Attachment 1 Statement of Work.pdf
PDF 212 KB Posted
- Solicitation number
- 82B1
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Maps.pdf | ||
| Attachment 3 Forest Slump FSSS.pdf | ||
| Attachment 4 Wage Determination.pdf | ||
| 1282B123Q0105 (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C- 1 Description of Work
The intent of this contract is to repair a fill slope slump on Forest Road 895 (West Side South Fork Road) at milepost 39.4 by shifting the road alignment and installing an underdrain system. The work includes but is not limited to roadway excavation and embankment, slump excavation and embankment, installation of an underdrain system, culvert installation, riprap placement, hauling and placing road aggregate surfacing, hydraulic turf establishment, and all other indirect items necessary to complete the project in accordance with the contract documents. The precise details of performing the work are not stipulated except as considered essential for the completion of the work. Furnish all labor, material (but for government furnished), equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Closure of forest road 895 is limited, but will be allowed pursuant section 156 of the supplemental specifications.
C- 2 Project Location
This project is located on the Flathead National Forest on National Forest System Road (NFSR) No. 895 at milepost 39.4 on the Hungry Horse Ranger District in T27N, R17W, S15 Flathead County, Montana.
The project elevation is approximately 3,700 feet. The following is the most direct route to the project:
From Hungry Horse, MT travel east on State Highway 2 approximately 0.4 miles then turn right onto State Highway 895 (West Side South Fork Road). Continue on State Highway 895 which becomes Forest Road 895 at mile post 4.4 shortly after crossing the Hungry Horse Dam. Continue south on Forest Road 895 to milepost 39.4 which is the location of the Forest Creek Slump Repair Project.
C- 3 Price Range
Between $100,000 and $250,000
C- 4 Government-Furnished Property
This project includes a Government furnished road surfacing aggregate stockpile and riprap source which is the Mazie Creek Quarry located on Forest Road 5326 milepost 1.92 in T27N, R17W, S5 Flathead County, Montana. Contractor will be required to mix and sort material in the quarry to produce the required riprap gradation.
C- 5 Standard Specifications
“Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” (FP-14, U.S. Customary Units) are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.
Copies are available electronically on the U.S. Department of Transportation Federal Highways Administration website at: https://flh.fhwa.dot.gov/resources/specs/
C- 6 Supplemental Specifications
CONSTRUCTION RFQ thru FAC 2005-66A – 2/28/2013 AG-03R6-S-13-**** *(Project Name)
See Section J for the list of Forest Service Supplemental Specifications (FSSS) that are incorporated into this solicitation and any resultant contract.
C- 7 Drawings
See Section J for the listing of Drawings that are incorporated into this solicitation and any resultant contract.
C- 8 Site Visit or Prebid Tour
No organized Site Visit or Prebid Tour is planned. Interested parties may contact Chris Steen
(406) 758-3549 at the Flathead National Forest Supervisor’s Office, 650 Wolfpack Way, Kalispell, Montana, for additional information.
C- 9 Prebid Conference
No Prebid Conference is scheduled.
C- 10 Start Work
Work is estimated to begin 1 July 2023. (see Clause F-1).
C- 11 Period of Performance
Contract shall be completed 163 Days from the Notice to Proceed (reference Clause F- 1).
C- 12 Use of Premises and Camping.
Camping will be allowed in close proximity to the project site in an area approved by the CO. Camping is restricted to the low impact (“Leave No Trace”) method in adherence with the wilderness ethic.
Furthermore, all food and refuse shall be handled according to food storage requirements of Special Order No. LC00-18 to eliminate grizzly bear/human contact (see Section J).
C- 13 Tools and Equipment
All tools and equipment shall be furnished by the Contractor.