Attachment 1 Statement of Work.pdf
PDF 262 KB Posted
- Attached to
- Shawnee National Forest: Vault Toilet Pumping
- Solicitation number
- 12444522Q0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 Wage Determination Gallatin_Hardin.txt | TXT text file | |
| Attachment 3 Experience Questionaire.pdf | ||
| Attachment 5a Wage Determination Pope_Saline.txt | TXT text file | |
| Attachment 2 Schedule of Items.pdf | ||
| Attachment 4 Toilet_Locations_Shawnee_2022.pdf | ||
| 12444522Q0009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Shawnee National Forest
Toilet Vault Pumping
SCOPE
Contractor shall furnish, on a call when needed basis, all equipment, material, labor, transportation, operating supplies, incidentals and supervision necessary to perform toilet pumping services or trash removal from toilet vault as outlined in project work.
PROJECT WORK
1. Pumping of Toilet Vaults The contractor will pump, cleanup and dispose of all waste products removed from the toilet vaults in accordance with the contract specifications and in accordance with State and Federal regulations. Vaults hold up to approx. 1,000 gallons.
2. Trash Removal from Toilet Vault When requested by the COR, the contractor will remove and dispose of all trash from the vaults after the vault has been pumped. All trash removed from the vaults
3. Charge Toilet Vaults with 80 gallons of water When requested by the COR, the contractor will charge/fill toilet vaults that have been pumped with approximately 80 gallons of water.
LOCATION
The project areas are located within the Hidden Springs Ranger District, Shawnee National Forest. There are 11 vault toilets located at Garden of the Gods Recreation area; 6 vault toilets at Pounds Hollow Recreation area; 1 vault toilet at Jackson Falls, 1 vault toilet at Tower Rock Campground, 2 vault toilets at Camp Cadiz, 2 vault toilets at Iron Furnace, 1 vault toilet at Bell Smith Springs, 1 vault toilet at Millstone Bluff, 1 vault toilet at Lusk Creek Trail Head, 1 vault toilet at Indian Kitchen Trail Head and 1 vault toilet at Rim-Rock Picnic Area
SERVICES/SCHEDULING OF WORK
The Forest Service will notify the contractor of the required servicing. This initial notification may be by phone. The contractor must complete the required servicing within 72 hours (not including Saturday and Sunday) after the initial notification. Generally, servicing shall be between the hours of 8 am and 4 pm. Occasional emergency pumping may be required, and may be outside the general servicing hours. Response time for any emergency will be by mutual agreement between both parties.