Attachment 1 - Statement of Work.pdf
PDF 152 KB Posted
- Attached to
- Termite Treatment B3640 JBSA Ft Sam
- Solicitation number
- FA301622U0039
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2 Request for Quote.pdf | ||
| Q and A 11-14.pdf | ||
| Q and A 7-10.pdf | ||
| Q and A 4-6.pdf | ||
| Amendment 1 - Statemement of Work 17 February 2022.pdf | ||
| Amendment 1 Request for Quote.pdf | ||
| Q and A 2.pdf | ||
| Attachment 3 - Q and A Sheet.docx | DOCX document | |
| Q and A 3.pdf | ||
| Q and A 1.pdf | ||
| Request for Quote.pdf | ||
| Attachment 2 - WD 2015-5253 Rev 16.pdf | ||
| Attachment 3 - Q and A Sheet.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
TERMITE ISSUE
WORK TASK 5772364
BLDG. 3640 FSH OKUBO BARRACKS
JBSA FORT SAM HOUSTON
1. PROJECT INFORMATION: Applicable provisions of the contract clauses will govern work under each section of the specifications.
2. PROJECT SCOPE: The contractor shall provide subterranean termite treatment, prevention, and control to FSH Bldg. 3640 in accordance to CORPS of Engineers Termite Control Specifications 02280 publications. The publication can be downloaded at https://safe.menlosecurity.com/doc/docview/viewer/docN658BA887E78445d303013f210e1881c 5db0ba9c9c3465349b9983f48d54afe9966fc887590dd
The facility is approximately 31,000 sq. ft.
3. PROJECT DESCRIPTION: The requirements for this project are but not limited to the following: This building will be occupied by the government while the work required by this contract is being performed. The contractor shall provide barriers and signs to prevent unauthorized personnel from entering the work area. Contractor will have an assign military escort at all times when performing work inside the facility. Contractor will perform termite treatment, prevention and control to building 3640. All chemicals used and treatment shall meet all environmental and safety standards in order for occupants to remain in place during work.
4. GENERAL: The facilities will be released to the contractor by contracting with an assign escort from the facility to ensure all dorm residence personal property remains secure.
5. PESTICIDE USAGE: Contractor shall use only pest control personnel licensed by State of Texas Department of Agriculture for the application of pesticides for subterranean termite’s protection and/or control. Proof of license shall be submitted with quote.
Contractor shall perform all scopes of work specified on the label of the approved pesticide product. Any modification or change to the scope of work that result in less than total protection of the entire structure shall require coordination with and approval by the IPMC (Installation Pest Management Coordinator)
a. Contractor shall prepare the soil/substrate prior to the application of the termiticides to comply with the pesticide label instructions and recommendations.
b. Applicator personnel shall use only those termiticides specified within the contract.
c. All products used shall bear a complete label or the applicator will have a complete label available on-site should the pesticide container only possess an abbreviated label.
d. All product labels shall be readable and bear an EPA Registration Number.
6. PESTICIDES: The Contractor shall use only non-repellent termiticides formulations using water as a diluent. Emulsifiable concentrates using fuel oil as diluents are prohibited. The final concentration and soil treatments shall be in accordance with label directions and applied in such a method to not cause injury to adjacent vegetation.
a. APPROVED PESTICIDES.
Termidor (Fipronil), EPA Registration Number 432-900. Product substitutions must be requested, in writing, through the 502 CE Project Manager for approval by the IPMC (Installation Pest Management Coordinator)
b. A sample product label and Safety Data Sheet (SDS) of any termiticides used shall be provided to the 502 CE Project Manager for submission to the IPMC not less than 30 days prior to the treatment date.
7. JOB-SITE REQUIREMENTS.
a. NOTIFICATIONS: The Contracting Officer and the Supervisor, Fort Sam Houston’s Pest Control Shop shall be notified at least 7 days in advance of the application of the termite treatment to provide the IPMC adequate notification to conduct on-site monitoring for the application.
b. QUALITY ASSURANCE (QA): Contractor personnel shall not apply any pesticides unless a DOD inspector holding a valid DOD Certification of Competency for Pesticide Application is present on-site.
c. PESTICIDE REQUIREMENTS: Termiticides shall be delivered to the job site in sealed, unopened, original containers bearing an original, readable label possessing the application directions, precautions, warnings, and disposal instructions.
i. Product labels shall bear an Environmental Protection Agency (EPA) Registration Number.
ii. Soil treatment agents shall be applied in accordance with the instructions on the label and State of Texas pesticide laws.
8. SPECIAL PROVISIONS: Any deviations from these requirements must be approved, in writing by the Supervisor, FSH Pest Control Shop, through the Contracting Officer.
a. The Contractor is responsible for ensuring that the individual or agency conducting the termiticides treatments is notified when the site is prepared for the vertical barrier.
9. SOIL CONDITIONS: To ensure penetration and stability of the termiticides, applications to excessively wet soils or during inclement weather are prohibited.
a. Compliance with specific handling and application instructions stated on the manufacturer's termiticides label is required.
10. CRAWL-SPACE TREATMENTS: Soil treatments are installed shall be treated by the trench or rodding method.
a. Trench Method. Apply the termiticides in a linear trench not exceeding six inches in width along the interior and exterior of the foundation walls, along piers and plumbing at rates specified on the label. . Emulsion shall be mixed with the soil as it is being replaced into the trench. Cover treated soil in trenches with a layer of treated soil.
b. Rodding Method. Apply the termiticides by rodding from grade to the top of the footing. Rod holes shall be spaced at one foot intervals to provide a continuous barrier at application rates indicated on the product label.
11. SPECIAL FOUNDATION CONSIDERATIONS: Hollow block foundations or voids in masonry, when present, shall be treated in accordance with the label directions of the product used to ensure that a continuous chemical barrier is maintained in the voids at application rates consistent with label recommendations.
a. Soil treatments at grade beams to voids shall be done by pouring the treatment solution directly into the hollow spaces with application rates in accordance with label directions.
b. Soil treatments at expansion joints, control joints, and areas where the slabs shall be penetrated by pipes or other construction items shall be treated by rodding with application rates in accordance with label directions. The termiticides shall be rodded around all plumbing or other structures that penetrate the slab and could provide an entry for subterranean termites.
c. Soil treatments under pre-existing slabs shall consist of the termiticides being applied at rates and concentrations indicated on the label for the product used. The termiticides shall be applied uniformly under the entire slab.
12. VERTICAL BARRIERS: A vertical barrier as prescribed by the termiticides products label shall be provided to meet the contract requirements for satisfactory compliance.
a. The vertical barrier shall be conducted after final grading has been completed.
b. The vertical barrier shall be accomplished by the Trench Method to ensure a consistent, continuous barrier is obtained around the entire perimeter of the structure.
SITE REQUIREMENTS: When present, shall be so constructed to permit pesticide applicators sufficient access should future treatments become necessary.
c. All unused pesticides, empty pesticide containers and other related materials shall be removed from the installation for disposal in accordance with State of Texas, Local, EPA, and DOD requirements at the end of each day. No overnight storage of pesticides allowed on the installation.
d. The Contractor shall ensure that all wood construction materials and wood containing products (forms, scrap lumber, etc.) which could decrease the effectiveness of the treatment or contribute to a subterranean termite infestation are removed from around the foundation, foundation piers, and the crawl space.
13. WARNING SIGNS AND SAFETY NOTIFICATIONS: The Applicator shall post warning signs in treatment area to warn non-application workers a chemical poison has been used to protect the structure. Warning signs shall contain the termiticides product data (to include pesticide ingredient) and application concentration. Copies of SDS and pesticide label information will be provided to the 502 CE Project Manager
a. The Applicator shall remove the warning signs when the treatment areas are covered or sealed by subsequent construction.
b. The Applicator shall affix a termite treatment notification sign to the completed structure, in the location specified by State of Texas Department of Agriculture Laws pursuant to pesticide applications for pre- or post-construction termite treatments.
c. Re-entry times, i.e. when unprotected personnel can safely return and work in the area without the use of protective clothing, shall be determined by the personnel responsible for the pesticide application.
d. The Contractor shall notify non-applicator personnel working in a potentially hazardous environment and/or providing these personnel with protective clothing to work in the treatment area when exposed to the treated soil, i.e. termiticides.
14. HAZARDOUS AND/OR TOXIC MATERIALS: A hazardous material (HAZMAT) is one that poses a risk to the health and safety of the public, and/or the environment if not properly controlled during the handling, storage, manufacture, processing, packaging, use, disposal, or transportation. Hazardous materials may be elements or compounds, and can be found as gases, solids, liquids, or a hazardous material (HAZMAT) is one that poses a risk to the health and safety of the public, and/or the environment. Hazardous chemical are defined under Sec.
1910.1200(c) of Title 29 of the Code of Federal Regulation Contractor shall identify and report HAZMAT usage to the HAZMAT Pharmacy according to local procedures. All HAZMAT brought to the job site shall require the contractor to fill out an AF Form 3952 for each item for submission to the Hazardous Material Pharmacy. Additionally the contractor is required to submit Material Safety Data Sheets (MSDS) as directed by the clause entitled Hazardous Material Identification and Material Safety Data (FAR 52.223-3). The Contractor shall submit a monthly actual usage report of all hazardous/toxic materials brought onto the base during the preceding month to the HAZMAT Pharmacy (IAW AFI 32-7086, Hazardous Material Management). The phone for the Lackland AFB Hazardous Material Pharmacy is 671-
5389/0332 for more information. A completed DD Form 1532 will be provided after pesticide application is completed to the Supervisor, Fort Sam Houston Pest Management Shop.
15. INSPECTION AND ACCEPTANCE: A representative from 502 CES will conduct daily inspections of work progress. A final inspection of completed work will be conducted by the project manager, contractor and designated 502 CES personnel. All discrepancies identified during inspections shall be corrected prior to final payment.
16. WARRANTIES:
The contractor shall guarantee standard manufacture warranties all materials and workmanship for a period of one year from the date of project completion and shall within that period correct all defects in materials/workmanship within twenty four (24) hours of being notified. Correction of all defects under this standard warranty shall be at the expense of the contractor.
17. GOVERNMENT FURNISHED SERVICES: The government will provide utilities (water and electricity) and emergency, fire and security police response.
a. Police Protection: The 502d Security Forces Squadron shall provide security and law enforcement response and services to the contractor.
b. Fire Protection: The Fort Sam Houston Fire Departments shall provide initial response, EMS, and fire protection services to the Contractor.
18. TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations, and are subject to random vehicle speed control checks. Contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on military installations in San Antonio, TX.
19. SITE CONDITIONS: The Contractor shall furnish and maintain adequate barricades, and warning signs, on the job site. The contractor shall clean up debris on a daily basis.
20. CONTRACTOR: Contractor shall use only pest control personnel licensed by State of Texas Department of Agriculture for the application of pesticides for subterranean termite’s protection and/or control. Proof of license is required. No contractor owned pesticides will be stored for any length of time on DOD property. Contractor shall bring pesticides needed for the job daily and remove any leftover daily from the DOD installation.
21. CODES AND REGULATIONS: All work shall be accomplished in accordance with the applicable Uniform Building Codes State of Texas/Department of Agriculture laws, and OSHA Requirements.
22. HOURS OF WORK: Normal duty hours are from 7:00 AM to 5:00 PM, Monday thru Friday, except on government holidays. Contractor should coordinate work with 502d CEO/CES Project Manager, Mr. Gabriel Talamantes @ 210-671-3880 or Mr. Victor Reyna @ 210-671-
23. PERFORMANCE TIME: All services detailed herein shall be complete within thirty
(30) calendar days from date of award.
24. CLEAN-UP: Contractor will collect old materials and debris and dispose of in a contractor’s dumpster. All contractor generated refuse and waste shall be hauled off and disposed of at an off base landfill site by the contractor at no expense to the government.
25. DAMAGES: The contractor shall take precautions to prevent damage to government property. The contractor shall repair and or replace damaged items resulting from contractor performance at no additional cost to the government.
File details come from the government source that posted it. Updated .