This is a Statement of Work for the supply and tailgate spreading of aggregate materials at Cache River National Wildlife Refuge in Arkansas. The contractor shall supply and deliver approximately 1,265 tons of aggregate consisting of 1,125 tons of SB2 limestone and 140 tons of B-Stone to be applied at a depth of three inches on existing refuge roads across eight specified locations in Woodruff, Prairie, and Monroe Counties. Delivery locations include Bayou Deview North Road (140 tons SB2), Thompson Road (140 tons SB2), Horseshoe Lake Road (140 tons SB2), Robe Bayou Road (140 tons SB2), Barnes Lake Road (140 tons SB2), Penn's Bay Road (140 tons SB2), Morris Tract Road (140 tons B-Stone), and Howell Road (285 tons SB2). All delivery trucks must be equipped with tailgate chains to ensure consistent spreading of material. The period of performance is 60 days, with deliveries coordinated through the site representative, Eli Stinson (Elliotte_stinson@fws.gov, 501-530-6986).

The contractor is required to deliver a minimum of 100 tons of limestone daily between 7:30 AM and 5:00 PM, Monday through Friday only. Deliveries will not be accepted on weekends, federal holidays, or during wet conditions that could adversely affect roads and parking areas. Each road or group of roads must be completed before proceeding to the next location. The contractor remains responsible for all equipment utilized for delivery and tailgate spreading. Scale tickets indicating material weight, material type, and delivery date must be provided to the refuge representative for each load. Two reference maps showing the Cache River NWR Aggregate North and South locations with beginning coordinates are provided to identify the delivery sites.

View the file

Other files for this federal contract opportunity

Other files attached to AR-CACHE RIVER NWR-AGGREGATE, newest first.
File Type Posted
Attachment_4_B03__-_Service_Contract_Act_WD_2015-5123.pdf PDF
Sol_140FS326Q0169.pdf PDF
Attachment_2_-_Price_Schedule.pdf PDF
Attachment_3_-_PAST_EXPERIENCE_REFERENCES_2026.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e | 1 Attachment 1 – Statement of Work

Supply and Tailgate Spreading of SB2 and B-Stone Aggregate at the Cache River National Wildlife Refuge

Specifications / Scope of Work

The contractor shall supply and deliver approximately 1,265 tons of aggregate consisting of 1,125 tons of SB2 limestone and 140 tons of B-Stone for tailgate spreading on existing refuge roads. The aggregate must be delivered and applied to a depth of approximately three (3) inches at the Cache River National Wildlife Refuge (NWR), located in Woodruff, Prairie, and Monroe Counties, Arkansas.

Site Representative: Eli Stinson

Elliotte_stinson@fws.gov

501-530-6986

Delivery locations and required quantities are as follows:

1. Bayou Deview North Road (Asset #10039123): 140 tons, SB2

2. Thompson Road (Asset #10017451): 140 tons, SB2

3. Horseshoe Lake Road (Asset #10017440): 140 tons, SB2

4. Robe Bayou Road (Asset #10017467): 140 tons, SB2

5. Barnes Lake Road (Asset #10017442): 140 tons, SB2

6. Penn's Bay Road (Asset #10051097): 140 tons, SB2

7. Morris Tract Road (Asset #10017443): 140 tons, B-Stone

8. Howell Road (Asset #10038765): 285 tons, SB2

Total Quantity: 1,265 tons of aggregate (comprising 1,125 tons of SB2 and 140 tons of B-Stone), to be delivered and tailgate spread as directed by refuge personnel.

All delivery trucks must be equipped with tailgate chains to ensure consistent spreading of aggregate. Trucks lacking appropriate chains will not be permitted to deliver and will be redirected.

Period of Performance: 60 days

The contractor is required to coordinate with the refuge representative to deliver a minimum of 100 tons of limestone daily, between 7:30 AM and 5:00 PM, Monday through Friday. Deliveries will not be accepted on weekends, federal holidays, or during wet conditions that could adversely affect roads and parking areas. The contractor remains responsible for all equipment utilized for delivery and tailgate spreading. Each road or group of roads must be completed

P a g e | 2 before proceeding to the next location. Scale tickets indicating material weight, material type, and delivery date must be provided to the refuge representative for each load.

P a g e | 3

Map 1 with coordinates of beginning locations

P a g e | 4

Map 1 with coordinates of beginning locations

End of Scope

File details come from the government source that posted it. Updated .