STATEMENT OF WORK for SOLID WASTE REMOVAL / DEMOLITION DEBRIS
Line Item 00010:
Ozark National Scenic Riverways – Jacks Fork Alley Spring, Building 523
General Description: Placement and pickup of several 30 yard roll off dumpsters. Demolition debris from wood framed structures will be placed in the roll offs. We need to have seven 30-yard roll offs placed at the demo site before demo starts. When a roll off is full the contractor will be notified and an empty 30 yard roll off will be brought out to replace a full one, the swap out will be within 2 working days, Monday through Friday of being notified. Total number of 30-yard roll offs needed at this demo site is 14, seven before demo starts and seven more as needed.
The National Park Service may request additional or reduce the number of roll-offs needed at this location as the project progresses; based on the difficulty of estimating the waste.
Project Location: This project is located in the Jacks Fork area. Building # 523A & 523B is a single story; single building that is constructed as a Duplex (523A & 523B). The Jacks Fork area of the Ozark National Scenic Riverways is located on Highway 106 West of Eminence, MO in Shannon County. Building is off of Alley campgrounds main road and county road 106-423.
GPS coordinates are as follows, 37°08'37.0"N 91°26'41.7"W
Contractor’s Responsibilities: The Park has determined that the contractor will place seven;
30-yard roll offs at the demo site before demolition begins. Once award has been made the contractor will have 14 calendar days to set these roll off dumpsters. When a roll off is full the contractor will be notified and an empty 30 yard roll off will be brought out to replace a full one, the swap out will be within 2 working days, Monday through Friday of being notified.
Contractor will provide to the Contracting Officers Representative (COR) the paperwork that shows the land fill where the debris was taken, the tonnage, date and any related charges.
All tipping will be performed during regular business hours, 07:00 am to 3:30 pm Monday through Friday, with the exception of holidays, to include the initial setting of the pre demo roll offs and all swap outs.
Estimated Progression and Contract Completion Dates: Project start date is December 7, 2020 and project finish date is anticipated to be January 1, 2021. The contractor will have 5 working days to remove the remaining roll offs once they have been notified that they are either full or that the demo project at this location has been completed.
Line Item 00020:
Ozark National Scenic Riverways – Alley Spring, Jacks Fork, Building 305 &360
General Description: Placement and pickup of several 30 yard roll off dumpsters. Demolition debris from wood framed structures will be placed in the roll offs. We need to have six each 30-yard roll offs placed at the demo site before demo starts. When a roll off is full the contractor will be notified and an empty 30 yard roll off will be brought out to replace a full one, the swap out will be within 2 working days, Monday through Friday of being notified. Total number of 30-yard roll offs needed at this demo site is 25, six before demo starts and rest as needed.
The National Park Service may request additional or reduce the number of roll-offs needed at this location as the project progresses; based on the difficulty of estimating the waste.
Project Location: This project is located in the Alley Spring area. Building 305 is a triple story; single building that is constructed as a house. Building 360 is a single-story block building serving as a flammable storage shed. The Alley Spring area of the Ozark National Scenic Riverways is located on Highway 106 East of Eminence, MO in Shannon County. Building is off of Hwy. 106 on Co. Rd 533. GPS coordinates are as follows, 37°10'48.7"N 91°10'31.3"W. Roll offs will be asked to be placed within +/- 500 ft of these coordinates.
Contractor’s Responsibilities: The Park has determined that the contractor will place six; 30-yard roll offs at the demo site before demolition begins. When a roll off is full the contractor will be notified and an empty 30 yard roll off will be brought out to replace a full one, the swap out will be within 2 working days, Monday through Friday of being notified.
Contractor will provide to the Contracting Officers Representative (COR) the paperwork that shows the land fill where the debris was taken, the tonnage, date and any related charges.
All tipping will be performed during regular business hours, 07:00 am to 3:30 pm Monday through Friday, with the exception of holidays, to include the initial setting of the pre demo roll offs and all swap outs.
Estimated Progression and Contract Completion Dates: Project start date is January 4, 2021 and project finish date is anticipated to be February 12, 2021. The contractor will have 5 working days to remove the remaining roll offs once they have been notified that they are either full or that the demo project at this location has been completed.
Line Item 00030:
Ozark National Scenic Riverways – Alley Spring, Jack’s Fork District, Powder Mill Research Center and Residence Building # 301
General Description: Placement and pickup of several 30 yard roll off dumpsters. Demolition debris from wood framed structures will be placed in the roll offs. We need to have six each 30-yard roll offs placed at the demo site before demo starts. When a roll off is full the contractor will be notified and an empty 30 yard roll off will be brought out to replace a full one, the swap out will be within 2 working days, Monday through Friday of being notified. Total number of 30-yard roll offs needed at this demo site is 32, six before demo starts and the rest as needed.
The National Park Service may request additional or reduce the number of roll-offs needed at this location as the project progresses; based on the difficulty of estimating the waste.
Project Location: This project is in the Alley Spring, Jack’s Fork District. Building # 301 this is a two story; double building that is constructed out of concrete walls, rocks, and traditional wood framing. This building is a combination of a research center and a double story living quarters. The building location is in the Powder Mill developed area, building is off Hwy. 106 and Co. Rd 106-531, East of Eminence Mo. in Shannon County, GPS coordinates are as follows, 37°11'06.2"N 91°10'30.5"W
Contractor’s Responsibilities: The Park has determined that the contractor will place six; 30-yard roll offs at the demo site before demolition begins. When a roll off is full the contractor will be notified and an empty 30 yard roll off will be brought out to replace a full one, the swap out will be within 2 working days, Monday through Friday of being notified.
Contractor will provide to the Contracting Officers Representative (COR) the paperwork that shows the land fill where the debris was taken, the tonnage, date and any related charges.
All tipping will be performed during regular business hours, 07:00 am to 3:30 pm Monday through Friday, with the exception of holidays, to include the initial setting of the pre demo roll offs and all swap outs.
Estimated Progression and Contract Completion Dates: Project start date is February 16, 2021 and project finish date is anticipated to be March 26, 2021. The contractor will have 5 working days to remove the remaining roll offs once they have been notified that they are either full or that the demo project at this location has been completed.
Line Item 00040:
Ozark National Scenic Riverways – Alley Spring, Jacks Fork, Building 543, Shawnee Shop
General Description: Placement and pickup of several 30 yard roll off dumpsters. Demolition debris from wood framed structures will be placed in the roll offs. We need to have 15 each 30-yard roll offs placed at the demo site before demo starts. When a roll off is full the contractor will be notified and an empty 30 yard roll off will be brought out to replace a full one, the swap out will be within 2 working days, Monday through Friday of being notified. Total number of 30 yard roll offs needed at this demo site is 15, 6 before demo starts and 9 more as needed.
The National Park Service may request additional or reduce the number of roll-offs needed at this location as the project progresses; based on the difficulty of estimating the waste.
Project Location: This project is located in the Alley Spring area. Building # 543 is a single story; steel building that is constructed as a mechanics shop. The building is in the Alley Spring area of the Ozark National Scenic Riverways. It is located off Highway 106 East of Eminence, MO in Shannon County. Building is off Hwy. 106 and Co Rd 211.
GPS coordinates are as follows, 37°09'54.3"N 91°17'49.6"W
Contractor’s Responsibilities: The Park has determined that the contractor will place 6; 30-yard roll offs at the demo site before demolition begins. When a roll off is full the contractor will be notified and an empty 30 yard roll off will be brought out to replace a full one, the swap out will be within 2 working days, Monday through Friday of being notified.
Contractor will provide to the Contracting Officers Representative (COR) the paperwork that shows the land fill where the debris was taken, the tonnage, date and any related charges.
All tipping will be performed during regular business hours, 07:00 am to 3:30 pm Monday through Friday, with the exception of holidays, to include the initial setting of the pre demo roll offs and all swap outs.
Estimated Progression and Contract Completion Dates: Project start date is April 5, 2021 and project finish date is anticipated to be May 14, 2021. The contractor will have 5 working days to remove the remaining roll offs once they have been notified that they are either full or that the demo project at this location has been completed.
| Project Location: This project is located in the Jacks Fork area. Building # 523A & 523B is a single story; single building that is constructed as a Duplex (523A & 523B). The Jacks Fork area of the Ozark National Scenic Riverways is located on Highw... |
| 2 of 4 Final Version FY 21 Roll Off SOW JF Powder Mill .pdf |
| Project Location: This project is located in the Alley Spring area. Building 305 is a triple story; single building that is constructed as a house. Building 360 is a single-story block building serving as a flammable storage shed. The Alley Spring ar... |
| 3 of 4 Final Version FY 21 Roll Off SOW JF Powder Mill Research Center and Residence .pdf |
| Project Location: This project is in the Alley Spring, Jack’s Fork District. Building # 301 this is a two story; double building that is constructed out of concrete walls, rocks, and traditional wood framing. This building is a combination of a resear... |
| 4 of 4 Final Version FY 21 Roll Off SOW JF Shawnee .pdf |
| Project Location: This project is located in the Alley Spring area. Building # 543 is a single story; steel building that is constructed as a mechanics shop. The building is in the Alley Spring area of the Ozark National Scenic Riverways. It is locat... |