This statement of work outlines requirements for the construction and installation of a new prefabricated metal building structure to store farm vehicles and equipment. The USDA Agricultural Research Service's San Joaquin Valley Agricultural Sciences Center requires a 30' x 48' PEMB building from Borga Steel consisting of three walls and a roof. The structure will have three bays, including one 24' bay and two 12' bays. The roof and wall colors will be neutral tans or beiges. The contractor must construct and install the building according to industry standards, including spread footings at the columns. The period of performance is 90 days after notice to proceed. The related federal contract opportunity is solicitation number 12905B23Q0200 for the construction of this new storage structure, issued by the USDA Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agricultural Research Service

San Joaquin Valley Agricultural Sciences Center

9611 S Riverbend Ave Parlier, CA 93648

Farm Equipment Storage

Statement of Work

1. Background: Construction & installation of new structure needed to store farm vehicles/equipment for agricultural science related work.

2. Scope:

- Purchase one 30’ X 48’ PEMB from Borga Steel according to specs

- Construct & install PEMB according to industry standard

- Install Spread Footings at Columns according to industry standard

- Structure is enclosed on 3 sides only

- Cleanup work area

3. Objectives: A new and properly secured prefabricated 48x30x13 building structure constructed & installed with footings to store farm vehicles/equipment.

4. Requirements:

Construct & install Borga Steel PEMB 48’x30’x13’ (13’ at easement). Structure is a Borga

Cold Formed Steel building consisting of 3 walls and a roof. See Building specs above.

Structure will have 3 bays open on one side of 48’ length. Structure consists of one 24’ bay, and two 12’ bays. Roof and wall colors will be neutral tans/beige (not blue/charcoal).

5. Place of Performance: USDA-ARS, 9611 S. Riverbend Ave, Parlier, CA 93648

6. Period of Performance: 90 days after NTP.

File details come from the government source that posted it. Updated .