ATTACHMENT 1 STATEMENT OF WORK.pdf
PDF 2 MB Posted
- Attached to
- Coral Laboratory Refurbishment
- Solicitation number
- 1305M323RNRMA0029
About this file
This document outlines requirements for a construction services request for proposal from the National Oceanic and Atmospheric Administration. The solicitation seeks proposals to renovate approximately 1,900 square feet of existing office and laboratory space at the Atlantic Oceanographic & Meteorological Laboratory into a coral laboratory. The base bid includes demolition of interior walls and removal of flooring and ceilings. It also requires installation of new interior walls, doors, casework, sinks, flooring, paint, mechanical systems, plumbing and electrical work. The document lists five contract line items for the base bid work, casework, alternate door styles, epoxy flooring and an exhaust fan system. Responses are due by August 15, 2023 and the contract is to be awarded by September 30, 2023. The selected contractor will coordinate with the government to ensure proper installation of owner-furnished scientific equipment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Atlantic Oceanographic & Meteorological Laboratory (AOML) Office of Atmospheric Research
National Oceanic & Atmospheric Administration U.S. Department of Commerce
Documentation Support Services
General Information:
The purpose of this Request for Proposal (RFP) Construction Services is to solicit proposals from qualified firms to provide construction services for the Room 341 Coral Laboratory Renovation. The Work shall consist of repurposing the existing OCED electronics laboratory and office space on the 3rd Floor of the Main Building into a newly renovated Coral Laboratory space with an altered layout to optimize existing space in support of the mission. AOML has provided drawings and details that illustrate the intent of the Work. The Contractor will be required to re-use and/or tie-ins to existing MEPS and Fire Alarm as part of the Work.
Bidders Information:
This requirement includes a base bid plus four contract line items add alternates:
Base Bid:
The base bid represents the permit issue set of documents dated 06/14/23 excluding the cost of the lab casework and exhaust system. Also, the flooring in the base bid is vct in lieu of epoxy and the doors are solid wood without the storefront (hollow metal) glass and glazing package.
CLIN 0001- Coral Laboratory Refurbishment - BASE CLIN 0002- Provide Laboratory Casework CLIN 0003- Glass Doors and Glass Storefront Glazing CLIN 0004- Epoxy Flooring in Lieu of VCT CLIN 0005- Exhaust Fan System
Specific Requirements:
The newly renovated space will be approximately 1,900 square feet of planned office and scientific laboratory space in lieu of the existing offices and electronics laboratory space. Modifications to the existing space are considered minimal. The existing offices remain in place and are refreshed. The electronics laboratory is being replaced by the scientific laboratory while repurposing the same infrastructure to support the reconfiguration. Work shall also include the following:
Demolition:
The contractor shall anticipate completing the following:
● Remove existing interior walls, as shown on the drawing Figure 02 (below) approximately forty-five (45) linear feet.
● The perimeter walls are to remain.
● Remove portions of the Interior walls and perimeter walls to rough in electrical and low voltage Work.
● Remove existing VCT Flooring including adhesive.
● Remove existing acoustical ceiling grid and acoustical ceiling tile. The new ceiling will be an exposed ceiling condition.
● Remove flex duct, registers, grills and diffusers in ceiling to prepare for exposed ceiling reveal.
● Remove low voltage cable in ceiling to prepare for exposed ceiling reveal.
● Remove the existing interior walls that are wood stud framing and drywall.
● Infill one existing door location with stud framing and sheetrock.
● Cut-in one (1) new door location at perimeter drywall.
● Relocate one (1) existing door opening for a new door and frame. Reframe the opening.
● The perimeter walls that remain will require some cut and patch and/or drywall finish Work for new devices.
● The existing walls to be demolished are approximately 8’-0” high.
Figure 02. Remove interior walls from existing lay out as described above. Offices to remain.
Structural:
● The existing structure in most cases is poured in place concrete.
● The existing structure shall remain in place and be re-used as part of the renovation.
● The existing structure is approximately 14’-0” high.
● The perimeter walls to remain are all full height partitions.
● The Contractor shall make repairs to the drywall at the top of the perimeter walls to provide a seal tight condition as a smoke barrier.
● New interior wall shall be full height partitions for the Work.
Architectural Woodwork:
● Provide one (1) plastic laminate shelving unit with non-reactive counter as illustrated in Figure 03 (below).
o Dimensions of case work: 199 in wide, 30 in deep, 36 in high o Six (6) open shelves underneath that are 15.25 in high by 61.5 wide o Shelf material should support 150 lbs per shelf.
Figure 03 - Custom case work for back wall of Carbonate Chemistry Lab with 6 shelves all 15.25in H x 61.5 Win.
Total unit is 199 in W x 30 in D x 36in H
● Provide a cabinet and frame with non-reactive counter top for three (3) sink locations.
o Sinks shall be 25”x 22” x12” 14-gauge stainless steel drop-in single bowl with faucet.
o Base cabinet to support 16” of non-reactive counter top on each side of sink.
● All other counters and cabinets shown are for reference only. Provide cost as CLIN 1.
o No counters, upper cabinets or shelves other than what has been documented above shall be included in the Work. Only blocking for these cabinets, shelves, drying racks and monitors are to be included.
o Modular counters with cabinets to be provided by others.
Doors/Frames/Hardware
● Provide three (3) new corridor doors. Doors are to be pre-finished wood 3–0” x 7’-0” with a painted hollow metal frame.
● Provide four (4) new office doors. Doors are to be pre-finished wood 3–0” x 7’-0” with a painted hollow metal frame.
CLIN No. 02 shall be to provide the three (3) corridor doors with and aluminum frame and the four (4) corridor doors with an aluminum frame that shall also include a full height integrated vision panel within the wood door panel assembly (Side panel shown in this picture is not included or required- picture only).
Figure 04 – Pre-finished 3’0”-7’-0” doors with integrated full height vision panels.
Architectural:
● At locations where new sinks are installed, the government requires the Contractor to increase the width of the wall cavity to accommodate the plumbing rough-in.
● Provide blocking for upper cabinets, drying racks and audio-visual monitor locations. Existing drywall to be removed for blocking and then restored prior to installing finishes.
● The existing acoustical ceilings are removed. The new ceilings will be exposed.
Figure 04 (Above) illustrates a photograph of the exposed ceiling with MEPS blacked out; planned for the space.
● The existing VCT floors are being removed inclusive of the adhesive. The new floors are to be vct.
● CLIN No. 03 is to provide the cost for epoxy flooring in lieu of VCT.
Figure 05 illustrates gray epoxy floors (to be included as an add alternate price in the proposal)
● Provide new resilient cove base trim at the floor to wall transition throughout the space.
● Provide new interior paint finish. One (1) prime coat with two (2) finish coats. Include patching and sanding with tough up primer between finish coats.
Figure 06 (Above) illustrates the location of new walls in the proposed lay out.
Figure 07 (Above) illustrated a 3d plan view model of the new proposed layout
Mechanical:
● Provide all new mechanical branch lines, duct drops, registers, grills, and diffusers in support of the renovation Work. Tap-in location and revised distribution is shown on the contract documents.
● Any structural supports required to properly support the new MEP installation inclusive of the MEP required by the Owner Equipment are included in the Work.
● Ceiling will be left exposed, painted black. Ceiling shall look neat and orderly with proper hangers, rings, and strings, etc. to properly support the Work.
CLIN No. 04 is to provide the cost for the exhaust system which is a separate and independent system from the HVAC System.
Plumbing:
● Provide all new plumbing such as domestic water, sewer, vents and drains in support of the renovation Work.
● The Work includes three (3) new sinks and two (2) new sink eye wash stations.
● There are two (2) existing sink that are to be removed.
● Contractor shall review and confirm the size of the existing sanitary pipe to confirm whether the existing system can handle the required tie-in for new sink locations.
Low Voltage Work:
● Provide a conduit, duplex backbox and blank off cover adjacent to each of the electrical devices locations in the walls for the offices, behind the monitors and above the counters.
● Provide six (6), twelve-foot (12) drop ceiling power cables (at counter locations in the center aisles).
Figure 05 illustrates conduit raceway for ethernet connection at all points with arrows. All blue arrows will be positioned under desk height. All orange arrows will be placed above the countertop to directly connect to a mounted screen.
Fire Alarm System:
● The Contractor shall cut back and re-install existing Fire Alarm System.
● Locations are shown on the contract documents.
● Ceiling will be left exposed, painted black. Ceiling shall look neat and orderly with proper hangers, rings, and
Figure 06 illustrates exposed ceiling painted black with power and ethernet drop downs
Sprinkler System:
● This area of the building does not require sprinkler coverage therefore it shall be excluded from the Work.
National Environmental Policy Act (NEPA) Environmental Assessment Policy Requirements:
● The National Environmental Policy Act (NEPA) Environmental Assessment (EA) to evaluate potential environmental impacts has been completed by the Government with an appropriate FONSI and/or ESI.
● This Contractor is responsible for ensuring all construction projects have NEPA review documentation.
Owner Equipment Matrix (Power and Layout Coordination)
● The Owner Equipment Matrix illustrates the pieces of equipment being installed in the space post construction.
Coordination shall be made to make sure outlets and registers/diffusers for power and cooling are in close proximity to the locations illustrated on the plans (below).
Electrical View 1. – Owner Equipment Locations (Attachment provided with power and cooling requirements).
Electrical:
● Provide all new electrical distribution in support of the renovation Work.
● Circuit designations are shown on the contract documents.
● Provide six (6), twelve-foot (12) drop ceiling power cables (at counter locations in the center aisles).
● Ceiling will be left exposed, painted black. Ceiling shall look neat and orderly with proper hangers, rings, and
Electrical View 2. General View of New Space with Blackout Locations for new devices
Electrical View 3. - Outlets anticipated to be approximately six (6) feet apart
Electrical View 4. - Outlets anticipated to be approximately six (6) feet apart
Electrical View 5- Specialized Electrical Considerations (240V for Ovens, Waterproof for Coral Tanks)
Electrical View 6 - Specialized Electrical Considerations- Coral Tanks – Eight (8) outlets with waterproof cover
Electrical View 7- Specialized Electrical Considerations- Carbonate chemistry room Two (2) 240V outlets
Electrical Panel and Above Ceiling Photography:
Electrical Room- Across the Hall Panels Numbered Panel Schedules Present and Up To Date
240V Circuit Above ceiling conduit & MC cable Hard Ducted Exhaust at Future Oven Location
Hard duct returns Hard Ducted Supply Diffusers Space Above Drop Ceiling- New to be exposed
Point of contact list
Scott Burnham Technical Point of Contact 4301 Rickenbacker Causeway, Miami, FL 33149 Scott.burnham@noaa.gov P: 609-613-8261