This is a Statement of Work (SOW) for the replacement of cold storage refrigeration systems at a USDA Agricultural Research Service (ARS) facility located in Aberdeen, Idaho.
The project involves the removal and replacement of two existing refrigeration systems serving the AGL wing cold storage room within the USDA laboratory building at 1691 S 2700 W, Aberdeen, ID 83210. Work scope includes disconnecting and recovering refrigerant from two existing rooftop condensers, demolishing and removing existing rooftop condensers, associated refrigerant piping, and interior evaporator units, and installing two complete new refrigeration systems with equivalent cooling capacity using modern low global warming potential (GWP) refrigerants such as R454 series, R32, or approved equivalents. The new systems shall include rooftop condensing units mounted on strut stands or manufacturer-approved roof curbs, interior evaporative units mounted to ceiling structures in the same locations as existing units, hard refrigerant piping routed through ceiling interstitial space in accordance with mechanical codes, condensate drainage connections (reusing existing piping where serviceable), and new electrical disconnects. The contractor must provide crane services, coordinate with the building's controls provider for monitoring system integration, perform limited roof sealing and minor repairs, provide equipment submittals for approval, deliver as-built documentation in digital and hard copy formats, and conduct minimum four hours of owner training for USDA personnel covering system operation, maintenance procedures, safety controls, and service intervals. The project schedule requires completion within 90 calendar days from notice to proceed. The Contracting Officer Representative is Tyler Williams at (208) 397-8454, and the facility contact is Roger Workman at (208) 844-0200. The contractor is responsible for all labor, materials, equipment, quality control, site protection, safety compliance, and site cleanup.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 2 - WAGE DETERMINATION.pdf | ||
| SF1442 - 1232SA26Q0769.pdf | ||
| SOLICITATION NO. 1232SA26Q0769 - TERMS AND CONDITIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1.0 CONTRACT PROJECT:
1.1 Project Number:
1.2 Project Title: AGL COLD STORAGE FERFRIGERATION SYSTEMS
2.0 PROJECT CONTACT PERSONS:
2.1 Contracting Officer:
2.2 Contracting Officer Representative:
Tyler Williams 1691 S. 2700 W.
Aberdeen, ID 83210 Phone: (208) 397-8454 Email: Tyler.Williams@usda.gov
2.3 Facility contact
Roger Workman 1691 S. 2700 W.
Aberdeen, ID 83210 Phone (208) 844-0200 Email: Roger.Workman@usda.gov
3.0 SCOPE OF SERVICES:
The Contractor shall furnish all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with federal, state, and local codes and requirements as described herein and with attached contract documents. At the completion of this project, we expect to have two completely operational refrigeration units and associated systems.
3.1 GENERAL REQUIREMENTS:
The Contractor shall be responsible for verifying site conditions, obtaining accurate measurements, and performing any act or operation which may be necessary to properly bid on the work and complete the same as depicted and specified. Failure to verify conditions and obstacles will not relieve the Contractor of the responsibility to complete work as required.
4.0 PROJECT OVERVIEW:
The 2025 USDA/ARS Energy Audit and 2020 Facility Condition report has identified the Refrigeration system for the AGL cold storage as needing replaced. This project consists of removal and replacement of two existing cold room refrigeration systems serving the AGL wing cold storage room located within the USDA laboratory building located at 1691 S 2700 W Aberdeen, Idaho 83210. Work includes demolition and removal of existing rooftop condensers, associated refrigerant piping, and interior evaporator units, and the installation of two new refrigeration systems of equivalent capacity utilizing modern low global warming potential (GWP) refrigerants.
mailto:Tyler.Williams@usda.gov mailto:Roger.Workman@usda.gov
5.0 SCOPE OF WORK:
The Contractor shall provide all labor, materials, equipment, rigging, supervision, transportation, travel and per diem required to complete the work described in this scope.
5.1 EXISTING EQUIPMENT REMOVAL:
Disconnect electrical service to two existing refrigeration condensers located on the northeast corner of the laboratory building roof. Recover and evacuate all refrigerant in accordance with EPA regulations.
Demolish and remove the existing rooftop condensers, associated refrigerant piping, and two evaporative units located in separate cold storage room inside the USDA laboratory building. All removed equipment shall be transported off-site and disposed of in accordance with applicable regulations.
5.2 NEW REFRIGERATION SYSTEM INSTALLATION:
The Contractor shall furnish and install two complete refrigeration systems consisting of rooftop condensing units, interior evaporative units, refrigerant piping, insulation, condensate drainage connections, and electrical disconnects. The systems should provide cooling capacity equivalent to the existing systems and utilize modern refrigerants such as R454 series refrigerant, R32, or approved equivalent.
5.3 CONDENSER INSTALLATION:
Two new roof-mounted condensing units shall be installed in the same general location as the existing equipment. Units shall be mounted on appropriately designed strut stands or manufacture-approved roof curbs. The Contractor shall provide crane services necessary for the removal of existing equipment and placement of the new rooftop units.
5.4 ROOF INSPECTION AND MINOR REPAIR:
During installation of the new rooftop equipment, the Contractor shall inspect the roof area surrounding the equipment mounting locations. Limited sealing and minor repair shall be performed if roof damage that could lead to leaks is discovered. Major roofing repairs are excluded from this project.
5.5 EVAPORATIVE INSTALLATION:
Two new evaporative units shall be installed within separate cold storage room located inside the USDA AGL laboratory wing building. Units shall be mounted in the same location as the existing evaporators and secured to the ceiling structure. The evaporators shall match the load classification of the existing systems and utilize the same refrigerant as the associated condensers.
5.6 REFRIGERANT PIPING:
New hard refrigerant piping shall be installed connecting each evaporator to its associated rooftop condenser. Piping shall be routed through the ceiling interstitial space and installed in accordance with applicable mechanical codes and manufacturer requirements. All refrigerant piping shall be insulated in conformance with local mechanical code.
5.7 CONDENSATE DRAINAGE:
Existing condensate piping shall be reused where serviceable and adequate. If existing piping is found to be insufficient, the Contractor shall install new condensate drain piping.
5.8 ELECTRICAL WORK:
The Contractor shall provide and install new electrical disconnects for each new refrigeration unit. This scope does not include installation of new circuit breakers or new branch circuit wiring. Existing wiring shall be reused after verification of appropriate sizing and acceptable condition.
5.9 CONTROLS COORDINATION:
The installation shall allow integration of monitoring controls into the refrigeration systems. The building’s current controls provider will perform installation and integration of the monitoring system.
The Contractor will coordinate with controls provider and pricing shall be included as part of this contract. Controls shall be utilized for monitoring purposes only and not for system operation.
5.10 SUBMITTALS AND DOCUMENTATION:
Prior to equipment procurement, the Contractor shall submit product data and technical documentation for proposed refrigerant equipment for review and approval. Submittals shall include manufacturer data sheets, equipment specifications, refrigerant type, cooling capacity, electrical requirements, equipment dimensions, and installation requirements.
5.11 PROJECT COMPLETION DOCUMENTATION:
Upon completion of the installation, the Contractor shall provide control schematics, as-built refrigerant piping diagrams, equipment installation documentation, manufacturer startup documentation, and warranty documentation for all installed equipment. Documentation shall be provided in both digital and hard copy format.
5.12 OWNER TRAINING:
Upon completion of the installation and commissioning of the refrigeration systems, the Contractor shall provide a minimum of four hours of owner training for designated USDA personnel. Training shall include system operation overview, equipment components, routine maintenance procedures, identification of safety controls and alarms, and recommended service intervals.
5.13 Contractor shall provide all labor and materials for the installation of cold storage refrigeration systems.
5.14 Start new systems and verify proper operation.
5.16 GENERAL REQUIREMENTS:
5.17 Installation: It shall be the responsibility of the Contractor to complete the work in accordance with the manufacturer’s recommendations and industry standards. Additional procedures and materials may be required other than is indicated herein. If any items specified herein conflict with applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative (COR).
5.18 Quality control: The work performed under this contract shall be subject to continuous audit by COR. Quality control is the exclusive responsibility of the Contractor.
5.19 Protection of work and property: The Contractor shall protect the work, the site, and all existing property and structures within the limit of construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contactor’s expense, to the original conditions to the satisfaction of the COR.
5.20 Safety requirements: Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, signs, guards, or take other precautions as may be required by law or local authorities for protection and security.
5.21 Materials and equipment: The materials and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment shall be the manufacturer’s latest standard design. All materials and equipment shall be handled and stored by the supplier and Contractor before, during and after shipment in a manner to prevent theft or damage of any kind. All materials and equipment furnished by Contractors shall be subject to inspection.
5.22 Cleanup: The construction site shall be always kept clean and free of debris. Upon completion of project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash and debris resulting from the project.
5.23 Final payment/Contract closeout: Project shall be completed and approved by COR and any warranty documents shall be submitted.
6.0 Project schedule:
6.1 Completed 90 calendar days from notice to proceed.