Attachment 1 - Statement of Work.pdf
PDF 186 KB Posted
- Attached to
- Month-to-Month Shrub Lab Office Space Rental
- Solicitation number
- 1240BG22Q0026
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation 1240BG22Q0026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards Attachment
Project Shrub Lab Short Term Rental
General Information
1.0 Scope of Work
Provide approximately 3,000 square feet (s.f.) of office/warehouse space for use by the Rocky Mountain Research Station (RMRS) Shrub Science Laboratory staff as temporary office and lab space. This would be a 1-year rental, month-to-month. Optional (not absolutely required) features that would be useful:
• Space for 4 to 6 desks/workstations, could be open or closed-door office space
• Open reception space
• Garage door into warehouse space
• Sufficient off-street parking for staff vehicles
• Located within the town limits of Cedar City, UT
• Exterior venting in place for use in areas that would be lab space
• At least one restroom
2.0 Background
The Shrub Science lab is relocating from Provo, Utah to Cedar City, Utah. To have office and lab space for the short term, (while more permanent facilities are put in place on land leased from Southern Utah University), a short- term rental of office/warehouse space is needed.
Contractor Requirements
3.0 Technical Requirements / Tasks
Not Used
4.0 Government Furnished
NOT USED
5.0 Deliverables / Schedule
NOT USED
6.0 Travel
NOT USED
7.0 Contractor’s Key Personnel
NOT USED
8.0 Security Requirements
NOT USED
9.0 Data Rights
NOT USED
10.0 Section 508 – Electronic and Information Technology Standards
NOT USED
Attachment
NOT USED
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 6.0 Travel |
| 7.0 Contractor’s Key Personnel |
| 8.0 Security Requirements |
| 9.0 Data Rights |
| 10.0 Section 508 – Electronic and Information Technology Standards |
| Attachment |
File details come from the government source that posted it. Updated .