Attachment_1_Statement_of_Work-_revised.pdf

PDF 2 MB Posted

Attached to
VAULT PUMPING Federal contract opportunity
Solicitation number
140L6425Q0014
Issued by
Department of the Interior Bureau of Land Management Arizona Region

About this file

This Statement of Work (SOW) details sewage pumping services for the Bureau of Land Management's Yuma Field Office across Arizona and California. The contract covers pumping services for 47 sewage vaults, RV dump stations, and septic holding facilities located in various recreational areas, including the La Posa Long-Term Visitor Area, Imperial Dam Recreation Area, Oxbow Campground, and sites near Mittry Lake. The pumping requirements include bi-annual or annual service for most locations, with specific schedules in June/January or November/April, and provisions for emergency pumping.

The contract is for one year with four potential one-year option periods, contingent on contractor performance. Key responsibilities include removing sewage through pumping, cleaning and disinfecting facilities, properly disposing of waste, and maintaining strict safety and environmental standards. The contractor must provide all necessary equipment, transportation, and personnel, develop a comprehensive Health and Safety Plan, and submit monthly reports. Invoicing will be done monthly through the Invoice Processing Platform, with payments based on completed work consistent with provided reports.

View the file

Other files for this federal contract opportunity

Other files attached to VAULT PUMPING, newest first.
File Type Posted
Attachment_3_Wage_Determinations.pdf PDF
Sol_140L6425Q0014.pdf PDF
Attachment_5_Bid_Schedule.xlsx XLSX spreadsheet
Attachment_4_Instructions_to_Offerors.pdf PDF
Combined_Synopsis_and_Solicitation.pdf PDF
Attachment_2_Clauses_and_Provisions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Land Management Yuma Field Office, Arizona

Statement of Work Imperial and La Posa Vault Pumping

Table of Contents

Section Title Page A Background and Purpose 2

B Location 2

C Designated Representatives 2

D Period of Performance 2

E Definitions 3

F General Requirements 3

G Specific Requirements 4

H Meetings and Coordination 7

I Schedule and Submittals 8

J Safety 13

K Hold Harmless 13

L Insurance 14

M Payments 15

ATTACHMENT A: MAPS

A. Background and Purpose

The Yuma Field Office (YFO) manages 1.2 million acres of public lands across Arizona and California. The Bureau of Land management (BLM) manages recreation sites including restroom facilities among other amenities for the public to enjoy.

The purpose of this contract is to remove, through pumping, sewage from 21 Arizona and 26 California sewage vaults, RV dump stations, and septic holding facilities throughout the Yuma Field Office management area. This statement of work is for one (1) award for all standard pumping outlined in the tables below. All additional facilities added, and emergency pumping will be quoted and awarded upon approval of implemented action.

B. Location

Of the 21 Arizona vault toilets, dump stations and septic holding facilities, 19 are located directly south of Quartzsite, Arizona within the La Posa Long-term Visitor Area (LTVA). In addition, there are two restroom facilities located adjacent to Mittry Lake near Yuma, Arizona.

Of the 18 California vault toilets, dump stations and septic holding facilities, 16 are located between Winterhaven, CA and Yuma, AZ along the lower Colorado River, within the Imperial Dam Recreation Area. In addition, there are 2 sewage vaults and a septic holding facility along the Colorado River in the Oxbow Campground near Palo Verde, CA.

The table with specific vault toilets and locations is in Section H on page 9.

C. Point of Contact

Contracting Officer:

Rachel Henriques Email: rhenriques@blm.gov

D. Period of Performance

The performance period for the contract is for one year from the date of the award of the contract, with a four 1-year Option Periods subject to acceptable contractor performance.

Removal of sewage will begin upon award of the contract and a kick-off meeting shall be scheduled within thirty (30) days after award of the contract. Notification of any necessary contract extension must be requested and approved by the BLM Contracting Officer.

E. Definitions

1. Sewage: liquid, semi-liquid, and solid waste matter.

2. Debris: all other refuse found in toilet vaults that is not defined in #1 above.

3. Effluent Filter: device located at the outlet end of septic tanks to stop the flow of solids larger than 1/8" from entering the effluent stream.

4. Basis of Payment: Payment coincides with flat rate per visit for itemized location identified on spreadsheet in Section H on page

F. General Requirements

1. The Contractor shall furnish toilet pumping services which include all equipment, supervision, transportation, labor, operating supplies, and incidentals necessary to pump, recharge, clean, disinfect, and dispose of all waste products removed from the vault toilets, septic tanks, and combination vault and pumping installations. All work performed under this contract shall be in accordance with the following contract specifications and in accordance with county, State and Federal regulations. The awarded vendor shall provide pumping service for removal of sanitary waste, sludge and any other foreign matter including but not limited to: bottles, cans, clothing, rocks, boards, etc. from the devices at the requested site(s) at the bid price listed in the pricing documents.

2. The Contractor shall provide all transportation, meals, and lodging for himself/herself and his/her personnel as well as all equipment necessary to complete the work. It is not anticipated that any government furnished equipment will be required. All equipment is subject to the inspection by and approval of the YFO Safety Officer and regulatory personnel.

3. Emergencies are line items in Section H, as a flat fee for each site in that an emergency may occur. Emergencies may consist of overflows and natural disasters. Scheduling for the additional services is to be done on a reasonable basis. Emergencies may need to be expedited with a 24-hour response time consisting of possibly 6 emergencies within each contracting year. Other service providers may be used for emergencies, but this contract may not be subcontracted.

4. The Contractor is responsible for their own equipment maintenance and accountability in order to comply with the contract. If the Contractor is unable to fulfill their contractual obligations, he/she must immediately contact the COR.

5. Gates have been installed on various roads. When closed, they are not to be ignored or circumvented for any reason. If contract work is required behind a locked gate, contact the COR and/or PI.

6. All parties involved in this contract agree to comply with all applicable laws and regulations pertaining to the provision of safe and respectful workplace and to provide a work environment free of harassment and intimidation for such party’s own employees and third parties.

7. All work conducted in support of this contract shall comply with all Federal laws applicable to public and State lands including but not limited to: 2010 YFO Resource Management Plan (BLM. 2010. Yuma Field Office Record of Decision and Approved Resource Management Plan. Yuma Field Office. Signed January 29, 2010.) which can be found at https://eplanning.blm.gov/public_projects/lup/68418/87828/105163/Yuma- ROD-ARMPcomplete.pdf.

8. The Contractor shall manage generated hazardous material, hazardous waste, and hazardous waste residues in accordance with Federal, State, and Local regulations.

Transport and dispose of hazardous waste in accordance with Federal, State, and Local regulations.

9. The Contractor and his employees shall make every reasonable effort to prevent interference with the normal use and occupancy of recreational areas while engaged in the performance of the contract. If pumping or other associated work is not being done under the parameters of this contract, contract personnel and equipment are not permitted within the management areas.

10. The Vendor shall provide and utilize Personal Protective Equipment (PPE) for their employees at all times as appropriate. PPE includes but is not limited to substantial footwear, eye and face protection, hearing protection, and gloves.

11. The COR may, in writing, require the Contractor to remove from the work site any employee the COR deems incompetent, careless, discourteous to the public, or is otherwise found objectionable. Other grounds for removal include theft, possession and/or removal of materials, supplies, equipment, or any Government-owned property.

12. The Contractor is required to provide a Hazardous Material Spill Response Plan within 30 days of contract award.

G. Specific Requirements Equipment

a. The Contractor shall furnish all sewage pumping equipment, tank truck, water truck, tools, approved disinfectant, and other equipment and supplies necessary to perform work in accordance with these specifications. The length of hose must be sufficient enough to accomplish the required pumping.

b. A washer system (pressure preferred) is required to wash the area after pumping if spillage occurs. Additionally, it may be necessary to dilute solidified waste in the bottom of a flat-bottomed vault and to wash the last portion of waste down a slope bottomed vault.

c. Water drafting equipment (if necessary to get water from a lake, pond, or stream) shall consist of pumps, tanks, hoses, etc. and shall be completely separate from toilet waste pumping and hauling equipment.

d. All equipment shall be in full accordance with all applicable Federal, State, County and Local Regulations.

Outside Manhole pumping procedures

a. Vault toilets: When the exterior pump-out access is in excess of 20 inches in diameter or 20 inches square the Contractor shall not be allowed to remove the vault contents through the toilet riser.

b. All debris removed from the vault shall be placed into a leak proof container so that no contamination to the surrounding ground shall result.

c. Flat bottom type vault: The waste shall be removed to within 4 to 5 inches of the bottom.

Remove any further debris that was not removed during the initial raking and removal.

Wash down all interior walls of the vault. If at this time there is still a heavy concentration of solids on the bottom of the vault, then all solids shall be broke up and diluted and then pumped down to the 4 to 5 inch level. Compacting the waste material in the bottom of the vault to obtain the 4 to 5 inch depth shall not be allowed. After the sewage removal is completed, the vault shall be recharged with water to a minimum depth of 10 inches.

d. Sloped bottom type vault: Remove all waste and debris. Wash down all vault walls.

Pump out all remaining waste and water. Recharge the vault with water so that there is a minimum of 10 inches of water covering the bottom under the toilet riser.

e. All contaminated areas resulting from the pumping process shall be cleaned up and disinfected. Sweep or wash all waste that is deposited on the concrete surrounding the manhole cover, back into the vault. All waste that runs off onto the dirt or gravel shall be diluted or picked up so not to cause a potential health risk and odor problem.

f. Clean thoroughly around the manhole cover gasket area and replace the cover. The manhole cover MUST fit with an airtight seal so that the venting process of the vault toilet is not interfered with. If there is not an airtight seal, the Contractor shall notify the

COR.

Pumping procedures through the Toilet Riser

a. Only when the availability of an outside manhole is non-existent, will the Contractor remove the toilet riser prior to pumping or removing debris. The Contractor shall not remove debris or pump through the toilet riser (without removing the riser).

b. Remove the debris and pump, extra care shall be taken to prevent waste spillage onto the interior floor and wall surface while removing debris or pumping. The toilet paper dispensers shall be covered with a waterproof material prior to removing debris or pumping, in order to prevent the paper from becoming contaminated.

c. During the final cleanup, the interior floor surface and any wall surface that was contaminated by waste shall be thoroughly disinfected. The Contractor shall sweep or wash any spilled waste back into the vault. The Contractor shall not wash or sweep spilled waste out through the front door.

d. Thoroughly wash and disinfect both the inside and outside of the toilet riser, the seat and cover, before replacing the riser. Remove the waterproof covering over the toilet paper dispenser and make sure that the paper is not contaminated. If the paper is contaminated, the Contractor shall notify the COR.

e. Each unit shall be available for immediate use after the pumping and final cleanup. The Contractor shall not leave any toilet location until final cleanup is accomplished.

Pumping Procedures for combination Vault / Lift Stations

a. The sewage lift pumps associated with these installations require removal prior to pumping the vaults and re-installation afterward. All costs associated with this are to be included in the bid price and are not a separate pay item.

Drafting of Water

a. The Contractor may draft fresh water from lakes, ponds, and streams under the following conditions:

i. Drafting shall be accomplished when it least interferes with the public use of the facility and at areas least viewed by the public.

ii. No waste shall be introduced into any body of water.

iii. The COR shall approve all sites used for drafting water. The contractor will provide a list of potential drafting locations at the pre-work conference for approval. As part of the weekly correspondence, notification of draft location used will be included.

Offsite Disposal of Sewage and Debris

a. The Contractor shall be responsible for making off-site disposal arrangements, including disposal of all effluent, debris, trash, and payments of all fees. Use of on-site garbage cans, dumpsters, leach fields, and/or sewage lagoons is not acceptable.

b. Disposal shall conform to all Federal, State, and Local laws or ordinances. As part of the weekly correspondence, notification of disposal location used will be included.

c. The Contractor shall be responsible to prevent spillage and to haul all waste material (sewage and debris) in watertight containers. Handling of all waste material shall be in accordance with all applicable health regulations.

Cleaning of Effluent Filters

a. Filters shall be removed from septic tanks and thoroughly cleaned. The transporting of the filters to the dump stations for cleaning is acceptable. All waste and contaminated material from filter cleaning operations shall be contained for proper disposal.

H. Meetings and Coordination

1. The Contractor or his/her designee will attend a kick-off meeting with the COR, PI, and relevant regulatory agency personnel within thirty (30) days of award to ensure coordination of activities. The purpose of this meeting is to thoroughly discuss the schedule of work, work performance requirements, approved waste disposal sites, approved water drafting locations, contract terms, and to familiarize both parties with the responsibilities of each under the terms of this contract. The COR/PI shall arrange the meeting.

2. Anytime work is completed to include: pumping services, site visits, communication that takes place with COR, PI or any other BLM personnel, a report will be emailed to COR.

3. The Contractor shall be available throughout the contract period for consultation with the COR and PI on matters involving sewage pumping.

I. Schedule and Submittals

The following includes a description and general location of all sewage pumping locations. Each location has a specified month in which pumping service must be completed. No alterations to this can occur without prior written consent from the COR (email is acceptable).

An annual report summarizing all materials utilized, summary of findings, and future recommendations will be reported to the COR by May 31 each year. This report will include specific information for each unit as itemized below to provide the most detailed information.

Item No. Description General Location

Estimated Quantity Unit

Unit Price

Trips Per Year Month/s

Total Amount

Pumping of 3-1000 gallon sewage vaults at La Posa South

Immediately south of Quartzsite, AZ off

Highway 95 3,000 Gallons

Bi- Annual

June & January

Pumping of 2-1500 gallon sewage vaults at La Posa South

Immediately south of Quartzsite, AZ off

Highway 95 3,000 Gallons

Bi- Annual

June & January

Pumping of 1-5000 gallon sewage vault at La Posa South for Blue Boys

Immediately south of Quartzsite, AZ off

Highway 95 5,000 Gallons

Bi- Annual

June & January

Pumping 2-12000 gallon dump station vaults at La

Posa South

Immediately south of Quartzsite, AZ off

Highway 95 24,000 Gallons

Bi- Annual

June & January

Pumping 0f 2 5000 gallon sewage vaults at La Posa

Tyson

Immediately south of Quartzsite, AZ off

Highway 95 10000 Gallons

Bi- Annual

June and January

Pumping 1-1500 gallon sewage vault at La Posa

North

Immediately south of Quartzsite, AZ off

Highway 95 1,500 Gallons

Bi- Annual

June &

Pumping 5-1000 gallon sewage vaults at La Posa North

Immediately south of Quartzsite, AZ off

Highway 95 5,000 Gallons

Bi- Annual sewage vault at La Posa

Tyson Wash

Immediately south of Quartzsite, AZ off

Highway 95 1,500 Gallons

Bi- Annual

Pumping 4-1000 gallon sewage vaults at La Posa Tyson Wash

Immediately south of Quartzsite, AZ off

Highway 95 4,000 Gallons

Bi- Annual sewage vault at La Posa

West

Immediately south of Quartzsite, AZ off

Highway 95 1,500 Gallons

Bi- Annual

Pumping of 4-1500 gallon sewage vaults at Oxbow Campground area

Near Blythe, CA (I-10 south on Highway 78)

3,000 Gallons Annual April

Pumping of 3-1000 gallon sewage vaults at

Oxbow campground Holding Tanks

Near Blythe, CA (I-10 south on Highway 78)

3,000 Gallons Bi-

Annual November

& April

Pumping of 4-2500 gallon sewage vault at TK Jones Campground

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 10,000 Gallons

Bi- Annual

Pumping 2-2500 gallon collector lift stations at Tk Jones Campground

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 5,000 Gallons

Bi- Annual

Pumping of 1-1500 gallon sewage vault at Senator Wash Boat Ramp

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 1,500 Gallons

Bi- Annual

November & April

Pumping of 2-12000 gallon sewage vaults at

South Mesa Dump Station

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 24,000 Gallons

Bi- Annual

November & April

Pumping of 2-4000 gallon sewage vaults at South Mesa Comfort

Stations

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 8,000 Gallons

Bi- Annual

November & April

Pumping of 2-1000 gallon sewage vaults at South Mesa Gravel Pit

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 2,000 Gallons

Bi- Annual

November & April

Pumping of 1-1000 gallon sewage vault at South Mesa Contact

Station

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 1,000 Gallons

Bi- Annual

November & April

Pumping of 1-1500 gallon sewage vault at Senator Wash South

Shore

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 1,500 Gallons

Bi- Annual

November & April

Pumping of 5-1000 gallon sewage vaults at

Senator Wash North Shore

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 5,000 Gallons

Bi- Annual

November & April

Pumping of 1-1000 gallon sewage vault at Quail Hill

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 1,000 Gallons

Bi- Annual

Pumping of 2-1000 gallon sewage vaults at Mittry Lake Boat Ramp

7 miles from Yuma, AZ (Off Highway 95 and 7E)

2,000 Gallons Annual April

Pumping of 2-1000 gallon sewage vaults at Betty's Kitchen

7 miles from Yuma, AZ (Off Highway 95 and 7E)

2,000 Gallons Annual April

**Option: Add new location pumping 2-1000 gallon vaults at Oxbow

Near Blythe, CA (I-10 south on Highway 78)

2,000 Gallons Annual if added

**Option: Add new location pumping 2-1000 gallon vaults at Imperial

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) 2,000 Gallons

Annual if added

Emergency Pumping on-call for pump sites listed

1-9

Immediately south of Quartzsite, AZ off

Highway 95 up to 45,500

Gallons TBD

Emergency Pumping on-call for pump sites listed

10-11

Near Blythe, CA (I-10 south on Highway 78) up to 6,000

Gallons TBD

Emergency Pumping on-call for pump sites listed

12-21

Imperial Dam LTVA, CA (Off S-24 and Senator

Wash Road) up to 59,000

Gallons TBD

Emergency Pumping on-call for pump sites listed

22-23

7 miles from Yuma, AZ (Off Highway 95 and 7E) up to 4,000

Gallons TBD

Emergency Pumping on-call for Oxbow Camp Host 3-1000 gallon holding tanks

Near Blythe, CA (I-10 south on Highway 78)

3,000

Gallons

TBD

J. Safety

The Contractor will be required to develop a site-specific Health and Safety Plan (HASP) and Accident Prevention Plan (APP). Potentially hazardous activities include, but are not limited to:

• All field work in temperatures that exceed 100 degrees

• Soil boring or digging test pits (excludes manual collection of de minimis surface soil samples)

• All field work on hazardous waste or munitions response sites

• Work on, in, or near bodies of water where there a danger from drowning

• Use of heavy equipment, e.g. backhoes, excavators, bulldozers, etc.

• Excavation, backfilling, and compaction

• Use of man lifts, ladders, and other climbing apparatus

• Use of weight handing equipment, e.g. crane, forklifts, and hoists

• Well drilling and/or well pump repair or replacement

• Construction, demolition, or repair of site improvements

• Remediation of hazardous material or waste, i.e. asbestos, paint with lead, and

PCB

• Work within 10 ten feet of high voltage lines, or high pressure gas, steam, or water lines

The Contractor shall develop an APP, Activity Hazardous Analysis (AHA) and site-specific HASP in accordance with Occupational Safety and Health Administration (OSHA) and submit the AHA and HASP as attachments to the COR and PI.

Include a job hazard analysis in the HASP for all tasks reasonably anticipated to be performed as part of this scope of work. When developing the HASP, address all sections that are deemed appropriate for performing the work in this contract, while ensuring a safe work environment for all personnel involved.

The Health & Safety Plan will provide a safe and healthful environment for all personnel involved as well as personnel working near the sites for the BLM. The Contractor shall certify to COR that Final HASP has been reviewed with each Contractor employee working on this contract prior to mobilization and start of fieldwork activities.

A Draft and Final APP and HASP will be submitted within 30 days of contract award. The Health and Safety Plan shall be immediately accessible to the Site Safety Officer and Project Manager at all times during the project, and a copy shall be available in every vehicle utilized for work under this contract.

K. Hold Harmless

1. The Government shall not be responsible for the loss of or damage to property of the Contractor and/or his/her representatives, or for personal injuries to the Contractor and/or his/her representatives arising from or incident to the use of government facilities or equipment. Contractor shall indemnify, hold harmless, defend and save Government harmless and shall pay all costs, expenses, and reasonable attorney’s fees for all trial and appellate levels and post-judgment proceedings in connection with any fines, suits, actions, damages, liability and causes of action of every nature whatsoever arising or growing out of, or in any manner connected with, the occupation or use of Government Premises by Contractor, its employees, servants, agents, guests, invitees, and contractors. This includes, but is not limited to, any fines, claims, demands and causes of action of every nature whatsoever that may be made upon, sustained or incurred by the Government by reason of any breach, violation, omission or non-performance of any term, covenant or condition hereof on the part of the Contractor, its employees, servants, agents, guests, invitees, or contractors. This indemnification also applies to claims arising out of the furnishings of any utilities or services by the Government or any interruption therein or failure thereof, occasioned by the negligence or lack of diligence of Contractor or its respective officers, agents, servants or employees. However, this indemnity shall not extend to damages due to the sole fault of the Government or its employees, agents, servants, guests, invitees or contractors. This covenant shall survive the termination of this contract.

2. In the event of damage, including damage by contamination, to any Government property by the Contractor, its officers, agents, servants, employees, or invitees, the Contractor, at the election of the Government, shall promptly repair, replace, or make monetary compensation for the repair or replacement of such property to the satisfaction of the Government.

L. Insurance

The Contractor must comply with FAR 52.228-5, Insurance-Work on a Government Installation (Jan 1997), and DIAR 1452-228-70 Liability Insurance (JUL 1996). Review page 32 of Attachment 2 Clauses and Provisions for Liability Limits.

M. Payments

Invoices can be submitted monthly through the Invoice Processing Platform (IPP). Invoices shall reflect completed work, consistent with the reports provided to the COR.

ATTACHMENT A: MAPS

File details come from the government source that posted it. Updated .