Attachment 1 Statement of Work (SOW).pdf

PDF 321 KB Posted

Attached to
Solicitation Asphalt Parking Lot Clean, Reseal and Striping for USDA ARS in Riverside, CA
Solicitation number
12905B24Q0214
Issued by

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to provide parking lot sealing services for the US Department of Agriculture (USDA), Agricultural Research Service (ARS), US Salinity Laboratory located in Riverside, CA.

The key objectives are to clean, seal, and stripe 45,000 sq ft of existing asphalt parking. The tasks include power washing the asphalt surface, applying weed killer and one coat of sealant, restriping and restenciling to the existing layout, and cleaning and filling medium-to-large cracks. The government will provide access to the site and turn off landscaping water before and after the work. The contractor must be available for a post-completion inspection. No travel or workspace will be provided, and the work must be completed within 24 hours of the start, excluding federal holidays. The estimated total value of the project is less than $25,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

A. BACKGROUND

The US Department of Agriculture (USDA), Agricultural Research Service (ARS), US Salinity Laboratory is seeking parking lot sealing services for the 450 W. Big Springs Rd., Riverside, CA location.

B. OBJECTIVES

The objective of this Statement of Work (SOW) is to clean, seal, and stripe 45,000 sq ft of existing asphalt parking.

C. SCOPE

The contractor shall propose sealing services according to the tasks listed below. See Exhibit A-map.

D. TASKS

TASK 1: POWERWASH CLEAN ASPHALT SURFACE, APPLY WEED KILL, AND APPLY ONE (1) COAT OF

SEALANT

TASK 2: RESTRIPE AND RESTENCIL TO EXISTING LAYOUT

TASK 3: CLEAN CRACKS OF LOOSE DEBRIS AND WEEDS AND APPLY HOT RUBBERIZED CRACKFILL TO

MEDIUM-TO-LARGE SIZED CRACKS

E. GOVERNMENT FURNISHED EQUIPMENT AND GOVERNMENT FURNISHED INFORMATION

The government shall insure the lot is free from all vehicles upon commencement of work.

Landscape water will be turned off twenty-four (24) hours prior to commencement of work and remain off for forty-eight (48) hours after completion of work to allow for curing of materials.

Area will remain close to foot and vehicular traffic for a minimum of twenty-four (24) hours after completion of work.

Work will be performed on weekdays, excluding federal holidays. Federal holidays are: New Year’s Day, Martin Luther King, Jr. Birthday, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.

The government will not provide a workspace, telephone, desk, computer, printer, Internet access, access to duplicating machines or fax.

F. REPORTING REQUIREMENTS

The contractor shall be available for post completion inspection by government Location Monitor.

G. TRAVEL REQUIREMENTS

Travel and/or trip charges will not be reimbursed by government.

H. PLACE OF PERFORMANCE

US Salinity Laboratory, 450 W. Big Springs Rd., Riverside, CA 92507

I. SECURITY REQUIREMENTS

Building Access: USDA will need to review, approve, and provide appropriate access to USDA buildings and systems for resources supporting this effort.

J. POST AWARD ADMINISTRATION

Contractor performance will be monitored in accordance with this statement of work by Location Monitor’s onsite review of work in-progress and post-completion inspection.

Exhibit A-Map