavilion which is located on the south side of Lee Rd.
Work will be performed by FWS staff, either Lox’s GAOA Team and/or a MAT Team, during the Fall/Winter of 2023. The pavilion will be closed off in sections while the work is being performed.
2.3 Normal duty hours Monday thru Friday 7:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 Materials will be stockpiled in the shop wareyard until a FWS maintenance team is available to do the work.
4. Deliverables and/or Delivery Schedule:
4.1 Materials will be stockpiled in the shop wareyard until a FWS maintenance team is available to do the work.
5. Technical Coordinators:
Jamie Schieler, Wildlife Refuge Specialist Arthur R. Marshall Loxahatchee NWR 10216 Lee Road Boynton Beach, FL 33473-4797 jamie_schieler@fws.gov
(561) 735-6027
Steve Henry, Deputy Project Leader Arthur R. Marshall Loxahatchee NWR 10216 Lee Road Boynton Beach, FL 33473-4797 steven_s_henry@fws.gov
(561) 735-6021
| Supply Requirement |
| 1. General: |
| 2. Place of Performance and Period of Performance |
| Arthur R. Marshall Loxahatchee NWR |
| 10216 Lee Road |
| Boynton Beach, FL 33473-4797 |
| Worked will be performed on the C6 pavilion which is located on the south side of Lee Rd. Work will be performed by FWS staff, either Lox’s GAOA Team and/or a MAT Team, during the Fall/Winter of 2023. The pavilion will be closed off in sections while... |
| 2.3 Normal duty hours Monday thru Friday 7:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information. |
| 2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day). |
| 3. Scope |
| 4. Deliverables and/or Delivery Schedule: |
File details come from the government source that posted it. Updated .