Attachment 1 - Statement of Work.pdf
PDF 243 KB Posted
- Attached to
- Extension of warranty and support contact for our existing VIAVI TM500 and RDA for a year.
- Solicitation number
- NB670000-20-01516
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
Statement of Work: LTE Traffic Generator Maintenance 1 Version 1.0 (2019) Double-click on for further assistance.
Use this document to detail the Statement of Work for services.
TITLE: LTE Traffic Generator Maintenance Requesting Lab/Division/Group: Communication Technology Laboratory, Antenna Metrology, Shared Spectrum Metrolgoy Group
General Statement of Need Purchase another year of warranty and support for SSM group LTE Traffic Generator
Background The Communications Technology Laboratory conducts research related to spectrum. This research spans a broad area covering topics associated with distributed spectrum sensing, signal propagation, interference between devices, and evaluating a device’s ability to share spectrum. As each of these topics are explored, their applications to Long-Term Evolution (LTE) system is examined. The LTE User Equipment (UEs) emulator (TM500) and traffic generator (RDA) owned by Shared Spectrum Metrology (SSM) Group is at the center of this research.
Objective(s) With expiration of VIAVI TM500 and RDA, we seek to purchase another year of warranty and support
Scope/General Requirements The objective of this acquisition is to extend the warranty and support contact for our existing VIAVI TM500 and RDA for a year
Tasks/Specific Requirements
The Contractor shall provide the software licenses and warranty services listed in the following table.
Task Number or Reference
Description Format Quantity Due Date
SA200 Renewal TM500 Support Support 1 Jun 15 / 2020 SA084 Renewal RDA Support Support 1 Jun 15 / 2020
Performance Requirement Summary (for Performance Work Statement)
The licenses for the software shall be perpetual.
Desired Output Required Service Performance Monitoring Method
Statement of Work: LTE Traffic Generator Maintenance 2
Standard
SA200 TM500
SUPPORT SA200, S/N
3003723.
Warranty / Support contract
Onsite or Remote access
Shared Spectrum Methrolgoy group
SA084 RDA
SUPPORT
S/N 30051602E
Warranty / Support contract
Onsite or Remote access
Shared Spectrum Methrolgoy group
Task 1 - Title Hardware Warranty
Task 2 - Title Technical Support
Task 3 - Title Software Update
Delivery Deliverable Schedule
Deliverable Description Quantity/Media Date Required
SA200 TM500 SUPPORT
SA200, S/N 3003723.
SA084 RDA SUPPORT
S/N 30051602E
One (1) warranty/support contract
30 days after award of this requirement.
30 days after award of this requirement.
[Enter details here.]
Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI) [Enter details here.]
Security NIST is a restricted campus. An identification badge is required for access for entry into buildings and also is shown to the armed Security Police when entering the campus.
Travel Contractor employees that come on-site to install must be U.S. citizens and comply with NIST
Statement of Work: LTE Traffic Generator Maintenance 3 identification and access requirements. The Contractor employee is responsible for absences due to expired identification and access documents. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office. The badge must show the full name, title, and if required by NIST, the words “Contractor” in front. The Contractor employee shall turn in the NIST identification badge and vehicle pass to the TPOC, COR, or Contracting Officer (CO) upon termination of their services under this contract.
Special Material Requirements The Contractor shall provide, at a minimum, a one-year warranty on associated components. The warranty shall cover all parts, labor and travel (if required). The warranty shall commence upon successful completion of delivery, installation, deployment and demonstration of all required specifications
Other Unique Requirements [Enter details here.]
Place of Performance The licenses will be delivered to the NIST facility in Boulder, CO.
Period of Performance The period of performance shall be thirty (30) days from award of this requirement.
Provide suggestions to improve this form by clicking here.
https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx
| Use this document to detail the Statement of Work for services. |
| TITLE: LTE Traffic Generator Maintenance |
| Requesting Lab/Division/Group: Communication Technology Laboratory, Antenna Metrology, Shared Spectrum Metrolgoy Group |
| General Statement of Need |
| Background |
| Objective(s) |
| Scope/General Requirements |
| Tasks/Specific Requirements |
| Performance Requirement Summary (for Performance Work Statement) |
| Task 1 - Title |
| Task 2 - Title |
| Task 3 - Title |
| Delivery |
| Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI) |
| Security |
| Travel |
| Special Material Requirements |
| Other Unique Requirements |
| Place of Performance |
| Period of Performance |
| Provide suggestions to improve this form by clicking here. |
File details come from the government source that posted it. Updated .