United States Department of the Interior
Bureau of Land Management Uncompahgre Field Office Montrose, CO 81401
Statement of Work (SOW) Vault Pumping Uncompahgre Field Office and Gunnison Gorge National Conservation Area
This Statement of Work (SOW) is split between two requestors, the BLM Uncompahgre Field Office (UFO) and Gunnison Gorge National Conservation Area (GGNCA). Service is to be provided on an as-needed basis upon request from the BLM. Illustrated below, the UFO and GGNCA are segregated into individual requirements, in Tables 1 and 2.
DESCRIPTION OF SERVICES
The Contractor shall remove outhouse waste by pumping BLM maintained vaults in the locations listed in Tables 1 and 2 The Contractor shall supply all labor, equipment and materials necessary for pumping vault toilets and leaving them in a clean and sanitary condition for public use. The Contractor must remove garbage/or trash deposited in vaults. Contractor shall pump from the rear vault access door and not through the riser. Contractor shall add 50 gal of fresh water, supplied by the contractor, to the vault after pumping. All sewage waste must be disposed of in a Colorado State approved facility and in accordance with all applicable laws. The Contractor, at their expense, shall repair damages to BLM facilities caused by the Contractor. The Contractor, at their expense, will clean up any sewage or vault trash spilled or smeared outside of the vault during the pumping operation and will properly wash the spill area. All outhouses are easily accessible and are located within fifty feet of parking areas or roadways. A key will be provided, to the contractor, that will allow access to the vault access doors.
Vaults are located within the Uncompahgre Field Office and Gunnison Gorge National Conservation Area within Montrose, Delta, Ouray, and San Miguel counties. Site maps are included that illustrate the total number of vaults per managed area: fourteen vaults are in the UFO, and fifteen vaults are in GGNCA. Vault capacities range from 500- 3,000 gallons. There is a possibility that up to five new vaults will be added. Those are highlighted in green in the table below and on the Schedule of Items.
The BLM will contact the contractor when pumping services are needed. The contractor will complete the pumping request within 10 business days of the BLM’s request.
Invoices shall be submitted based on grouping outlined in Tables 1 and 2 below. That is, all toilets pumped in Group A shall be invoiced to line item 010, all toilets in Group B shall be invoiced to line item 020, all toilets in Group C shall be invoiced to line 030, and all toilets in Group D shall be invoiced to line 040. All invoices will indicate the Invoice Group and the corresponding funding line in the contract.
Table 1: Uncompahgre Field Office (UFO) (see maps)
| Vault Facility Name |
| No. of Vault(s) |
| Location |
| Distance from Montrose miles (m) |
| Estimated Frequency of |
Service/Year
Anticipated Service Date Range (s)
| 0-1 |
| 1 |
| 2 |
Uncompahgre Riverway (Invoice Group C)
| 1 |
| Hwy 550 near Ridgway |
| 24 m |
| X |
Will Call
Ledges Cottonwood Campground
| 2 |
| Montrose County BB36 Rd, near Piñon |
| 92 m |
| X |
Will Call
Ledges Rock House Campground
| 2 |
| Montrose County BB36 Road, Near Piñon |
| 93 m |
| X |
Will Call
| Caddis Flats Recreation Site (Invoice Group D) |
| 2 |
| Hwy 145 north of Placerville |
| 51 m |
X
Will Call
| Specie Creek Recreation Site (Invoice Group D) |
| 2 |
| Hwy 145 north of Placerville |
| 52 m |
| X |
Will Call
Beaver Recreation Site (Invoice Group D)
| 1 |
| Hwy 145 north of Placerville |
| 59 m |
| X |
Will Call
Lower Beaver Campground (Invoice Group D)
| 2 |
| Hwy 145 north of Placerville |
| 60 m |
X
Will Call
Norwood Cabin (Invoice Group C)
| 2 |
| Hwy 145 north of Placerville |
| 62 m |
| X |
Will Call
Future New Vaults
North Delta OHV Area
| 2 |
| Trap Club Road |
| 26 m |
| X |
Will call
Buzzard Gulch (Invoice Group C)
| 1 |
| Spring Canyon Road |
| 7 m |
| X |
Will call
Ridgway Area Trails (Invoice Group C)
| 1 |
| County Road 10 |
| 25 m |
| X |
Will call
Rim Road Staging Area (Invoice Group C)
| 2 |
| Rim Road |
| 13 m |
| X |
Will call
| Total Vaults |
| 14 |
| Over the term of the contract, the total number of vaults could be 20 |
| Table 2: | Gunnison Gorge National Conservation Area (GGNCA) (see map) | |
| Vault Facility Name | ||
| No of Vault(s) | ||
| Location | ||
| Distance from town |
miles
| Estimated frequency of service |
| Anticipated Service Date Range |
| 0-1 |
| 1 |
| 2 |
Gunnison Forks Toilets (Invoice Group A)
| 2 |
| Pleasure Park Road off of Hwy 92 |
| 15 m (Delta) |
| X |
| Will call |
Gunnison Forks Dump Station (Invoice Group B)
| 1 |
| Pleasure Park Road off of Hwy 92 |
| 15 m (Delta) |
| X |
| Will Call |
North Sidewinder Trailhead (Invoice Group A)
| 2 |
| H-75 Rd near Austin |
| 11 m (Delta) |
| X |
Will Call
Orchard Boat Ramp (Invoice Group A)
| 1 |
| H-75 Rd near Austin |
| 13 m (Delta) |
X
Will Call
Cottonwood Grove Campground (Invoice Group A)
| 1 |
| South River Road (accessed via H-75 Rd) |
| 16 m (Delta) |
| X |
| Will Call |
West River Trailhead (Invoice Group A)
| 1 |
| South River Road (accessed via H-75 Rd) |
| 17 m (Delta) |
X
Will Call
Ute Trailhead (Invoice Group B)
| 1 |
| Ute Road (high clearance, rough) (accessed via Peach Valley Rd) |
| 19 m (Delta) |
| X |
Will Call
Duncan Trailhead (Invoice Group B)
| 1 |
| Duncan Road (high clearance) (accessed via Peach Valley Rd) |
| 21 m (Delta) |
| X |
Will Call
Chukar Trailhead (Invoice Group B)
| 1 |
| Chukar Road (last 3.5 miles is high clearance 4WD) (accessed via Peach Valley Rd) |
| 25 m (Delta) |
| X |
Will Call
Peach Valley Staging Area (Invoice Group A)
| 2 |
| Falcon Rd east of Olathe |
| 17 m (Delta) |
X
Will Call
Elephant Skin Trailhead (Invoice Group A)
| 1 |
| Elephant Skin Rd (accessed via 6530 Rd) |
| 5 m (Montrose) |
| X |
Will Call
Flat Top Trailhead (Invoice Group A)
| 1 |
| Flat Top Rd (accessed via 6530 Rd) |
| 4 m (Montrose) |
| X |
Will Call
| Total Vaults |
| 15 |
QUALITY ASSURANCE PLAN
Inspection will be done by the Government Representatives:
The Government will consider the work acceptable when the contracted services meet the standards illustrated in the “Description of Services”. If the work does not meet these requirements, the contractor will be notified to take corrective action. Payments for services will be made according to these requirements. Any additional cost, for the corrective action, will be the responsibility of the contractor.
PAYMENT OF SERVICES
The vendor will submit proper invoices, for services performed, on a monthly basis; the government will make payments for actual services performed that meet performance requirements illustrated under the “Description of Services to include tables 1 and 2. Vendor will itemize each invoice by individual Vault Facility Name.
PERIOD OF PERFORMANCE
The period of performance will be from March 2022 to March 2027.