This document is a Solicitation for commercial products related to carpet replacement in Building 620 at Nellis Air Force Base. The Statement of Work describes the requirements for the contractor to provide all labor, materials, and equipment to remove the existing carpet and install new carpet tile in a checkerboard design in multiple offices on the 1st and 2nd floors, as well as the entryway to the basement vault area. The anticipated contract type is Firm Fixed Price. The solicitation is set aside for small businesses under NAICS code 314110. Quotes are due on July 10, 2024, and a site visit is scheduled for June 28, 2024. The government will award a single contract to the lowest-priced, technically acceptable offeror. Detailed specifications for the carpet materials, installation, and site conditions are provided in the attached documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
CARPET REPLACEMENT
BUILDING 620, USAFWC
20 March 2024
PART I GENERAL
1.1. PURPOSE
This Statement of Work (SOW) defines the scope of work to accomplish the installation of new flooring within building 620 located on Nellis AFB, NV. The contractor shall provide all labor, material, equipment, management, supervision, coordination, and transportation required to accomplish this installation as well as removal/disposal of previous flooring.
1.2. WORK SCHEDULE, PLANS, AND WORKING HOURS
Work time for this contract will be after duty hours. Evenings Monday through Friday from 0730-1700 unless specified otherwise. The USAFWC will provide an escort for facility access. The contractor shall not begin any work until all materials are onsite. Written permission from the Contracting Officer shall be obtained before making any deviation from the aforementioned schedule.
Not all rooms inside building 620 will have carpet removed/replaced. The carpet replacement project will include the multiple offices on the 1st and 2nd floor, as well as the entryway to the basement vault area. See Attachment 2 for additional details.
1.3. AVAILABILITY OF UTILITY SERVICES
All reasonable quantities of utilities will be made available to the contractor. The Government shall not be held responsible for interruptions of utility services, and will not be liable for contractor delays, damages, or increased costs incurred by any such interruption of service. The contractor shall be responsible for providing all labor, equipment, and materials to make necessary temporary utility connections. The temporary connections shall be coordinated with the Contracting Officer before being made and shall be removed upon project completion.
1.4. CLEAN-UP
All debris and rubbish not specified to become Government property resulting from the installation of new carpet shall be disposed of by the contractor off Government property. The Government will designate a location for a contractor provided dumpster, if necessary. Disposal will be compliant with all applicable Federal, State, and local hauling and disposal regulations. Site clean-up shall occur daily.
1.5. SAFETY REQUREMENTS
Safety requirement shall be the applicable sections of EM 385-1-1, Oct 1992 and Occupational Safety and Health Administration (OSHA) Regulations. OSHA regulations are available for review at the USAFWC Safety Office, Building 620, Room 203. The base Civil Engineering Office has EM 385-1-1 available for reference in building 812.
The contractor shall ensure that any lifting devices or ladders meet all applicable safety standards. The contractor shall be required to use those lifting devices that will allow for the existing modular systems furniture to be raised for the installation of the new materials requested. The contractor will not be required to disconnect any electrical system connections to or from the modular systems furniture.
1.6. SITE CONDITIONS
Site visits will be scheduled upon request. Regardless of site visit attendance, contractors acknowledge satisfaction as to the nature and location of the work, the general and local conditions, access to job site;
disposal, handling and storage of materials; availability of labor, water, electric power or similar physical conditions at Nellis AFB; the character of equipment and facilities needed preliminary to and during the performance of the work; and all other matters that can in any way affect the work or costs related to this requirement upon submission of offers. Contractors further acknowledge that any damage to the existing structure in and around facilities will be returned to existing condition prior to the completion of the subject work at no additional cost to the Government.
1.7 WARRANTY
The contractor shall provide the Government with a one-year warranty on workmanship.
The contractor shall provide any manufacturer’s warranty to the Government.
END OF SECTION
PART II – TECHNICAL
2.1 BUILDING 620, UNITED STATES AIR FORCE WARFARE CENTER
2.1.1 Removal of existing office furniture and equipment for the installation of new materials. The furniture shall be relocated within the immediate work area to allow for the installation of new materials. The contractor will be required to replace that furniture back to its original configuration prior to the end of the workday. All furniture and equipment will be placed back in its original configuration after installation of new materials. The contractor will be allowed to visit the site to determine what furnishings are to be moved. The contractor shall use applicable lifting devices to raise and lower any existing modular furniture within the work area. The contractor will not be allowed to dissemble existing modular furniture during the course of the contract.
2.1.2 Removal of existing on cove base, glued down carpet, and glued down edge molding. The contractor will carefully remove all existing cove base, taking care not to damage the wall finish or paint above the area where cove is being removed. Should the paint or wall become damaged during the removal process, the contractor will be responsible for repairing the damages, ensuring that the repairs match the existing finish and color.
2.1.3 Prepare existing floor for the installation of new glued down materials.
2.1.4 Purchase and install new carpet tile. The carpet tiles must be installed in checkerboard design.
Reference “Attachment 2 – Carpet Areas, Measurements, and Design” for additional details.
The carpet will be CushionBac Renew (product #: 131210250F). The carpet tile shall be square and of commercial grade manufactured by the following Tier I vendor. Tier I vendor contacts can be found below. Carpet tile style and color will be the following:
Interface Americas o Heartbeats Collection - Heart Strings o Color: 107381 Paramour
2.1.5 Purchase and install cushion backing. The cushion shall match the existing backing of previously installed carpet.
2.1.6 Purchase and install cove base. The color of cove base shall match the above carpet selection.
2.1.7 Purchase and install edge molding. The color of the edge molding shall match the carpet selection.
END OF SECTION
PART III – Tier I Vendor Contacts
Interface Americas
Name(s): Interface Customer Success
Phone(s): 800-634-6032
Email(s): orders@interface.com
1622164155A Highlight
1622164155A Highlight
1622164155A Highlight
1622164155A Highlight
File details come from the government source that posted it. Updated .