Attachment 1 - Statement of Work (SOW) Sally Port Repairs 1Oct20.docx
DOCX document 25 KB Posted
- Solicitation number
- FA251721Q0099
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs answered.docx | DOCX document | |
| Interior VMAG Operator.JPG | JPG image | |
| Exterior Gate Damage.JPG | JPG image | |
| Interior Gate Damage.JPG | JPG image | |
| Interior Slide Gate 2.JPG | JPG image | |
| Exterior VMAG Operator .JPG | JPG image | |
| Interior Slide Gate.JPG | JPG image | |
| Amended Request for Quote (RFQ) FA251721Q0099 CMAFS Sally .docx | DOCX document | |
| Request for Quote (RFQ) FA251721Q0099 CMAFS Sally Port.docx | DOCX document | |
| Attachment 2 - Contractor Submittal Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Repair of Sally Port Entrapment Area (Echo 2)
October 1, 2020
PREPARED BY:
21st CIVIL ENGINEER SQUADRON
1 NORAD RD
CHEYENNE MOUNTAIN AIR FORCE STATION, CO 80914
1. SCOPE OF WORK
1.1. GENERAL
The work to be performed shall consist of furnishing necessary labor, tools, transportation, supplies, equipment, materials, and incidentals necessary to complete all repairs on two gates (inbound and outbound) of the Sally Port Bldg. 114, which is the search gate before entering the restricted area of Cheyenne Mountain Air Force Station, as stated in this Statement of Work (SOW). The Contractor shall follow all current, applicable codes, regulations, standards, and criteria. In addition, all work procedures and materials shall be approved by the 21st Civil Engineering Squadron (21 CES) prior to the start of work. The work in this SOW shall be executed by qualified and efficient mechanics/tradesmen, skilled in their respective trades. The Contractor shall coordinate and perform all operations in a manner that will result in a professionally and expeditiously completed project.
1.2. PROJECT DESCRIPTION
1.2.1. Repair Echo 2. The following repairs will be completed within the first 30 days of contract award. If the Contractor identifies any repair/s not listed in this SOW, the Contractor shall provide the Contracting Officer with a price estimate to repair/replace the identified discrepancies.
1.2.2. Replace reaction fin (2 ea.), reaction fin bracket (2 ea.).
1.2.3. Replace lower section of the cantilever gate (2 ea.).
1.2.4. Equipment rental (3 days).
1.2.5. Replace cam roller top and bottom assembly (4 ea.) 8 total.
1.2.6. Install LED Traffic Controller 12/24 VDC, solid Red flashing Amber with two post at entrance and exit sides of Echo 2. Saw cut three vehicle loop with detectors, enclosure and annunciators.
1.2.7. Replace gate motor on second sliding gate inside PL1.
1.2.8. Install de-icing kit on both inbound and out bound sliding gates.
1.3. LICENSES AND PERMITS
The Contractor shall obtain all necessary licenses and permits, complying with all federal, state, and municipal laws, codes and regulations applicable to the performance of the work. The Contractor shall provide proof of such applicable licenses and permits upon Government request. Cheyenne Mountain Air Force Station (CMAFS) Fire Department (719-474-3030) shall provide and issue hot works permit.
2. ENVIRONMENTAL AND HAZARDOUS MATERIAL HANDLING
2.1. The Contractor shall provide and maintain Safety Data Sheets on all materials used in the performance of this contract. If any materials used in the performance of this contract are considered hazardous; the Contractor shall follow all local, state, and federal laws for proper management or transport of said hazardous waste. All potentially hazardous materials/toxics found or identified at CMAFS while executing this work will immediately be reported to R&O at 719-474-2732 and The Environmental Section at 719-474-2217.
2.2. Ensure employees handle any hazardous materials according to federal, state, or local laws and emergency response requirements. If required, a license for employees handling of hazardous materials shall be the Contractor’s responsibility and at their expense. Report any instances of spills, leaks, and/or inadvertent release of hazardous materials to Cheyenne Mountain Control Center (CMCC) at 719-474-3575/3558 and The Environmental Section at 719-474-2217 as soon as the event occurs.
2.3. The Government will provide the Contractor an AF Form 3952, Chemical/Hazardous Material Request Authorization, for all materials used on CMAFS. The Contractor shall have the form submitted back to 21 CES at least 15 business days prior to the start of work.
2.4. The Contractor shall contact 21 CES prior to generating any waste that is determined to be hazardous. The Contractor is encouraged to contact R&O at 719-474-2732 if assistance is needed in making a waste determination.
2.5. The Contractor shall submit copies of any records showing quantities of disposed hazardous materials and/or recycled materials to 21 CES within five (5) business days of disposal.
3. WORK SCHEDULE
Working hours for the Contractor will normally be between the hours of 7:00 A.M. and 4:00 P.M. excluding Saturdays, Sundays, and Federal Holidays. On rare occasion, circumstances may require work to be completed in other than the aforementioned timeframes.
4. WORK AREA ACCESS
4.1. This worksite is located inside a restricted area at CMAFS and all Contractors must have proper authorization. The Contractor’s company shall ensure Contractors have been authorized to enter the restricted area and must provide their own escorts, if necessary. 21 CES can provide recommendations for approved escorts. Escorts may only supervise 10 visitors at any one time and visitors must remain within sight of the escort at all times. Upon acceptance of this contract, the Contractor shall complete and submit an Entry Authorization Letter (EAL) to 21 CES. See attached EAL template. All EAL requests shall be submitted no later than 15 business days prior to the first day of work. The Contractor shall coordinate EAL processing with R&O at 719-474-2732. Any Contractor who fails to pass a background check will not be permitted to work on the installation.
4.2. The Contractor shall inform CMCC at the start and end of every shift at 719-474-3575/3558.
4.3. If Contractor requires a vehicle to be driven into the restricted area additional information will be required, see attachment 3, Vehicle Authorization Request (VAR). All VAR requests shall be submitted no later than 15 business days prior to the first day of work. The Contractor shall coordinate VAR processing with the R&O at 719-474-2732.
4.4. If Contractor requires a camera or computer in the restricted area additional information will be required, see attachment 4, Laptop/Computer/Electronic request. All requests shall be submitted no later than 15 business days prior to the first day of work. The Contractor shall coordinate processing with R&O at 719-474-2732.
5. SAFETY
All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 (1910.146 and 1910.147) and 29 CFR 1926, and Air Force Occupational Safety & Health (AFOSH) AFOSH standards including 91-205. The Contractor shall also ensure that all work is performed in accordance with project identified national standards, military manuals, instructions, pamphlets, standards, and handbooks.
6. PROTECTION OF GOVERNMENT PROPERTY
The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor fails to use reasonable care and causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
7. SITE MAINTENANCE AND CLEANUP
7.1. The Contractor shall protect the work area, and if necessary adjacent areas, from dust, dirt or other materials. Work areas shall be maintained in a neat, clean, and safe condition and shall, at a minimum, be cleaned at the end of each shift. All passageways in/or adjacent to the site shall remain free of project generated trash and debris at all times.
7.2. For project to be accepted the Contractor shall collect any and all trash, debris, refuse, garbage, etc., that is generated from this project and place it in appropriate containers with lids or approved covers on a periodic basis or as directed. The aforementioned materials shall be hauled from the site by appropriate means on a daily basis, unless otherwise approved. Disposal shall be outside the limits of Government property. Disposal shall be by approved methods and shall conform to all local, state, and federal guidelines, criteria, and regulations. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat, and workmanlike condition satisfactory to 21 CES.
8. DELIVERABLES
8.1. At the completion of the contract, the Contractor shall provide all applicable documents for operations and maintenance of the new system. Additionally the Contractor shall provide a separate detailed report for condition and maintenance actions required. This report becomes property of the U.S. Government and shall not be shared with third parties except with written permission from the 21 CES.
8.2. At the completion of the contract, the Contractor shall provide all reports/results for any tests performed related to this project. This report becomes property of the U.S. Government and shall not be shared with third parties without written permission from the 21 CES.
END OF STATEMENT OF WORK