Attachment_1_-_Statement_of_Work_for_Plant_Propagation__Transportation__and_Installation.pdf
PDF 3 MB Posted
- Attached to
- Plant Propagation, Transportation, & Installation Federal contract opportunity
- Solicitation number
- 140R4025Q0070
About this file
This Statement of Work (SOW) details a plant propagation, transportation, and installation project for the Utah Reclamation Mitigation and Conservation Commission's Diamond Fork River aquatic habitat enhancement project. The procurement seeks a contractor to propagate, transport, and install riparian and wetland plants across 1.8 miles of the lower Diamond Fork River, located southeast of Spanish Fork, Utah. The project requires collecting plant materials genetically similar to the local ecosystem, with specific sourcing requirements including collection within a 100-mile radius and at elevations between 4,400 and 7,000 feet.
The contract establishes unit costs for plant propagation, with planting scheduled from October 1 to December 31, 2026, and the potential for +/- 20% quantity adjustments. The project involves planting approximately 25,400 riparian plants in Zones 1-3 and 11,550 riparian plants outside the survey area, along with 8,210 wetland plants in Zone 5. Plants will be installed along linear water channels and around restored ponds and wetlands, with specific placement guided by the Mitigation Commission. The contractor must maintain plant health, provide detailed documentation on plant origins, and be prepared to access potentially challenging terrain, including areas with up to 6-foot deep excavated channels.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_Schedule_B_Price_Breakdown_and_Schedule_B_Plant_Source_Material_Origin__dated_2_October_2025_0004.xlsx | XLSX spreadsheet | |
| Sol_140R4025Q0070_Amd_0004.pdf | ||
| Attachment_1_-_Statement_of_Work_-_Plant_Propagation__Transportation__and_Installation__dated_2_October_2025_0004.pdf | ||
| Sol_140R4025Q0070_Amd_0003.pdf | ||
| Sol_140R4025Q0070_Amd_0002.pdf | ||
| Sol_140R4025Q0070_Amd_0001.pdf | ||
| Attachment_2_-_Schedule_B_Price_Breakdown_and_Schedule_B_Plant_Source_Material_Origin.xlsx | XLSX spreadsheet | |
| Sol_140R4025Q0070.pdf | ||
| Solicitation_140R4025Q0070.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Plant Propagation, Transportation, and Installation for
Lower Diamond Fork River 11 July 2025
1. INTRODUCTION
The Utah Reclamation Mitigation and Conservation Commission (Mitigation Commission) is responsible for mitigating the impacts to fish and wildlife that resulted from construction of the Central Utah Project and other federal Reclamation projects in Utah. As part of its mitigation program the Mitigation Commission has been doing work in the Diamond Fork River, located about 8 miles southeast of Spanish Fork, Utah. During summer 2026 the Mitigation Commission will be constructing an aquatic habitat enhancement project throughout 1.8 miles of the lower Diamond Fork River (Figure 1). Revegetation of restored riparian, wetland, and upland habitats is a key component of the Diamond Fork enhancement project. More information on the Mitigation Commission’s work in Diamond Fork can be found at https://www.mitigationcommission.gov/ watershed/diamondfork/watershed diamond.html
2. PROCUREMENT PURPOSE
The purpose of this procurement is to acquire a contractor to propagate, transport, and install riparian and wetland plants needed for the revegetation efforts associated with the enhancement of aquatic habitat of Diamond Fork River. This procurement establishes a unit cost (cost per plant) for the propagation, transportation, and installation of plants within the Diamond Fork River floodplain as shown in Figure 2. Unit costs shall be inclusive of all costs associated with the propagation, transportation, and installation of plants including but not limited to supplies, materials, equipment, labor, and travel. See Schedule B (Price Breakdown) for unit and total cost documentation which must be filled in and provided with all contractor bids.
The Mitigation Commission is responsible for reasonably preparing the site for installation (i.e.
for disturbed locations site will generally be cleared of existing vegetation if necessary, topsoil will be spread over the plant surface from material salvaged during excavation, the site would be contoured so it looks natural, etc.). Plants shall be installed from October 1, 2026, to December 31, 2026. The exact dates for planting during this timeframe will be determined cooperatively by mutual agreement between the Mitigation Commission and the Contractor. The estimated quantities and size mix of plants for fall 2026 planting may be adjusted by +/- 20% through mutual agreement of both parties via a bilateral modification to this contract. Should the Mitigation Commission desire to delay planting from the October 1, 2026, to December 31, 2026, timeframe to the spring of the following year, any additional costs associated with such a delay will be negotiated and formalized through a bilateral modification to this contract.
Prior to installation, the contractor shall be provided a detailed map showing the zones in which each species will be installed and will receive on-site in person direction from the Mitigation Commission and its construction consultants. Rooted plants shall generally be installed along linear water conveyance channels (approx. 150 plants per 0.1 mile) and grouped along margins file://bor/uc/URM/Team/PROJECTS/Diamond%20Fork_DIAFM/COR_Files_DIAFM/PWS%20for%20Reveg%20Contract/found%20at%20https:/www.mitigationcommission.gov/%20watershed/diamondfork/watershed%20diamond.html file://bor/uc/URM/Team/PROJECTS/Diamond%20Fork_DIAFM/COR_Files_DIAFM/PWS%20for%20Reveg%20Contract/found%20at%20https:/www.mitigationcommission.gov/%20watershed/diamondfork/watershed%20diamond.html
Figure 1. Project area detail.
of created/restored ponds and wetlands. The exact placement of plants, and schedule of the revegetation efforts will depend on completion of construction, species-specific requirements for plant propagation and establishment, and coordination with the Mitigation Commission, its construction consultant, and the planting consultant. The approximate planting areas are shown in Figure 2. Access to planting areas will generally become more difficult as the restoration project features are constructed. Access to the perimeter of planting areas by vehicles or ATV’s will generally be available from the northwest side of the river from Diamond Fork Road, and from the southeast side of the river from a two-track assess path. Although diversion of the Diamond Fork River into newly created channel sections will be limited, accessing planting areas on the interior of the project may still require crossing inundated wetlands and excavated channels, some up to 6 feet in depth.
Figure 2. Restoration planting plan zone map.
3. REQUIREMENTS
Task 1 – Propagation of Plant Materials
The Contractor shall provide the following:
1) Collect plant materials which are genetically the same as or similar to the Diamond Fork River project’s riparian and wetland community in which they will be installed. To maintain the genetic integrity of the local plant community, plant materials shall be collected within a 100-mile radius of Diamond Fork River conflucence with the Spanish Fork River and preferably from these two watersheds if possible. Plant materials shall be collected from areas with an elevation ranging between 4,400 and 7,000 feet above mean sea level. The selected contractor shall submit updated Schedule B (Plant Source Material Origin) prior to plant delivery with information documenting origin of plant materials with regard to elevation and location. Plant materials will be inspected by the Mitigation Commission at the contractor’s nursery site and at the project site upon delivery. The Mitigation Commission will schedule in advance inspections at the contractor’s facilities. Materials deemed UNHEALTHY by the Contracting Officer’s Representative will not be accepted.
2) Propagate and maintain plants in a healthy condition until needed by the Mitigation Commission for installation.
Task 2 – Installation of Plant Materials
The Contractor shall provide the following:
1) Ensure delivery of plant materials to the project site in a timely manner.
2) Provide all labor, materials and equipment needed to install propagated plants.
3) Install plants at locations directed on-site by the Mitigation Commission or its construction consultant.
4) Make recommendations to the Mitigation Commission or its consultant that will ensure/enhance plant survival and growth.
IMPORTANT NOTES
• It is the responsibility of the contractor to maintain healthy plants up to the point in which plants are installed according to the specifications. In order to maintain healthy plants during the installation phase of the project, it may require the contractor to deliver plants over a period of several days. All costs associated with plant delivery shall be included in the unit prices quoted.
• Payment will be based on quantity of plants ACCEPTED by the Government. Inspection by the Government to be performed at the nursery where plants are being propagated and on-site during the installation phase. Plants must be HEALTHY in the opinion of the Mitigation Commission.
• The estimated quantities of plants for fall 2026 planting may be adjusted bi-laterally at any time prior to plant installation. The Mitigation Commission may also wish to delay planting from the October 1, 2026, to December 31, 2026, timeframe to the spring of the following year.
• The Diamond Fork project is generally accessible by 4x4 truck, but ATVs may be required to access some planting locations. Access will become more difficult as project features are constructed. Even under pre-project conditions the project area can be very wet depending upon Diamond Fork River levels and the water table.
• Planting zones habitat types include riparian hydric, riparian mesic, riparian transitional, and herbaceous wetland (Figure 2 and Tables 1-3). Locations for planting will range from riparian areas with little to no disturbance to areas that are fully disturbed with bare soil. Some planting areas will be adjacent to small, ponded habitat as well as newly created and existing riverbank. See Figures 3-7 for images of representative planting areas. See Figure 8 for soil map of Diamond Fork project area.
Table 1. Riparian plantings for Zones 1-3, Diamond Fork Aquatic Enhancement Project.
Table 2. Riparian plantings outside of survey area for Zones 2-3, Diamond Fork Aquatic Enhancement Project.
AVAILABLE CONTAINER SIZES
BOTANICAL NAME COMMON NAME GROWTH FORM
1 Betula occidentalis River Birch Tree 2050 50 2000
1 Salix boothii Booth's willow Shrub/Tree 3500 200 300 1000 2000
1 Salix lutea Yellow willow Shrub 3500 200 300 1000 2000
1 Salix exigua Coyote Willow Shrub 3000 500 500 1000 1000
1 Cornus sericea Redosier dogwood Shrub 2000 500 500 1000
2 Populus angustifolia Narrowleaf cottonwood Tree 2100 400 500 600 600
2 Ribes aureum Golden current Shrub 1050 50 100 500 400
2 Rhus trilobata Skunkbush sumac Shrub 1050 50 100 500 400
2 Craetagus douglassi Black hawthorne Shrub/Tree 500 50 100 200 150
2 Asclepias speciosa Showy milkweed Forb 1050 50 500 500
3 Acre Negundo Boxelder Tree 500 50 200 250
3 Acer Grandidentatum Big toothed maple Tree 1000 50 200 500 250
3 Amelanchier utahensis Utah serviceberry Shrub/Tree 1000 50 200 500 250
3 Symphoricarpos albus Common snowberry Shrub 1000 50 300 500 150
3 Prunus virginiana Chokecherry Shrub/Tree 1050 50 500 500
3 Asclepias speciosa Showy milkweed Forb 1050 50 500 500
TOTAL 25,400
RIPARIAN PLANTINGS (ZONES 1-3)
QUANTITY 30" Tall Pot 27 CI 10 CI1 GAL
SPECIES NAME
ZONE D40
(3.5inx14in)
D60 (3.5inx17in)
AVAILABLE CONTAINER SIZES
BOTANICAL NAME COMMON NAME GROWTH FORM
2 Populus angustifolia Narrowleaf cottonwood Tree 600 100 200 200 100
2 Ribes aureum Golden current Shrub 850 50 200 400 200
2 Rhus trilobata Skunkbush sumac Shrub 750 50 200 300 200
2 Craetagus douglassi Black hawthorne Shrub/Tree 400 50 100 200 50
2 Asclepias speciosa Showy milkweed Forb 550 50 300 200
3 Acre Negundo Boxelder Tree 1000 100 200 500 200
3 Acer Grandidentatum Big toothed maple Tree 2000 500 500 500 500
3 Amelanchier utahensis Utah serviceberry Shrub/Tree 2000 500 500 500 500
3 Symphoricarpos albus Common snowberry Shrub 2100 100 500 500 1000
3 Asclepias speciosa Showy milkweed Forb 550 50 300 200
3 Prunus virginiana Chokecherry Shrub/Tree 750 50 200 100 400
TOTAL 11,550
10 CI
RIPARIAN PLANTINGS OUTSIDE SURVEY AREA (ZONES 2-3)
ZONE
SPECIES NAME
QUANTITY 1 GAL 30" Tall Pot
D60 (3.5inx17in)
D40 (3.5inx14in) 27 CI
Table 3. Wetland plantings for Zone 5, Diamond Fork Aquatic Enhancement Project.
Figure 3. Representative area of Diamond Fork River with no disturbance which will need riparian vegetation planting.
BOTANICAL NAME COMMON NAME
5 Eleocharis palustris Common spikerush 200 500 20 720 5 Carex praegracilis Meadow sedge 200 400 600 5 Calamagrostis canadensis Bluejoint 200 400 600 5 Verbena hastata Blue vervain 50 800 850 5 Goldenrod Solidago canadensis 50 800 850 5 Carex rostrata Beaked sedge 200 500 20 720 5 Carex pellita Woolly Sedge 200 500 20 720 5 Asclepias incarnata Swamp milkweed 50 100 400 550 5 Juncus ensifolius Swordleaf rush 200 500 700 5 Symphytrichum ascendens Western aster 50 50 500 600 5 Pascopyrum smithii Western wheatgrass 200 500 700 5 Helianthus nuttalii Nuttal's sunflower 50 50 500 600
Total 8210
Quanty
WETLAND PLANTINGS (ZONE 5)
Zone SPECIES NAME
10 CU INCH SOD MAT
16'X3'
AVAILABLE CONTAINER SIZES
1 GAL 16 CU INCH
Figure 4. Representative area of Diamond Fork River with no disturbance which will need riparian vegetation planting.
Figure 5. Representative photo of ponded area which will need riparian vegetation planting.
Figure 6. Representative open area with high amount of disturbance which will need riparian vegetation planting.
Figure 7. Representative pond/channel related disturbance which will need riparian vegetation planting.
Figure 8. Soil map of Diamond Fork River project area.
| 2. PROCUREMENT PURPOSE |
| 3. REQUIREMENTS |
File details come from the government source that posted it. Updated .