Attachment_1_-_Stellar_Creek_Road_Repair_Technical_Specifications.pdf

PDF 349 KB Posted

Attached to
GAOA STELLAR CREEK ROAD REPAIR
Solicitation number
140L3622R0001
Issued by

About this file

This solicitation seeks proposals for construction services along Stellar Creek Road on Bureau of Land Management lands in Montana. The base schedule includes road grading, culvert and cattle guard replacement, excavation, and revegetation. Additive alternatives provide for crushed surfacing along portions or the entire roadway. Proposals are due March 8, 2022 to the BLM Montana State Office. A single award will be made to the lowest-price technically acceptable offeror under a firm-fixed price contract. The work is estimated between $500,000 to $1,000,000 and is set aside for small businesses. The contractor must begin by May 2, 2022 and complete by August 30, 2022. Inquiries should be directed to the point of contact provided. Offerors must register in SAM and submit payment requests through IPP unless waived.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Specifications for

Stellar Creek Road Repair

BUREAU OF LAND MANAGEMENT

111 Garryowen Road

Miles City, Montana 59301

October 2021

TABLE OF CONTENTS

TABLE OF CONTENTS

CONTRACT SPECIFICATIONS PAGES

Statement of Work ................................................................................................ 1 thru 13

CONTRACT DRAWINGS

Cover Sheet ............................................................................................................. 1 thru 1 Location Map .......................................................................................................... 2 thru 2 Base Bid Site Map ................................................................................................... 3 thru 3 Additive Alternate Site Map .................................................................................... 4 thru 4 Culvert Summary Frames ....................................................................................... 5 thru 5 Culvert & Cattle Guard Details ............................................................................... 6 thru 6 Cattle Guard Detail ................................................................................................. 7 thru 7 Low Water Crossing Detail ...................................................................................... 8 thru 8 Head Cut Detail ....................................................................................................... 9 thru 9 Typical Sections ................................................................................................... 10 thru 10 Base Bid Plan & Profiles ...................................................................................... 11 thru 17 Additive Alternate Plan & Profiles ....................................................................... 18 thru 24

STELLAR CREEK ROAD REPAIR

STATEMENT OF WORK

Statement of Work

GENERAL INFORMATION AND REQUIREMENTS

PART 1: GENERAL

1.01 SUMMARY:

A. Description of Work: The Miles City Field Office of the Bureau of Land Management has a need for base bid construction activities to include road grading, culvert & cattle guard removal and replacement, and unclassified excavation located on the Stellar Creek Road north of Forsyth, Montana. Additive alternate bids for the installation of crushed top surfacing along portions and entire road corridor are also included in this construction package. See the project specifications, drawings, and bid schedule for project requirements and quantities.

B. Location: The project work is located along the Stellar Creek Road corridor on Bureau of Land

Management Lands approximately 32 miles north of Forsyth, Montana. Actual project locations are shown in the project drawings on Sheet 2 – Location Map. Access to the Stellar Creek Road Project location is via state highway and county gravel roads. Notify the contracting officer a minimum of 3 days prior to commencing work to ensure access to the project locations.

1.02 REFERENCES:

A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor from the following:

AASHTO American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 225 Washington, DC 20001

ASTM American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103

FP Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects Superintendent of Documents Government Printing Office Washington, DC 20402

Fed. Spec. Federal Specification/Standard General Services Administration Specifications Branch Room 6039, GSA Building Seventh and D Streets, S.W.

Washington, DC 20407

MDT Standard Specifications for Road and Bridge Construction, 2014 Ed.

Montana Department of Transportation Contract Plans Section 2701 Prospect Avenue Helena, MT, 59620

MPWSS Montana Public Works Standard Specifications 1717 11th Ave.

PO Box 4519 Helena, MT 59604

MUTCD Manual on Uniform Traffic Control Devices for Streets and Highways Superintendent of Documents Government Printing Office Washington, DC 20402

OSHA Occupational Safety and Health Administration's Standards U.S. Department of Labor Occupational Safety and Health Administration Denver Area Office 333 West Colfax Avenue Denver, CO 80204

*Federal Specifications and catalogs may be obtained at Business Service Centers of Regional Offices of the General Services Administration. (Washington, DC; Boston, MA; New York, NY;

Philadelphia, PA; Atlanta, GA; Chicago, IL; Kansas City, MO; Fort Worth, TX; Denver, CO; San Francisco, CA; and Auburn, WA.)

1.03 DEFINITIONS:

A. Approvals: Approval of the submittal is an indication that the Contractor's submittal have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, the Contractor may submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.

B. Engineer: For all specifications incorporated into the work by reference, the Contracting Officer’s

Representative (COR) shall be the “Engineer”.

C. Department: For all specifications incorporated into the work by reference, the government shall be the “Department”.

1.04 SUBMITTAL:

A. Scope: Submittals may include, but not necessarily be limited to, the following: design computations, shop drawings, manufacturers' literature, as‐built drawings, samples, and maintenance manuals.

B. Requirements: Refer to specifications for submittal required. Allow at least 5 working days for review. Submittal shall be delivered to the Contracting Officer or his/her appointed representative.

C. Identification of Submittal: Completely identify each submittal by showing at least the following information: submit two copies of each submittal for approval.

1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.

2. Name of project as it appears in these specifications.

3. Contract number, drawing number, and specification section number to which the submittal applies.

4. Whether this is an original submittal or re‐submittal.

5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.

1.05 CERTIFICATES OF CONFORMANCE:

A. Requirements: The Contracting Officer may permit use, prior to sampling and testing, of materials when accompanied by Certificates of Conformance. Materials used on the basis of a Certificate of Conformance may be sampled and tested. Installation of materials on the basis of Certificates of Conformance shall not relieve the Contractor of responsibility for incorporating materials conforming to the requirements of the drawings and specifications. Material not conforming to those requirements will be subject to rejection, whether in place or not.

B. Format: The form of the Certificate of Conformance provided by the supplier shall be as follows:

Submit two copies of the Certificate of Conformance for approval.

1. The certificate shall state that the named product conforms to the Contract requirements.

2. The certificate shall either be accompanied with a certified copy of the test results or certify that such test results are on file with the manufacturer and will be furnished to the Contracting Officer upon request.

3. The certificate shall provide the name and address of the manufacturer, the testing agency, and the date of tests.

4. The certificate shall set forth the means of identification permitting field determination of the product delivered as being the product covered by the certification.

1.06 QUALITY ASSURANCE:

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern. Where a conflict occurs between the statement of work and specifications incorporated by reference, the statement of work shall govern.

D. Measurements: Where approved manufacturer's diagrams and shop drawings give specific measurements or rough‐in dimensions for equipment, these dimensions shall take precedence over dimensions indicated on the drawings.

E. Specifications by Reference: This Contract incorporates Specifications by Reference with the same force and effect as if given in full text within the statement of work.

1.07 DELIVERY, STORAGE, AND HANDLING:

A. Delivery: The Contractor shall protect products, incorporated into the work, from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name and brand designation and contents legibly indicated. The containers shall bear the referenced specification number, type, and class as applicable.

B. Storage: The Contractor shall provide temporary storage facilities for products complying with manufacturer's recommendations which will protect them from damage until installation on the project and final acceptance. The storage area shall permit access for inspection and handling.

C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage until installation on the project.

1.08 PROJECT/SITE CONDITIONS:

A. Access to the Work: The work sites are accessed by State Highway and County Roads. Provide 3 copies of a traffic control plan and schedule for the work to the COR at the prework conference.

Do not begin work until receiving written approval of the Traffic Control Plan and Schedule from the COR.

Stellar Creek Road Stellar Creek Road to remain open to one‐lane traffic, including through‐ditch detours, at all time during the construction timeframe within the existing 100‐foot right‐of‐way only. Submission of through‐ditch detouring, and traffic control plan must be provided to COR for approval at least 3 days prior to proposed work commencing. Contractor shall be responsible to ensure no unauthorized vehicles access the work area during construction.

After each day’s work, contractor shall clear the roadway of all hazards and open to traffic.

Contractor to furnish all construction signage and traffic control for, but not limited to: Road closures signs and barriers, and construction signs according to the most current Manual on Uniform Traffic Control Devices (MUTCD) standards including signage on state highways if applicable. All construction traffic control shall comply with the most current MUTCD standards.

This work shall be included in the lump sum contract price for Traffic Control.

B. Environmental Considerations: The aesthetic values of the site and surrounding area are of prime importance. The Contractor shall take all care necessary to preserve all plant life and other natural features. No surface damage outside the staked area shall occur. Any surface damage outside the staked area shall be corrected by the Contractor at his expense. Any damage to existing State, County or local roads, used to transport materials to the project, shall be corrected by the Contractor at his expense.

C. Construction Facilities:

1. Contractor shall be responsible for utility locations before starting work. All utility locations shall include public and private utilities on the site.

D. Repair of Underground and Overhead Utilities: Contractor is responsible for any damage to underground and overhead utilities such as but not limited to: water, electrical, phone, sewer, and main power lines. All damaged underground or overhead utilities will be the full responsibility of the Contractor and shall be repaired at the Contractors expense.

1.09 SEQUENCING AND SCHEDULING:

A. Work Schedule: The schedule shall be submitted at the pre‐work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days.

PART 2: PRODUCTS

2.00 Mobilization: Mobilization shall follow the requirements of “Measurement and Payment” within Section 109 of the MDT 2014 Standard Specifications for Roads and Bridges.

2.01 Traffic Control: Traffic control shall follow MUTCD design standards. The Contractor is responsible for the design and implementation of the contracting officer approved traffic control plan.

Submission of the Traffic Control plan shall be no later than seven days prior to the start of construction and be paid for following the requirements of Part 1.08 and Part 4 of this Statement of Work.

2.02 Clearing: Clear and Grub the area following the requirements of “Clearing and Grubbing” within

Section 201 of the MDT 2014 Standard Specifications for Roads and Bridges. The staked construction limits shall be the Clearing and Grubbing limits. Payment for Clearing and Grubbing shall be paid for as a lump sum and will be full compensation for removal and disposal of vegetation and debris.

2.03 Roadway and Drainage Excavation and Embankment Construction: All project excavation and embankment shall follow the requirements of “Excavation and Embankment” within Section 203 of the MDT 2014 Standard Specifications for Roads and Bridges. No payment will be made for waste material. No separate payment for water under this specification shall be made. Include the cost of water for compaction in the unit cost base price for the item being compacted.

2.04 Cattleguard: Furnish and install cattleguard grid, bases, and wings meeting the requirements of

“Cattle Guards” within Section 611 of the MDT 2014 Standard Specifications for Roads and Bridges.

Materials submittals required and shall conform to the kind, type, grade, and size specified in the plans and the proposal. Include the cost for removal and salvage of the existing cattleguard, bases, wings, and adjacent fence repair in the bid price of the new cattle guard.

2.05 Pipe Culverts: Furnish and install pipe culverts meeting the requirements of “Metal Pipes” within

Section 709.05 of the MDT 2014 Standard Specifications for Roads and Bridges. Materials shall conform to the kind, type, grade, and size specified in the plans and the proposal. Material submittal required coated corrugated pipes. Culverts shall be installed according to Section 207 MDT 2014 Standard Specification for Roads and Bridges and will be paid by the linear foot.

2.06 Random Riprap: Furnish and install random riprap meeting the requirements of “Riprap and Slope and Bank Protection” within Section 613 of the MDT 2014 Standard Specifications for Roads and Bridges. Materials shall conform to the kind, type, grade, and size specified in the plans and the proposal. Material submittal required for random riprap in accordance with the contract plans and Section 701.06 of the MDT 2014 Standard Specification for Roads and Bridges and will be paid by the cubic yard.

2.07 Separation Filter Fabric: Furnish and install filter fabric riprap meeting the requirements of

“Geotextiles” within Section 716 of the MDT 2014 Standard Specifications for Roads and Bridges.

Subsurface drainage geotextile filter class B shall conform to the kind, type, grade, and size specified in the proposal. Material submittal required for filter fabric in accordance with the contract plans and Section 716.04 of the MDT 2014 Standard Specification for Roads and Bridges and will be paid by the square yard.

2.08 Low Water Crossing: The low water crossing work is to include the unclassified excavation and resetting of concrete blocks needed to achieve natural stream flow over the crossing as identified in the contract plans. The random riprap to be placed at the low water crossing shall be accounted for in the random riprap bid item. The contractor shall be responsible for any damaged or broken concrete blocks, replacement of damaged or broken blocks shall be accounted for in the low water crossing bid item and paid on a lump sum basis.

2.09 Road Maintenance: Shape roadway surface shall follow the requirements of “Excavation and

Embankment” within Section 203 of the MDT 2014 Standard Specifications for Roads and Bridges.

All work necessary to prepare surfaces to the lines and grades of the project plans shall be included in this item. Work consists of smoothing, scarifying, processing, and shaping existing road to restore typical sections as designated on the drawings; restoring proper drainage to the designated typical sections.

The new road base course surface shall be compacted to 95% of the theoretical laboratory maximum density (as determined by ASTM D698) while the material is within 3% of the optimum moisture content. Density testing may be performed by BLM personnel at the Contracting Officer’s discretion using a Nuclear Densometer. Site drainage shall be considered to be of prime importance.

2.10 Salvaging, Stockpiling, and Placing Topsoil: Salvage, stockpile, and place all topsoil shall follow the requirements of “Excavation and Embankment” within Section 203 of the MDT 2014 Standard Specifications for Roads and Bridges. Measurement and Payment for salvage, stockpile and placement of topsoil shall be lump sum and accounted for in the pay item number 113 “Reclamation/Seeding” of the schedule of items.

2.11 Crushed Top Surfacing: Furnish and install Crushed Top Surfacing meeting the requirements of

“Aggregate Surfacing” within Section 701 of the MDT 2014 Standard Specifications for Roads and Bridges. Crushed Top Surfacing Type “A” shall be Grade 1. Measurement and payment shall be by the submittal of certified scale weight tickets and paid by the ton. Material submittal required for Crushed Top Surfacing Type “A” shall include, but not limited to, gradation, Atterberg limits, and moisture/density proctor submittal.

2.12 Seeding: The contractor shall seed all disturbed areas with the seed mixture listed below. There shall be no primary or secondary noxious weed seed in the seed mixture. Seed shall be tested, and the viability testing of seed shall be done in accordance with State law(s) and within six months prior to purchase. Commercial seed shall be either certified or registered seed. The seed mixture container shall be tagged in accordance with State law(s) and available for inspection by the contracting officer. Material submittal required for seed mix design and will be paid according to pay item number 113 “Reclamation/Seeding” of the schedule of items.

Seed shall be planted using a drill equipped with a depth regulator to ensure proper depth of planting where drilling is possible. The seed mixture shall be evenly and uniformly planted over the disturbed area. Smaller/heavier seeds have a tendency to drop to the bottom of the drill and are planted first. The contractor shall take appropriate measures to ensure this does not occur. Where drilling is not possible, seed shall be broadcast and the area shall be raked or chained to cover the seed. When broadcasting the seed, the pounds per acre noted below are to be doubled. The contracting officer is to be notified a minimum of seven (7) days prior to seeding of the project.

Seed Mixture ‐ Western wheatgrass and Wyoming big sagebrush must be included in the mix.

Thickspike wheatgrass or Montana wheatgrass may be substituted only when western wheatgrass is unavailable. The combination of seed must include all growth forms (grasses, forbs, and shrubs).

The percent of each species is the maximum percent of the total mix for example on a clayey site the various grasses listed make up 80% of the total seed mix, therefore individually western wheatgrass may account for no more than 25% of the total seed mix. The seed mixture shall be planted in the amounts specified at a rate of 30‐50 small seeds plus 20‐25 medium seeds plus 15‐ 20 large seeds per square foot; totaling 65 to 95 live seeds per square foot, or 2,831,400 to 4,138,200 live seeds per acre. Seeding should be completed between October 15 and May 15, when conditions are appropriate.

To calculate total amount of Pure Live Seed needed per acre for each species:

[(Pounds of Pure Live Seed/acre) x (percent of mix)] / [(Germination rate) x (Purity of seed)] Add totals for each species to be planted and multiply by the number of acres to be seeded to determine the amount of seed necessary for the proposed project area.

Table 1. Seed mix group for ESD

ESD MCFO Group ESD MCFO Group

Clayey Silty‐saline

Clayey‐Steep Saline lowlands Saline

Dense clay Clay‐based Saline uplands

Thin clayey Saline overflow

Shallow clay Sands

Shale Sandy

Shallow Sandy‐steep Sands/Gravel

Shallow loam Shallow Gravel

Thin Silty Shallow to Gravel

Very shallow Wet meadow

Silty Subirrigated Wet

Loamy Silty/Loamy Overflow

Silty‐steep

MCFO Group: Saline ESDs included: Silty‐saline, Saline lowlands, Saline uplands, and Saline overflow Grasses: 60% of total mix (Choose at least 4, one of which must be Western wheatgrass):

Common Name Scientific Name Percent of

Total Mix

Pounds

PLS/acre

Alkali cordgrass Spartina gracilis up to 15% 6

Alkali sacaton Sporobolus airoides up to 15% 1

Inland saltgrass Distichlis spicata up to 20% 1.5

Needle‐and‐thread Hesperostipa comata up to 5% 9

Nuttall’s alkaligrass Puccinellia nuttalliana up to 10% 1

Sandberg’s bluegrass Poa secunda up to 5% 1

Western wheatgrass Pascopyrum smithii up to 20% 10

Forbs: 10% of total mix (Choose at least 4, one of which is a nitrogen fixer*):

Common Name Species of Seed Percent of

Total Mix

Pounds

PLS/acre

American vetch Vicia americana* up to 5% 3

Buckwheat spp. Eriogonum spp. up to 5% 1

Dotted gayfeather Liatris punctata up to 5% 7.5

Milkvetch spp. Astragalus spp.* up to 5% 8

Purple prairie clover Dalea purpurea* up to 5% 3.5

Scarlet globemallow Sphaeralcea coccinea up to 5% 2

Silvreleaf scurfpea Psoralea argophylla* up to 5% 4

Shrubs: 30% of total mix (Choose at least 2, one of which is Wyoming big sagebrush):

Common Name Species of Seed Percent of

Total Mix

Pounds

PLS/acre

Greasewood Sarcobatus vermiculatus up to10% 0.5

Gardner’s saltbush Atriplex gardneri up to5% 1

Winterfat Krascheninnikovia lanata up to15% 6

Wyoming big sage Artemisia tridentata var. wyomingensis up to10% 0.5

PART 3: EXECUTION

3.01 PROJECT MEETINGS:

A. Pre‐Work Conference:

1. Notification: A pre‐work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.

2. Attendance: The Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.

3. Presentation: The Contractor shall be prepared to summarize and explain procedures planned for the project and present the submittal requested in the specifications.

B. Progress Meetings:

1. Location: Meetings shall be held at the project site weekly or as determined by the Contracting Officer.

2. Notification: Meetings may be called by either the Contracting Officer or the Contractor. The request shall state who should attend.

C. Final Inspection:

1. Location: Meeting shall be held at the project site, or as determined by the Contracting Officer.

2. Notification: The Contractor shall notify the Contracting Officer, in writing, at least 5 working days before the completion date so the Government can schedule final inspection.

3. Attendance: The Contractor shall require the superintendent to be present during this inspection.

3.02 WORK LAYOUT:

A. Government Requirements:

1. General: The Government will set stakes for grading and work layout to give the Contractor measurements, lines, and grades necessary to perform the work required under the Contract.

Baseline monuments, benchmark's, or reference points disturbed or removed during construction shall be reset by the Government at the Contractor's expense.

2. Surveying Time Allowed: The Government will require the Contractor to give 3 working days advance notice for all surveying required by the Government in order to accommodate the Contractor's Work Schedule.

B. Contractor Requirements:

1. General: The Contractor shall, immediately upon entering the project site for the purpose of beginning work, locate slope stakes and reference points and take such action as necessary to prevent their destruction.

2. Contractor shall set control stakes at intervals not to exceed 3 feet in elevation differential on cut and fill slopes to guide earthwork operations at each station slope stake. Such lines, levels, and control stakes shall be marked and maintained for construction and inspection purposes.

3. Contractor shall set all construction stakes needed to perform the required work for vertical and horizontal control; to guide earthwork operations, underdrains, and aggregate placement and installation, based off of the slope stake elevations set by the Government for each item for the Contractors use.

5. Contractor to have a stake jumper on site at all times to set control stakes for cut and fill slopes.

6. Contractor is responsible for the development and implementation of their own erosion control plan and applicable permits. The contractor’s erosion control plan shall be submitted to the contracting office no fewer than three days prior to the start of construction.

3.03 CLEAN‐UP:

A. Waste Removal: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by his employees or work. At the completion of the work, the Contractor shall remove all such materials from the work site. The Government may remove all such materials and charge the cost to the Contractor, if the site is left untidy.

3.04 SAMPLING AND TESTING:

A. Independent Third‐Party Testing Lab: Provide independent third‐party testing and test results for all contract work as required per the Statement of Work and Specifications incorporated by reference from the 2014 MDT Standard Specifications for Roads and Bridges. Provide all material testing and lab results to demonstrate full compliance with requirements.

B. MDT Materials Manual: All sampling and testing requirements shall follow the latest edition of the

MDT Materials Manual, hereby incorporated by reference.

PART 4: MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT:

A. Units: Include all costs associated with equipment, labor, and materials needed to provide traffic control for this project in the lump sum contract price for Traffic Control. No additional payment for this work will be considered. All other work described in this section will not be measured for payment.

4.02 BASIS OF PAYMENT:

A. Price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools, and incidentals necessary to provide project as described in this section.

Payment will be made under:

BASE BID

Pay Item Number Description Unit

100 MOBILIZATION LUMP SUM

101 TRAFFIC CONTROL LUMP SUM

102 CLEARING AND GRUBBING LUMP SUM

103 UNCLASSIFIED EXCAVATION ‐ HEAD CUT GRADING CUBIC YARDS

104 CATTLE GUARD, 16 ‐ FOOT EACH

105 POLYMER‐COATED CORRIGATED CULVERT PIPE, 24 ‐ INCH LINEAR FOOT

106 POLYMER‐COATED CORRIGATED CULVERT PIPE, 36 ‐ INCH LINEAR FOOT

107 24" GALVANIZED FLARED‐END SECTION EACH

108 36" GALVANIZED FLARED‐END SECTION EACH

109 RANDOM RIPRAP, CLASS ‐ 1 CUBIC YARDS

110 FILTER FABRIC SQUARE YARDS

111 LOW WATER CROSSING ‐ REMOVE AND RESET BLOCKS LUMP SUM

112 ROAD MAINTENANCE LANE MILES

113 RECLAMATION / SEEDING LUMP SUM

ADDITIVE ALTERNATIVE 1, STA 0+00 TO 167+16

Pay Item Number Description Unit

114 ROAD MAINTENANCE ‐ 3/4" MINUS CRUSHED BASE COURSE TONS

ADDDITIVE ALTERNATIVE 2, STA 167+16 TO 334+32

115 ROAD MAINTENANCE ‐ 3/4" MINUS CRUSHED BASE COURSE TONS

ADDITIVE ALTERNATIVE 3, STA 334+32 TO 501+49

116 ROAD MAINTENANCE ‐ 3/4" MINUS CRUSHED BASE COURSE TONS

END OF SECTION

SPECIFICATIONS COVER SHEET_October