Attachment 1 - Statement of Work.pdf

PDF 186 KB Posted

Attached to
Month-to-Month Shrub Lab Office Space Rental
Solicitation number
1240BG22Q0026
Issued by

View the file

Other files

File Type Posted
Solicitation 1240BG22Q0026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards Attachment

Project Shrub Lab Short Term Rental

General Information

1.0 Scope of Work

Provide approximately 3,000 square feet (s.f.) of office/warehouse space for use by the Rocky Mountain Research Station (RMRS) Shrub Science Laboratory staff as temporary office and lab space. This would be a 1-year rental, month-to-month. Optional (not absolutely required) features that would be useful:

• Space for 4 to 6 desks/workstations, could be open or closed-door office space

• Open reception space

• Garage door into warehouse space

• Sufficient off-street parking for staff vehicles

• Located within the town limits of Cedar City, UT

• Exterior venting in place for use in areas that would be lab space

• At least one restroom

2.0 Background

The Shrub Science lab is relocating from Provo, Utah to Cedar City, Utah. To have office and lab space for the short term, (while more permanent facilities are put in place on land leased from Southern Utah University), a short- term rental of office/warehouse space is needed.

Contractor Requirements

3.0 Technical Requirements / Tasks

Not Used

4.0 Government Furnished

NOT USED

5.0 Deliverables / Schedule

NOT USED

6.0 Travel

NOT USED

7.0 Contractor’s Key Personnel

NOT USED

8.0 Security Requirements

NOT USED

9.0 Data Rights

NOT USED

10.0 Section 508 – Electronic and Information Technology Standards

NOT USED

Attachment

NOT USED

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment

File details come from the government source that posted it. Updated .