Attachment 1- Statement of Work.pdf

PDF 204 KB Posted

Attached to
36 MUNS Sprung Building
Solicitation number
FA524025QM180
Issued by

About this file

This Statement of Work (SOW) details requirements for a 56ft x 96ft Sprung Building to be installed at Andersen Air Force Base in Guam. The project requires a highly durable, all-weather structure engineered to withstand severe weather conditions including typhoons and hurricanes with wind gusts up to 200 mph. Key specifications include a corrosion-free aluminum substructure, membrane resistance to water and UV degradation, shatterproof interior lighting, HVAC power, emergency lighting, 8 interior outlets, 2 personnel doors, 2 rolling service doors, and a 12-month on-site preventative maintenance warranty.

The SOW outlines strict security protocols for contractor personnel, including compliance with base traffic regulations, prohibited possession of weapons, proper identification requirements, and adherence to controlled/restricted area procedures. Operational parameters specify work hours from 0730 to 1630 Monday through Friday, excluding holidays. Contractors must provide a point of contact who can respond on-site within 1 hour during normal duty hours and within 2 hours during non-duty hours to address any government personnel concerns.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

36 MUNS Sprung Building

ON

ANDERSEN AFB, GUAM

Table of Contents

1. DESCRIPTION OF SERVICES

1.1 REQUIREMENTS

1.2 LIABILITY

1.3 GOVERNMENT FURNISHED SERVICES

2. GENERAL INFORMATION

2.1 HOURS OF OPERATION:

2.2 CONTRACTOR PERSONNEL

3. SECURITY

3.1 PASS AND IDENTIFICATION ITEMS

3.2 RETRIEVING IDENTIFICATION MEDIA:

3.3 TRAFFIC LAWS

3.4 WEAPONS, FIREARMS, AND AMMUNITION:

3.5 FOR OFFICIAL USE ONLY (FOUO)

3.6 REPORTING REQUIREMENTS

3.7 PHYSICAL SECURITY:

3.8 CONTROLLED/RESTRICTED AREAS

3.9 MILITARY EXERCISES

1. DESCRIPTION OF SERVICES

1.1 REQUIREMENTS:

1. One 56ftx96ft Sprung Building

2. Provide equipment and trucking for delivery and assembly.

3. Provide all labor, cleanup site and removal of all potential FOD (Foreign Object Debris).

4. Connection of power to 200A / 240Vac.

5. All-weather durability that is engineered for severe weather including typhoons, hurricanes, and wind gusts up to at least 200 mph.

6. Membrane to be resistant to water, mildew, flame retardant and contain ultra-violet inhibitors to reduce degradation by the sun’s rays.

7. Shatter proof interior lighting and HVAC power for environment/humidity control.

8. Minimum of 8 interior outlets for equipment.

9. Emergency external lighting for night operations.

10. Red LED EXIT signs to provide light during a power outage or emergency.

11. Environmental motor enclosure/sealed enclosure with nickel plated chains and corrosion resistant motor.

12. At least 2 personnel doors front and back, 2 rolling service doors at least 14ft x14ft, and 2 ventilation openings.

13. Corrosion-free aluminum substructure.

14. Insulation system allowing the structure to provide optimum energy efficiency.

15. Must fit in available area: L=100ft, W=50ft.

16. 12 months on-site preventative maintenance with parts and labor warranty provided.

1.2 LIABILITY:

The contractor shall be liable for any damages resulting from any carelessness or failure to follow proper safety, installation, engineering, or maintenance procedures and standards.

1.3 GOVERNMENT FURNISHED SERVICES:

The government will provide emergency medical transportation and treatment if required. The contractor shall reimburse the Government for the cost of these medical services at current rates.

2. GENERAL INFORMATION

2.1 HOURS OF OPERATION:

The normal hours of operation for the project are from 0730 to 1630, Monday through Friday, excluding holidays and PACAF Family days.

2.2 CONTRACTOR PERSONNEL:

The contractor shall provide point of contact (POC) for all contractual matters during all hours of operation. The POC shall respond on-site within 1 hour during normal duty hours of operation and within 2 hours during non-duty hours to discuss concerns with government personnel designated by the CO to discuss problem areas.

3. SECURITY

3.1 PASS AND IDENTIFICATION ITEMS:

The contractor shall ensure the pass and identification items required for contract performance are obtained for employees.

3.2 RETRIEVING IDENTIFICATION MEDIA:

The contractor shall return all identification media and/or visitor passes from employees who depart for any reason before the contract expires; i.e. terminated for cause, reassignment, retirement, etc.

3.3 TRAFFIC LAWS:

The contractor and its employees shall comply with base traffic regulations. Traffic regulations include, but are not limited to:

· Employees shall wear seatbelts when operating or riding in any vehicle (military, company or private owned) while on installation.

· Speed limits on Andersen AFB are 25 MPH unless otherwise posted. Be aware of reduced speed limits and exercise caution when driving in base housing and school zones.

· All vehicle operators on the installation shall not use cell phones unless the vehicle is safely parked or they are using a 100% hands free device. The wearing of any other portable headphones, earphones or other listening devices while operating a motor vehicle is prohibited.

3.4 WEAPONS, FIREARMS, AND AMMUNITION:

Employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within vehicles (military, contractor-owned, or privately owned) while on Andersen AFB.

3.5 FOR OFFICIAL USE ONLY (FOUO):

The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

3.6 REPORTING REQUIREMENTS:

Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified/unclassified defense information. Employees shall be briefed by their immediate supervisor upon initial on-base assignment.

3.7 PHYSICAL SECURITY:

The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment and materials shall be secured.

3.8 CONTROLLED/RESTRICTED AREAS:

The contractor shall implement local base procedures for entry to AF Controlled/Restricted areas where contractor personnel will work. An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by 36 MUNS security manager before restricted area badges (RAB) will be issued. Employees must have a completed and favorable NACI investigation before receiving a RAB. Interim access can be granted in accordance with AFI 31- 501, Personnel Security Program Management.

3.9 MILITARY EXERCISES:

No compensation will be claimed for any delays resulting from re-entry procedures due to exercises.

LAMBERT.PAUL.DICKI Digitally signed by

LAMBERT.PAUL.DICKISSON.III.1534024866

SSON.III.1534024866 Date: 2025.08.13 13:51:26 +10'00'

PAUL D. LAMBERT, SSgt, USAF MSEM Production Supervisor

1. DESCRIPTION OF SERVICES
1.1 REQUIREMENTS:
1.2 LIABILITY:
1.3 GOVERNMENT FURNISHED SERVICES:
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION:
2.2 CONTRACTOR PERSONNEL:
3. SECURITY
3.1 PASS AND IDENTIFICATION ITEMS:
3.2 RETRIEVING IDENTIFICATION MEDIA:
3.3 TRAFFIC LAWS:
3.4 WEAPONS, FIREARMS, AND AMMUNITION:
3.5 FOR OFFICIAL USE ONLY (FOUO):
3.6 REPORTING REQUIREMENTS:
3.7 PHYSICAL SECURITY:
3.8 CONTROLLED/RESTRICTED AREAS:
3.9 MILITARY EXERCISES: