This solicitation is for a domestic water boiler system at the USDA Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area in Tucson, Arizona. The solicitation number is 12905B23Q0212 and is seeking proposals to replace an existing boiler with a new high-efficiency condensing boiler system, including all necessary piping, pumps, controls, and ancillary equipment. Proposals are due by April 15, 2023 and the contract is expected to be awarded by May 15, 2023. The project is set aside for small businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
BUILDING 107 DOMESTIC WATER
BOILER REPLACEMENT
CARL HAYDEN BEE RESEARCH CENTER
TUCSON, AZ
Date: 6/22/2023
STATEMENT OF WORK
1.0 CONTRACT PROJECT:
a. Project Number: TBD
b. Project Title: Building 107 Domestic water boiler replacement
c. Project Location: Carl Hayden and Southwest Watershed Research Center 2000 E. Allen Road, Tucson AZ
2.0 PROJECT CONTACT PERSONS:
a. CONTRACTING OFFICER (CO):
Michael Sherlock
USDA-ARS-PWA-APPF
Email: Michael.Sherlock@usda.gov
b. CONTRACTING SPECIALIST (CS):
Michael Sherlock
USDA-ARS-PWA-APPF
Email: Michael.Sherlock@usda.gov
c. LOCATION MONITOR (LM):
Roger Clemo
USDA-ARS-PWA
2000 E. Allen Road, Tucson AZ 85719 Email: roger.clemo@usda.gov Tel. No.: 520-330-1896
d. ADMINISTRATIVE OFFICER (AO):
Laura Elmore
USDA-ARS-PWA
2000 E. Allen Road, Tucson AZ 85719 Email: laura.elmore@usda.gov Tel. No.: 520-647-9160
e. CONTRACTING OFFICERS REPRESENTATIVE (COR):
Roger Clemo
USDA-ARS-PWA
2000 E. Allen Road, Tucson AZ 85719 Email: roger.clemo@usda.gov Tel. No.: 520-330-1896
f. AREA SAFETY AND HEALTH MANAGER Ken Cushman
USDA-ARS-PWA
800 Buchanan Street Albany, CA 94710 Email: ken.cushman@usda.gov Tel. No.: 510-529-5921
g. ENGINEERING PROJECT MANAGER (EPM) Peter Lane
USDA-ARS-PWA
800 Buchanan St. Albany, CA 94710
Email: peter.lane@usda.gov Tel. No.: 510-559-6340 mailto:roger.clemo@usda.gov mailto:laura.elmore@usda.gov mailto:roger.clemo@usda.gov mailto:ken.cushman@usda.gov mailto:peter.lane@usda.gov
3.0 PROJECT
DESCRIPTION:
Domestic water boiler replacement in building 107 basement boiler room.
4.0 PROJECT REQUIREMENTS:
a. Provide a standard commercial warranty against product defect and breakage and one year warranty on labor and other parts.
b. Contractors shall provide and maintain all necessary guards, lights, barricades, etc., to protect persons, property, and materials in and around the site.
c. Do not disturb hazardous materials and report condition immediately to the Contracting Officer’s Representative (COR) regarding potentially hazardous conditions that are uncovered. Stop work in the area of the questionable material or condition until identification and direction is provided.
d. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e., IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.
e. All work shall meet all pertinent Unified Facilities Guide Specifications (UFGS) and ARS 242.1M standards. UFGS available at http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs. ARS 242.1M is attached.
4.1 Background & Site Description:
Carl Hayden Bee Research facility
4.2 Bid Schedule:
Provide all labor, equipment and materials to perform this Statement of Work and Schedule of Items.
4.3 Description of Work:
1. Work
• Coordinate work with on-site staff.
• Lock out/tag out electrical, natural gas and domestic water.
• Disconnect flue piping and environmentally dispose of (1) boiler.
• Provide and install (1) Parker model WH300 indirect fired water heater in existing location.
• Provide and install (1) new Bell and Gossett ½ hp inline pump.
• Reconnect flue piping to existing with new draft hood, flue piping and fittings as required.
• Reconnect natural gas piping with new piping and fittings as required.
http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/ https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/
• Reconnect domestic water supply and return piping with new copper piping and fittings as required.
• Reconnect electrical with new seal tight, wire and fittings as required.
• Start up and check for proper operation.
• Provide domestic water sterilization for boiler only.
• Reinsulate new piping to match existing.
• Provide IOM manuals.
• Provide 1 year warranty on all labor, equipment and materials supplied by DLJCG.
2. Contractor responsibility
• It is the responsibility of the contractor to conduct a pre-construction walk through.
4.4 Government Furnished Equipment\Services
The government will furnish a reasonable amount of electricity and water.
5.0 GENERAL REQUIREMENTS:
5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Government. All disturbances of existing systems shall be thoroughly coordinated with the Government to prevent disturbances that might jeopardize on-going operations and research. Government reserves the right to retain any equipment / materials removed as part of the scope of work. The contractor shall coordinate any equipment / materials to be retained with the Government prior to starting demolition operations. The contractor shall legally dispose all any materials removed that will not be retained.
5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.
5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the Location Monitor for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. The contractor is responsible for any costs incurred for equipment ordered without prior approval.
5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor.
5.6 Protection of Work and Property/Safety Requirements:
a. Contractor shall furnish a Site-Specific Safety Plan (SSSP) or Accident Prevention Plan (APP) ten days after contract award. SSSP / APP shall be approved by the Government before construction work commences.
b. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the Location Monitor.
c. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.
d. The contractor is responsible for verifying location of any underground utility and is responsible for any damaged caused to such utilities.
5.7 Temporary Facilities:
a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b. Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the Location Monitor twenty-one (21) working days prior to the need.
5.8 Materials and Equipment:
a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.
b. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft, or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/Location Monitor.
c. Government will not furnish any labor or equipment to unload or move materials or supplies.
5.9 Cleanup: The construction site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the Location Monitor.
5.10 Warranty:
a. Submit one year warranty on labor, equipment and materials supplied by DLJCG, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.
b. Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.
5.11 Final Payment/Contract Closeout: The following documents are REQUIRED PRIOR TO FINAL PAYMENT (other documents may also be required):
a. General contractor’s minimum one (1) year warranty on work.
b. Manufacturer specified warranty on equipment only.
c. Operation and Maintenance Data
d. Release of liens.
e. Final Invoice
6.0 PROJECT SCHEDULE: The Contract time for this project is 90 calendar days from Notice to Proceed. Contractor shall install new system prior to demolishing existing AC and coordinate switchover with Location Monitor.
7.0 Drawings and Pictures
| Bldg 107 Domestic water boiler replacement - SOW Tucson Facilities |
| United States Department of Agriculture |
| Agricultural Research Service |
| Floorplan |
| Mech room picture |
| Outside picture |
| Outside picure 2 |
File details come from the government source that posted it. Updated .