Attachment 1 Statement of Work Electric Forklift Rental dated 1 August 2025.pdf
PDF 533 KB Posted
- Attached to
- 36 LRS E-Forklift Rental Services
- Solicitation number
- FA524025Q0047
About this file
This Statement of Work (SOW) details a one-year rental contract for two electric forklifts for the 36th Logistics Readiness Squadron (36 LRS) at Andersen Air Force Base in Guam. The specific requirement is for two EZ-R40TT Reach Truck electric forklifts with precise technical specifications, including a 210.9" lift height, 36V voltage, 4,500 lbs maximum capacity at 200", and indoor warehouse use only. The contractor must provide transportation of the forklifts, perform all general maintenance and repairs, and replace any inoperable forklift within 3 business days.
The SOW outlines comprehensive operational and security requirements, including normal operating hours from 0730 to 1630 Monday through Friday, a requirement for a point of contact who can respond within 1-2 hours, and strict base security protocols. Contractors must comply with base traffic regulations, prohibition of weapons, handling of sensitive information, and physical security standards. The government will provide a battery charging station, and emergency medical transportation if needed, with the contractor responsible for reimbursing medical service costs. The contract is set to begin on 1 August 2025 and will be executed at the 36 LRS Base Supply, Building 18002, located on Arc Light Boulevard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Provisions and Clauses FA524025Q0047.pdf | ||
| COMBO 36 LRS E-Forklift Rental Services 5 Aug.pdf | ||
| Attachment 3 SCA Wage Determinations 8 JULY 2025.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
36 LRS ELECTRIC FORKLIFT RENTAL
SERVICES
ANDERSEN AFB, GUAM
1 Aug 2025
Table of Contents
1. DESCRIPTION OF SERVICES
1.1 REQUIREMENTS:
1.2 LIABILITY:
1.3 GOVERNMENT FURNISHED SERVICES:
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION:
2.2 CONTRACTOR PERSONNEL:
3. SECURITY
3.1 PASS AND IDENTIFICATION ITEMS:
3.2 RETRIEVING IDENTIFICATION MEDIA:
3.3 TRAFFIC LAWS:
3.4 WEAPONS, FIREARMS, AND AMMUNITION:
3.5 FOR OFFICIAL USE ONLY (FOUO):
3.6 REPORTING REQUIREMENTS:
3.7 PHYSICAL SECURITY:
1. DESCRIPTION OF SERVICES
1.1 REQUIREMENTS:
The 36th Logistics Readiness Squadron (36 LRS) requires a one-year rental of two EZ-R40TT Reach Truck electric forklifts.
The Contractor shall provide all transportation for their Electric Forklifts to and from 36 LRS Base Supply, Bldg 18002, Arc Light Blvd. 36 LRS/LGRM requires two electric forklift Reach Trucks Indoor warehouse use only to help augment warehouse operations. Additional characteristics as follows. Fuel Type: Electric. Elevated Lift Height: 210.9" (17.5ft) . Baseleg Overall Width: 44". Baseleg Inside Width: 32.9". Voltage: 36V. Mast Lift Stop Height:
200"(17ft). Max Capacity @ 200": 4,500 lbs. Max Capacity @ 211": 4,000 lbs. Vertical & Horizontal Load Center: 24". Steering: Forward. Fork Lowered Height: 2.9’. Sideshift: 2’.
Alarm: All Travel. Full Height Mast Guard. Vendor will provide all general maintenance, troubleshooting, and repairs as necessary reported by customer (36 LRS/LGRM). Vendor battery charger is not required. 36 LRS has a battery charging station located in B18002.
Contractor must provide replacement forklift if one becomes inoperable no later than 3 business day.
1.2 LIABILITY:
The contractor shall be liable for any damages resulting from any carelessness or failure to follow proper safety, installation, engineering, or maintenance procedures and standards.
1.3 GOVERNMENT FURNISHED SERVICES:
The government will provide emergency medical transportation and treatment if required. The contractor shall reimburse the Government for the cost of these medical services at current rates.
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION:
The normal hours of operation for the project are from 0730 to 1630, Monday through Friday, excluding holidays and PACAF Family days.
2.2 CONTRACTOR PERSONNEL:
The contractor shall provide point of contact (POC) for all contractual matters during all hours of operation. The POC shall respond on-site within 1 hour during normal duty hours of operation and within 2 hours during non-duty hours to discuss concerns with government personnel designated by the CO to discuss problem areas.
3. SECURITY
3.1 PASS AND IDENTIFICATION ITEMS:
The contractor shall ensure the pass and identification items required for contract performance are obtained for employees.
3.2 RETRIEVING IDENTIFICATION MEDIA: N/A Contractor will their own Defense Biometric Identification System access.
3.3 TRAFFIC LAWS:
The contractor and its employees shall comply with base traffic regulations. Traffic regulations include, but are not limited to:
Employees shall wear seatbelts when operating or riding in any vehicle (military, company or private owned) while on installation.
Speed limits on Andersen AFB are 25 MPH unless otherwise posted. Be aware of reduced speed limits and exercise caution when driving in base housing and school zones.
All vehicle operators on the installation shall not use cell phones unless the vehicle is safely parked or they are using a 100% hands free device. The wearing of any other portable headphones, earphones or other listening devices while operating a motor vehicle is prohibited.
3.4 WEAPONS, FIREARMS, AND AMMUNITION:
Employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within vehicles (military, contractor-owned, or privately owned) while on Andersen AFB.
3.5 FOR OFFICIAL USE ONLY (FOUO):
The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
3.6 REPORTING REQUIREMENTS:
Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified/unclassified defense information. Employees shall be briefed by their immediate supervisor upon initial on-base assignment.
3.7 PHYSICAL SECURITY:
The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment and materials shall be secured.
File details come from the government source that posted it. Updated .