This is a Statement of Need for repairs to the NOAA Barrow Atmospheric Observatory facility in Utqiaġvik, Alaska. The requesting organization is NOAA's Barrow Atmospheric Observatory (BRW), with David Marshall as the point of contact. The project, dated June 1, 2026, addresses two separate water damage and contamination issues affecting the facility's bathroom and building subfloor.
Repair 1 involves removing and replacing warped and delaminated ⅜-inch underlayment plywood and laminated static-resistant vinyl floor sheeting damaged by previous sewage flooding from a toilet. The contractor must demolish these materials, assess the extent of damage, sanitize and mitigate mold/mildew, replace all materials with new equivalents, and dispose of construction debris in accordance with local Utqiaġvik waste management regulations. Repair 2 addresses contamination from a cracked floor drain pipe that caused additional sewage flooding. This repair requires removal and disposal of soiled insulation, vapor barrier, and soffit materials; inspection for water damage, mold, and bacterial contamination; confirmation that the water fitting leak is fully resolved; decontamination of all soiled surfaces; replacement of all removed materials with new equivalents; and proper debris disposal. The contractor must provide all labor, materials, tools, and equipment necessary to complete both repairs. The work is located at the NOAA Barrow Atmospheric Baseline Observatory in Utqiaġvik, Alaska, with a required 60-day completion period from contract award. The contractor must account for the remote site location and include all material procurement and transportation to Utqiaġvik in their bid.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 5 - Bathroom Dimensions.pdf | ||
| Attachment 4 - Wage Determination AK20260001.pdf | ||
| Sol_1333MJ26Q0077.pdf | ||
| Attachment 2 - Photos.pdf | ||
| Attachment 3 - GML Banned Materials List - Sept 2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need: Barrow Atmospheric Observatory Bathroom Flooring and Building Subfloor Repairs
Project Information Details
Project Title BRW Bathroom Floor and Subfloor Repairs
Date Jun 1, 2026
Requesting Organization NOAA Barrow Atmospheric Observatory (BRW)
Point of Contact David Marshall - NOAA Federal
Introduction & Background
The National Oceanic and Atmospheric Administration (NOAA) Barrow Atmospheric Observatory (BRW), located in Utqiaġvik, Alaska, is a premier Arctic research facility. The observatory supports continuous monitoring of atmospheric constituents that influence climate, the ozone layer, and air quality.
Maintaining the structural integrity of the facility's interior is essential for the safety of personnel and the preservation of sensitive scientific equipment.
Need/Problem Statement
There is a two part need for these repairs
The first repair is to the ⅜ underlayment plywood that has warped and delaminated under the a laminated static resistant vinyl floor sheeting, due to previous flooding of sewage from the toilet in the bathroom. The vinyl sheets on the floor should be replaced as well.
The second repair is to restore, decontaminate, mitigate mold from, assess, and replace (if necessary) the materials that were impacted by a separate flooding issue created by a cracked floor drain pipe from the same restroom as above. Sewage from the flooding event above further impacted the facility before the cracked drain pipe was discovered. This work includes:
Scope of Work & Requirements
The contractor shall provide all labor, materials, tools, and equipment necessary to complete the following:
Repair 1:
Demolition:
- Remove the laminated static resistant vinyl floor sheeting
- Remove ⅜ laminated subfloor
Assessment:
- Evaluate the extent of subfloor damage
Mitigation:
- Sanitize and mitigate any potential mold/mildew
Material Replacement:
- Replace all removed and disposed materials with new, like quality materials
Cleanup & Disposal:
- Ensure all construction debris is removed from the site in accordance with local Utqiaġvik waste management regulations.
Repair 2:
Demolition:
- Remove and dispose of the soiled insulation
- Remove and dispose of the vapor barrier above the soffit, below the insulation
- Remove and dispose of the soffit materials
Assessment:
- Inspect for additional water damage, mold, or bacterial contamination
- Confirm that the initial water fitting leak has been fully resolved and that no additional leaks are present
Mitigation and Decontamination:
- Mitigate any mold/mildew and decontaminate all soiled surfaces to eliminate bacteria
Material Replacement:
- Replace all removed and disposed materials with new, like quality materials
Cleanup & Disposal:
- Ensure all construction debris is removed from the site in accordance with local Utqiaġvik waste management regulations.
Logistics & Performance Period
● Location: NOAA Barrow Atmospheric Baseline Observatory in Utqiagvik, AK
● Period of Performance: Repairs are expected to be completed within 60 days of the contract award.
● Special Considerations: The contractor must account for the remote nature of the site and ensure all materials are procured and transported to Utqiaġvik as part of the bid.