Attachment 1 - Statement of Work.pdf

PDF 1 MB Posted

Attached to
FY22 CES MDG MEMORIAL Federal contract opportunity
Solicitation number
FA462022QA151
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to FY22 CES MDG MEMORIAL, newest first.
File Type Posted
FA462022QA151 - RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

B-52/MDG MEMORIAL REPLACEMENT

FARICHILD AFB, WA

TRIRIGA WT# 11149457

June 2022

FA462022QA151

Attachment 1 Statement of Work

Statement of Work (SOW)

For B-52 / MDG Memorial Replacement

Fairchild AFB, WA

1. DESCRIPTION OF SERVICE: The contractor shall provide all necessary tools, equipment and materials required to fabricate and install the B-52 / MDG Memorial with seating benches on each side (Photos in Appendix A).

2. SCOPE OF WORK: The Contractor shall complete all work, which includes furnishing all supervision, labor, material, equipment and services, unless otherwise specified herein, required under this contract.

All work shall be performed in accordance with all Federal, State, local laws and regulations, manufacturer’s recommendations and this Statement of Work (SOW).

1. Provide electronic renderings of requested products for final approval by the government prior to ordering and fabrication.

2. Provide government final base dimensions. Government will prepare and install concrete slab prior to memorial installation by contractor.

3. During installation phase of this requirement, care shall be taken to prevent damage to surrounding turf, hard surfaces and irrigation systems. Damage caused by the contractor shall be repaired by the contractor at no additional cost to the government.

4. Purchase, fabricate and install free standing granite memorial. (See Appendix A for concept) Approx. Dimensions: Upright – 6 ft high x 6 ft wide x 6 inch thick, Base: 14 inch deep x 7 ft wide x 6 inch thick.

- Engraving Shall Read:

o Centered Top: Let peace be our companion on a walk beside the trees

Our spirits like our banner yet are lifted on the breeze So pause with us awhile and know that you are not alone Our hearts will e’er be with you through immortalized in stone o Centered Below: Dedicated to the members of Team Fairchild who have given their lives in the service of their country o Left Align and listed: Maj Thomas E. Brigham M.D. / Capt Alan W. London Ph. D. / Anita L. Lindner / Christin Francis McCarron / Taylor McKenzie Sigman / Centered below List and spaced: Hospital Shootings June 20, o Right Align and listed: Col Robert E. Wolff / Lt Col Arthur A. “Bud” Holland / Lt Col Mark C. McGeehan / Lt Col Kenneth S. Huston / Centered below and spaced: B-52 Accident June 24, 1994

5. Granite memorial and granite seating benches shall be black or dark charcoal gray in color and shall match each other.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: The government shall furnish site access. In the event of an emergency, dial 911.

4. GENERAL INFORMATION

4.2 HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with Civil Engineering points of contact.

Attahcment 1 Statement of Work

January 1 New Year’s Day 3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 19 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas

4.2 SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations.

4.3 Period of performance shall not exceed 30 days from the date of award. Period of performance may be adjusted if led times are required for materials, but shall not exceed 30 days once materials arrive.