Attachment (1) Statement of Work (SOW) DRAFT.doc

DOC document 162 KB Posted

Attached to
The Naval Foundry and Propeller Center (NFPC) Chemical Products
Solicitation number
20-AFM-012
Issued by

View the file

Other files

File Type Posted
Sources Sought Notice_Chemicals.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification for

Procurement of Foundry Chemicals for

Naval Foundry and Propeller Center

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for the Naval Foundry and Propeller Center (NFPC) who is responsible for the design, manufacture, and repair propellers for the US Navy.

1.1 BACKGROUND

NFPC requires chemical products to be utilized during their daily operations. Specifically, this procurement is for refractory products that serve as a protective coating for the inside lining of the facility’s ladles and induction furnaces. The purpose of this refractory coating is to protect the outer steel shell of the ladles and furnaces from coming in contact with liquid molten metal.

1.2 SCOPE OF WORK

The contractor shall procure and deliver the following:

Part Number
Description
Quantity
Unit of Issue
Estimated Delivery Date
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
2/15/2021
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
2/15/2021
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
2/15/2021
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
2/15/2021
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
2/15/2021
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
2/15/2021
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
8/15/2021
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
8/15/2021
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
8/15/2021
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
8/15/2021
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
8/15/2021
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
8/15/2021

DELIVERIES 2022 (Option)

A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
2/15/2022
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
2/15/2022
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
2/15/2022
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
2/15/2022
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
2/15/2022
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
2/15/2022
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
8/15/2022
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
8/15/2022
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
8/15/2022
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
8/15/2022
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
8/15/2022
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
8/15/2022
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
3 weeks after exercise of option
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
3 weeks after exercise of option
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
3 weeks after exercise of option
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
3 weeks after exercise of option
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
3 weeks after exercise of option
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
3 weeks after exercise of option

DELIVERIES 2023 (Option)

A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
2/15/2023
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
2/15/2023
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
2/15/2023
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
2/15/2023
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
2/15/2023
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
2/15/2023
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
8/15/2023
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
8/15/2023
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
8/15/2023
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
8/15/2023
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
8/15/2023
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
8/15/2023
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
3 weeks after exercise of option
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
3 weeks after exercise of option
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
3 weeks after exercise of option
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
3 weeks after exercise of option
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
3 weeks after exercise of option
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
3 weeks after exercise of option

DELIVERIES 2024 (Option)

A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
2/15/2024
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
2/15/2024
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
2/15/2024
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
2/15/2024
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
2/15/2024
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
2/15/2024
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
8/15/2024
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
8/15/2024
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
8/15/2024
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
8/15/2024
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
8/15/2024
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
8/15/2024
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
3 weeks after exercise of option
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
3 weeks after exercise of option
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
3 weeks after exercise of option
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
3 weeks after exercise of option
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
3 weeks after exercise of option
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
3 weeks after exercise of option

DELIVERIES 2025 (Option)

A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
2/15/2025
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
2/15/2025
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
2/15/2025
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
2/15/2025
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
2/15/2025
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
2/15/2025
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
8/15/2025
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
8/15/2025
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
8/15/2025
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
8/15/2025
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
8/15/2025
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
8/15/2025
A91-KGC
55#C MINRO-AL PLASTIC A91
1,100.00
lbs
3 weeks after exercise of option
A93-KGP
55#P MINRO-AL PLASTER A93
1,100.00
lbs
3 weeks after exercise of option
CWBSD
55#B BRISKET MORTAR DRY
550.00
lbs
3 weeks after exercise of option
CWDM81P-55P
55#P DURAL 81P MORTAR
550.00
lbs
3 weeks after exercise of option
TCOAT691
55#B T-COAT 691M
7,040.00
lbs
3 weeks after exercise of option
Z77
55#B MINRO-Z WASH Z77
7,040.00
lbs
3 weeks after exercise of option

There shall be no deviation from the specific material. The specified material and deliveries for calendar year 2022 onward are considered options in accordance with FAR 17.2.

2.0 APPLICABLE DOCUMENTS

Map of Direction to Lot 753 (See paragraph 5.0 Security Requirements for more information)

3.0. REQUIREMENTS

Not applicable.

4.0 DATA REQUIREMENTS

Not applicable.

5.0 SECURITY REQUIREMENTS

5.1 The contractor shall be escorted onto the site, observed while they perform the work, and escorted off the site.

5.2 Escorted visit. Escorted visits are required for any person who is not assigned to NNSY/NFPC and/or does not have a valid security clearance. Visitors will be escorted at all time by an NFPC employee and no exposure to any classified open storage areas or material. Requests for escorted access must be submitted 5 working days prior to arrival. If it is service or maintenance that needs to be done or an emergency the request needs to be submitted immediately in order to allow for ample time for proper vetting of individual/individuals requesting access.

The requesting NFPC code/shop will coordinate the visit and security code 1120 will verify two forms of Government issued identification. The responsible code shall provide escort during the contractor’s visit.

Acceptable documents include:

· US Birth Certificate (original)

· US Voters registration

· US Passport

· (Home Land security), Transportation Workers Identification Credential (TWIC)

· Naturalization paperwork

· Driver’s License

· Social Security Card

Installation Access for Visitors/Contractors

All visitors/contractors having a valid purpose for access shall submit a completed and signed Form 5512/1 to their identified Government sponsor 14 working days prior to the date of their required visit.

The entire document shall be completed and form dated/signed by the visitor/contractor.

Visitor/Contractor shall retain a copy of the form 5512/1 to present on the first day at the installation.

The visitor/contract shall communicate all on-site day to day schedules and schedule changes to the NFPC base sponsor to be submitted to code 1120 in a detailed security plan.

Note: It is critical that start/end dates/work hours are identified, accurate, and short term visitors/contractors are not granted extended or after-hours access if not required Reporting to PNY-A for the first time.

Visitor/Contractor Responsibility

Visitor/Contractor shall report to the location designated by their sponsor (Security Office or other designated location, Pass and ID office) or if operating a Commercial Vehicle requiring inspection; to the Vehicle Inspection Station.

Visitor/Contractor shall present their completed and signed 5512/1.

The Sentry or Security Assistant shall verify vetting is cleared and issue the appropriate passes. If visitor/contractor has not completed the 5512/1 their access will be delayed until they correct the form.

Code 1122 will review request and when acceptable notify requesting NFPC code/shop to arrange visit.

5.3 Contractor Vehicle Parking: (OPNAV 5530.14E) All contractor commercial vehicles must be visually inspected at Lot 753 prior to entry into any NFPC buildings and are subject to random inspections anywhere on the compound. Vehicles must clearly display an authorized company sign or logo including a company phone number. Vehicles must only be allowed in the compound for transportation of contractors' tools, parts, and materials to and from the work site with the exception of MILCON scope projects. Vehicles must be registered to the company and not to an individual. Parking of POV's is available at Lot 753, which is approximately one mile from the work site. Contractor shall ensure that their vehicles, including delivery trucks, have valid and current vehicle registration and insurance upon arrival to NFPC. Non-valid and outdated or missing vehicle registration and insurance shall result in denied facility access requiring the Contractor to reschedule delivery immediately at the contractor’s expense. Delivery drivers must present two forms of Government issued identification. Please see attached map for directions to Lot 753.

5.4 Devices with camera capabilities are not allowed in areas where work is being performed.

Should the Contractor require a laptop on-site to fulfill the Scope of Work, the Contractor must complete an asset authorization form for each device and submit the devices to code 109 for inspection and approval prior to site access. The laptops cannot have camera capabilities. Procedures regarding laptop access are subject to change.

Camera cell phones are PROHIBITED:

In the CAA (Controlled Access Area), In Restricted Areas (Open Storage Confidential Areas, Secure Rooms, Vaults, etc.) and any location (office, trailer, shop, work area, etc.) where NAVSEA business is conducted.

Cell phones with the camera features disabled are no longer considered to be “camera” cell phones, and none of the restrictions for camera cell phones apply.

“Disabled” means physical removal/destruction of the lens (drilling out, for instance) and filling the void with a permanent epoxy.

The “acceptance criteria” is that it must be visually obvious to untrained personnel that the camera feature has been disabled. Accordingly, claiming that the camera feature or function has been “deprogrammed”, “inactivated” (or similar) would NOT be acceptable, since this cannot be readily verified by untrained personnel. Also, the camera feature or function could be reprogrammed or re-activated after inspection.

Cell phone owners should consider locations into which they intend/desire to carry cellphones before permanently modifying them. Modifications to cell phones are solely the decision and the responsibility of the owner.

Personnel camera cell phones are permitted in Personally Owned Vehicles parked outside of the Controlled Access Area. (General parking lots across the street.)

Personal camera cell phones are permitted in areas outside of the CAA and where Naval Sea Systems Command (NAVSEA) business of a sensitive nature is NOT conducted.

This means that camera cell phones are PROHIBITED in Secure Rooms (regardless of where any of these areas are located), and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is carried on.

Cellphone lockers/boxes will be placed at the entrance to facilities, or as close to the entrance as possible in order to facilitate this policy.

********CAA-Controlled Access Area is anywhere within the fence line********

5.5. The contractor shall adhere to the facility/base access guidance per the following website:

https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system/faqs.html

5.6. The contractor shall ensure that only contractor employees who meet the security requirements stated below perform under this contract at the Government site (e.g. delivery drivers and passengers, etc.). The contractor shall propose and maintain a list of employees whom meet these requirements and be willing to submit this list to the Government, along with the necessary documentation to prove they meet them (e.g. the results of a contractor conducted background check, etc.), for the Government’s security vetting, to include any Government background check, and approval. Once vetted and approved, a list of approved contractor employees must be maintained for the entire period of performance of the contract (i.e. propose new employees, replace existing employees or provide updates to existing employees’ records, as necessary). A minimum of two employees, primary and backup, should be cleared by the Government to perform the necessary functions under this contract (e.g. proposed drivers of a delivery vehicle) throughout the entire period of performance of the contract. Contractors must have the ability to be granted access by ensuring current documentation is available at the submission of their proposal to allow background checks for any proposed driver and passenger under the following criteria:

· Felony conviction of any type within 10 years, or felony arrest that has not been adjudicated yet (includes "deferred findings").

· Misdemeanor conviction or on-base arrest within 5 years, for any of the following types of crimes (includes "deferred findings"): Crimes of violence, sexual assault, larceny, drugs, or a habitual offender.

· On the Sex Offender Registry.

· Is barred from any Navy installation.

If a contractor’s employee is denied entry at delivery due to inaccurate or outdated personal and/or vehicle documentation, the Government is absolved of any costs accrued as a result of the denial and the contractor is still pledged to fulfill the contract requirements. Failure to fulfill the contract requirement may result in a termination for default pursuant to FAR 49.4.

6.0 PLACE OF PERFORMANCE

6.1 Delivery shall occur at the following Government site:

Naval Foundry & Propeller Center

1701 Kitty Hawk Ave. Gate #3

Building 20 – Foundry

Philadelphia Navy Yard

Philadelphia, PA. 19112

The contractor shall follow the delivery schedule listed in Section 1.2.

7.0 TRAVEL

Not applicable.

8.0 GOVERNMENT FURNISHED PROPERTY

Not applicable.

9.0 GOVERNMENT FURNISHED INFORMATION

Not applicable.

10.0 PURCHASES

Not applicable.

11.0 Counterfeit Material Prevention

Not applicable.

12.0 PERSONNEL

Not applicable.

13.0 NSWCPD Electronic Cost Reporting and Financial Tracking (eCRAFT) System

Not applicable.

14.0 SPECIAL REQUIREMENTS

Not applicable.

File details come from the government source that posted it. Updated .