Attachment 1 - Statement of Work.pdf

PDF 243 KB Posted

Attached to
Extension of warranty and support contact for our existing VIAVI TM500 and RDA for a year.
Solicitation number
NB670000-20-01516
Issued by

View the file

Other files

File Type Posted
Sources Sought.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

Statement of Work: LTE Traffic Generator Maintenance 1 Version 1.0 (2019) Double-click on for further assistance.

Use this document to detail the Statement of Work for services.

TITLE: LTE Traffic Generator Maintenance Requesting Lab/Division/Group: Communication Technology Laboratory, Antenna Metrology, Shared Spectrum Metrolgoy Group

General Statement of Need Purchase another year of warranty and support for SSM group LTE Traffic Generator

Background The Communications Technology Laboratory conducts research related to spectrum. This research spans a broad area covering topics associated with distributed spectrum sensing, signal propagation, interference between devices, and evaluating a device’s ability to share spectrum. As each of these topics are explored, their applications to Long-Term Evolution (LTE) system is examined. The LTE User Equipment (UEs) emulator (TM500) and traffic generator (RDA) owned by Shared Spectrum Metrology (SSM) Group is at the center of this research.

Objective(s) With expiration of VIAVI TM500 and RDA, we seek to purchase another year of warranty and support

Scope/General Requirements The objective of this acquisition is to extend the warranty and support contact for our existing VIAVI TM500 and RDA for a year

Tasks/Specific Requirements

The Contractor shall provide the software licenses and warranty services listed in the following table.

Task Number or Reference

Description Format Quantity Due Date

SA200 Renewal TM500 Support Support 1 Jun 15 / 2020 SA084 Renewal RDA Support Support 1 Jun 15 / 2020

Performance Requirement Summary (for Performance Work Statement)

The licenses for the software shall be perpetual.

Desired Output Required Service Performance Monitoring Method

Statement of Work: LTE Traffic Generator Maintenance 2

Standard

SA200 TM500

SUPPORT SA200, S/N

3003723.

Warranty / Support contract

Onsite or Remote access

Shared Spectrum Methrolgoy group

SA084 RDA

SUPPORT

S/N 30051602E

Warranty / Support contract

Onsite or Remote access

Shared Spectrum Methrolgoy group

Task 1 - Title Hardware Warranty

Task 2 - Title Technical Support

Task 3 - Title Software Update

Delivery Deliverable Schedule

Deliverable Description Quantity/Media Date Required

SA200 TM500 SUPPORT

SA200, S/N 3003723.

SA084 RDA SUPPORT

S/N 30051602E

One (1) warranty/support contract

30 days after award of this requirement.

30 days after award of this requirement.

[Enter details here.]

Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI) [Enter details here.]

Security NIST is a restricted campus. An identification badge is required for access for entry into buildings and also is shown to the armed Security Police when entering the campus.

Travel Contractor employees that come on-site to install must be U.S. citizens and comply with NIST

Statement of Work: LTE Traffic Generator Maintenance 3 identification and access requirements. The Contractor employee is responsible for absences due to expired identification and access documents. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office. The badge must show the full name, title, and if required by NIST, the words “Contractor” in front. The Contractor employee shall turn in the NIST identification badge and vehicle pass to the TPOC, COR, or Contracting Officer (CO) upon termination of their services under this contract.

Special Material Requirements The Contractor shall provide, at a minimum, a one-year warranty on associated components. The warranty shall cover all parts, labor and travel (if required). The warranty shall commence upon successful completion of delivery, installation, deployment and demonstration of all required specifications

Other Unique Requirements [Enter details here.]

Place of Performance The licenses will be delivered to the NIST facility in Boulder, CO.

Period of Performance The period of performance shall be thirty (30) days from award of this requirement.

Provide suggestions to improve this form by clicking here.

https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx

Use this document to detail the Statement of Work for services.
TITLE: LTE Traffic Generator Maintenance
Requesting Lab/Division/Group: Communication Technology Laboratory, Antenna Metrology, Shared Spectrum Metrolgoy Group
General Statement of Need
Background
Objective(s)
Scope/General Requirements
Tasks/Specific Requirements
Performance Requirement Summary (for Performance Work Statement)
Task 1 - Title
Task 2 - Title
Task 3 - Title
Delivery
Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI)
Security
Travel
Special Material Requirements
Other Unique Requirements
Place of Performance
Period of Performance
Provide suggestions to improve this form by clicking here.

File details come from the government source that posted it. Updated .