Attachment_1-Statement_of_Work.pdf

PDF 130 KB Posted

Attached to
V119 - BARGE AND TUG SERVICES FOR REFUELING OF USS CHARLESTON
Solicitation number
N0060424Q4082
Issued by

About this file

This document is a Statement of Work (SOW) for tug and barge services required to refuel the USS CHARLESTON in San Diego, California from August 25-29, 2024.

The SOW covers the requirement for a five-day period of performance to provide tug and barge services for the refueling, which is scheduled for August 27-28, 2024. Specific requirements include the barge having three 2.5m or 3.3m diameter fenders, an 8" or 6" hose flange with 50-75 feet of hose, and the ability to refuel on August 26, 2024 to prepare for the refueling. The customer (Navy) is responsible for coordinating the refueling with the shipyard, engineering, and operations departments. The technical point of contact is CW02 Jesus Santana.

The related federal contract opportunity is a combined synopsis/solicitation under Solicitation Number N0060424Q4082 for the barge and tug rental services. The government intends to award a single firm-fixed price contract based on technically acceptable quotes that offer the best value considering price, past performance, and responsibility. Quotes are due by August 2, 2024 at 12:00 PM Hawaii Standard Time.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

TUG & BARGE SERVICES for REFUELING of USS CHARLESTON Pt. Loma – San Diego, CA

I. Brief Job Description:

GENERAL: This Statement of Work (SOW) covers the requirement associated with tug and barge services for USS CHARLESTON refueling on 27 and 28 August 2024. The period of performance date is 25 August 2024 to 29 August 2024 and is five (5) days due to tug and barge having to sail from Los Angeles to Point Loma, San Diego and back.

Refueling of barge is requested to take place on Wednesday 26 August, to prevent any delay in services for the actual refueling, which is scheduled for Thursday, 27 August 2024 and Friday, 28 August 2024. Requesting for barge to have three 2.5m or 3.3m diameter fenders, as well as an 8"or 6" hose flange with approximately 50' to 75' of hose. If the barge is unable to support the above requirements, then we can use a 4" quick disconnect hose to our bunker station with 30' to 40' hose.

II. Period of Performance: 25 August 2024 to 29 August 2024

III. Location:

USS CHARLESTON (LCS 18)

POC: LSCS GONZALEZ

Phone: 619-509-8288 Pier 4 South BAE Shipyard, 2205 Belt St, San Diego, CA 92113

IV. Customer Responsibilities:

A. Notify Environmental, Security, and Dock Master.

B. Coordinate refueling with Jankovich Company, BAE Shipyard, as well as Engineering and Operations Department.

V. Technical POC:

CW02 Jesus Santana Cell Phone: 408-799-3698 Email: jesus.santana@lcs18.navy.mil

1.01c NBPLINST 3171.1 - NBPL POLICY FOR FUELING OPERATIONS AT THE DFSP FUEL PIER 23.pdf
SMALL CRAFT AND TRUCK REFUELING (VESSELS/TRUCKS HAVING TANK CAPACITY OF LESS THAN 10,000 GALLONS)

File details come from the government source that posted it. Updated .