Attachment_1_-_Statement_of_Work.pdf

PDF 65 KB Posted

Attached to
NM FWS-REFUGES GAOA - BOSQUE DEL APACHE
Solicitation number
DOIFFBO220055
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOSQUE DEL APACHE NATIONAL WILDLIFE REFUGE – SURVEY

Statement of Work - Request for Quote

1. BOSQUE DEL APACHE NWR VISITOR CENTER, HEADQUARTERS &

MAINTENANCE YARD SITE

A. Description: Site survey for buildings, access roads, parking lots, and recreation facilities design, and other data, near San Antonio, NM, south of Socorro, NM. Site is approximately 150 acres, and includes existing roads, buildings, utilities and facilities.

See attached image of the building site outlined in blue.

Previous survey results are available for reference and surveyor's use, and are attached in pdf format. These surveys are not current and not all items may be accurate but are intended to guide surveyors to existing utilities and facilities.

B. Services Required:

I. Perform topographic survey of tract as shown on attached image, using total station, GPS equipment, aerial survey, or other methods, with frequency of shots or data at least every 200 feet on a grid, with additional shots as needed to locate break lines, changes in elevation, and other features of interest including but not limited to utility lines (above and below ground – including water, sewer, electric power, telephone, data and others found), buildings, structures, trees, areas of vegetation, rock outcroppings, water bodies, pavement edges, and existing survey markers.

II. Data gathered shall be sufficient for preparation of an AutoCAD (2019) drawing at 1 foot contours.

III. Elevations shall be consistent with known sea level elevations. Site is subject to flooding through arroyos from the west. No FEMA Flood Insurance Rate Maps have been found. Survey shall be complete enough for Civil Engineers to assess flooding vulnerabilities and design mitigation measures.

IV. Trees over 30 feet in height shall be shown either individually or in groups with approximate density indicated.

V. Set 4 permanent survey markers with elevations and coordinates, separated by suitable distances to establish baselines for future construction.

VI. Survey shall be prepared by a New Mexico licensed surveyor.

C. Deliverables:

I. AutoCAD drawing file showing contour lines, utilities, roads, structures, trees, survey markers, and other items described in Section B.

II. Electronic data file.

III. D-Size AutoCAD drawing stamped by a New Mexico licensed surveyor.

IV. 4 Permanent survey markers.

General Information

USFWS Engineering Contact: Jeff Johns, USFWS Division of Engineering, 500 Gold SW, Albuquerque, NM 87102 505-248-7955.

Refuge Contacts: Deborah Williams, Refuge Manager, 575-835-1828; cell 575-418-7842, email Deborah_williams@fws.gov

Performance time: 21 Calendar days.

File details come from the government source that posted it. Updated .