Attachment 1 Statement of Work.pdf
PDF 220 KB Posted
- Attached to
- Proposal for Renovation - Renovation - HVAC (VRV/VRF) System at 75, Gregory's Road Col 7
- Solicitation number
- PR15989443
- Issued by
-
Department of State
About this file
Statement of Work Summary
This is a Statement of Work (SOW) for Solicitation No. 19CE2026Q0010 covering Recreation Center Renovation Phase III – HVAC (Air Conditioning & Mechanical Ventilation Systems). The vendor must deliver a complete, fully functional air conditioning system serving a clubhouse with an average occupancy load of 120 persons. The vendor assumes full responsibility for verifying that the proposed system design, capacities, and configurations meet all project requirements and performance criteria, with ancillary and minor works within five percent (5%) of the total contract value included at no additional cost. All work must comply with ASHRAE Standards (62.1, 90.1), SMACNA Duct Construction Standards, International Mechanical Code (IMC), NFPA 70 (NEC), and Air Conditioning Contractors of America Manual D standards. The contractor must be an HVAC contractor with minimum five years' experience, and all installers must be certified technicians using new, unused equipment.
The HVAC system components required include a VRV/VRF inverter-driven air conditioning system with two outdoor condensing units, eight indoor units (four 48,000 BTU/hr ceiling cassettes and three 24,000 BTU/hr floor-mounted units plus one 24,000 BTU/hr concealed duct unit), mechanical ventilation with two inline centrifugal exhaust fans (50 CFM @ 100 Pa), galvanized steel ductwork to SMACNA standards, refrigerant piping in Type L hard-drawn copper with specific insulation requirements, and PVC condensate drain systems. The contractor must provide testing, adjusting and balancing (TAB) within ±10% of design per Associated Air Balance Council standards, complete commissioning with functional performance testing, and training to owner personnel. Deliverables include equipment data sheets, shop drawings, refrigerant pipe sizing calculations, static pressure and airflow calculations, control schematics, as-built drawings, O&M manuals, warranty certificates, and spare parts lists. Warranty requirements include one year workmanship warranty, five years compressor warranty, and a two-year functional warranty for the complete system from final acceptance. System acceptance is contingent upon successful commissioning, compliance with airflow and cooling performance, zero refrigerant leakage, and no abnormal vibration or noise.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 Statement of Work
Solicitation No. 19CE2026Q0010
P a g e 1 | 9
SCOPE OF WORK (SOW)
Recreation Center Renovation Phase III - HVAC (Air Conditioning &
Mechanical Ventilation Systems)
1. GENERAL REQUIREMENTS
1.1 Scope
1. Vendor shall strictly follow all details indicated in the contract drawings and all field conditions observed during the mandatory site visit and shall reconcile both to deliver a fully functional air conditioning system serving a clubhouse with an average occupancy load of 120 persons.
2. Vendor shall be solely responsible for verifying that the proposed system design, capacities, and configurations meet the project requirements and performance criteria in accordance with the specified standards.
3. Vendor shall review all design documents and specifications in detail and raise any discrepancies, omissions, or technical concerns prior to submission of the quotation.
4. In the event of award, the Vendor shall again review and confirm all design aspects prior to commencement of work and coordinate with the Contracting
Officer/Engineer for resolution of any identified issues.
5. Vendor shall bear full responsibility for achieving a complete, fully operational, and compliant HVAC system and shall make all necessary adjustments, modifications, and refinements to the design and installation to meet performance requirements.
6. Vendor shall execute all ancillary, incidental, and minor works necessary for proper system functionality, whether or not explicitly indicated, at no additional cost where such works fall within five percent (5%) of the total contract value.
7. Vendor’s obligation includes ensuring system performance, reliability, and integration, and no claim for additional compensation shall be entertained for works required to achieve a fully functional system within the defined scope.
P a g e 2 | 9
1.2 Provide all labor, supervision, materials, tools, equipment, and incidentals required for a complete, operable HVAC system, including:
• VRV/VRF air conditioning system
• Mechanical ventilation system
• Controls, power wiring coordination
• Testing, Adjusting & Balancing (TAB)
• Commissioning
Work shall be turnkey and include all items whether specifically mentioned or required for proper system operation.
2. APPLICABLE CODES AND STANDARDS
All work shall comply with latest editions of:
• ASHRAE Standards (62.1, 90.1)
• SMACNA Duct Construction Standards
• International Code Council – International Mechanical Code (IMC)
• National Fire Protection Association – NFPA 70 (NEC)
• Air Conditioning Contractors of America Manual D (duct design)
• UL listed equipment and components
3. SUBMITTALS
Contractor shall submit for approval prior to installation:
• Equipment data sheets (capacity, power, performance curves)
• Shop drawings (ducting, piping, layouts, clearances)
• Refrigerant pipe sizing calculations
• Static pressure and airflow calculations
P a g e 3 | 9
• Control schematics
• Product certificates and compliance documentation
4. VRV/VRF AIR CONDITIONING SYSTEM
4.1 System Design Requirements
• System shall be inverter-driven VRV/VRF type
• Capable of simultaneous multi-zone conditioning
• Minimum COP/EER as per ASHRAE 90.1
• Refrigerant: R410A or equivalent approved
4.2 Indoor Units
Install:
• 48,000 BTU/hr ceiling cassette units (4 Nos.)
• 24,000 BTU/hr floor-mounted units (3 Nos.)
• 24,000 BTU/hr concealed duct unit (1 No.)
Technical Requirements:
• Sound level ≤ 45 dB(A) (indoor occupied zones)
• Built-in drain pumps (where applicable)
• Washable air filters (MERV 8 minimum)
• Wireless or wall-mounted controllers
4.3 Outdoor Units
Install VRV condensing units (2 Nos.):
• Microprocessor-controlled inverter compressors
P a g e 4 | 9
• Ambient operating range: 20°F to 122°F (or better)
• Anti-corrosion coated coils
• Low-noise operation ≤ 65 dB(A)
4.4 Refrigerant Piping System
Materials:
• Type L hard-drawn copper (ASTM B280 compliant)
Installation Requirements:
• Brazed joints using nitrogen purging
• Proper oil return slopes
• Isolation supports at 6 ft spacing (max)
• Identification labels at all branches
Testing:
• Pressure test: 500 psi (dry nitrogen) for 24 hrs.
• Vacuum: ≤ 500 microns prior to charging
4.5 Insulation System
• Refrigerant piping:
o Inner: Closed-cell nitrile rubber o Outer: Glass wool wrap o External: UV-resistant polyethylene cladding
• Minimum thickness: 1 inch
• Vapor barrier required on all chilled lines
P a g e 5 | 9
4.6 Condensate Drain System
• PVC Schedule 40 piping
• Minimum slope: 1% (1/8" per ft)
• Include:
o Cleanouts o Trap seals o Air gap at discharge
• Insulation:
o 1-inch nitrile rubber (anti-condensation)
4.7 Fresh Air Integration
• Provide treated or untreated fresh air supply as indicated
• Minimum ventilation rates per ASHRAE 62.1
• Include:
o Volume control dampers o Backdraft dampers o Air balancing provisions
5. MECHANICAL VENTILATION SYSTEM
5.1 Exhaust Fans
• Inline centrifugal fans (2 Nos.)
• Capacity: 50 CFM @ 100 Pa
• Power: 120V/1Ph/60Hz
• Features:
P a g e 6 | 9 o Thermal overload protection o Backdraft damper
5.2 Ductwork System
Materials:
• Galvanized steel ducts (0.6 mm thickness)
Construction:
• As per SMACNA low-pressure standards
• Transverse joints sealed (Class A sealing)
• Leakage Class ≤ 6
Supports:
• Hangers at ≤ 8 ft intervals
• Vibration isolation where required
5.3 Flexible Ducts
• Aluminum flexible ducts (110 mm Dia)
• Max length: 3 m
• Fully stretched installation required
5.4 Air Devices
• Powder-coated aluminum louvers with bird screens
• Disc valves (adjustable airflow type)
6. ELECTRICAL & CONTROLS
P a g e 7 | 9
• Coordinate with electrical contractor for power supply
• Provide:
o Control wiring o Interlocks with lighting (toilet exhaust fans)
• All wiring shall comply with:
o NEC requirements o Conduit protection
7. TESTING, ADJUSTING & BALANCING (TAB)
Perform TAB in accordance with Associated Air Balance Council standards:
• Airflow balancing within ±10% of design
• Verify:
o Supply air volumes o Exhaust air volumes o Static pressures
Provide certified TAB report.
8. COMMISSIONING
• Functional performance testing of all systems
• Demonstrate:
o Cooling capacity o Controls operation o Fail-safe modes
• Provide training to Owner personnel
P a g e 8 | 9
9. QUALITY ASSURANCE
• Minimum 5 years experience for HVAC contractor
• Installers shall be certified technicians
• All equipment shall be new and unused
10. WARRANTY
• Minimum:
o 1 year workmanship warranty o 5 years compressor warranty
11. CLOSEOUT REQUIREMENTS
Provide:
• As-built drawings
• O&M manuals
• Warranty certificates
• Spare parts list
12. ACCEPTANCE CRITERIA
System shall be accepted only upon:
• Successful commissioning
• Compliance with airflow and cooling performance
• Zero refrigerant leakage
• No abnormal vibration/noise
P a g e 9 | 9
13. Warranty for the System and Workmanship
1. Warranty for any individual item or system shall be for two (2) years or the manufacturer’s standard warranty period, whichever is greater.
2. Vendor shall provide a written functional warranty for the complete HVAC system for a period of two (2) years from the date of final acceptance.
3. During the warranty period, the Vendor shall repair or replace, at no cost to the Embassy, any defective equipment, components, or workmanship identified.
4. The warranty shall cover all parts, labor, and associated services required to restore the system to full operational condition.
5. Vendor shall respond to warranty service requests within a reasonable timeframe and ensure prompt rectification of any issues to maintain continuous system functionality