This is a Statement of Work (SOW) for a BPA order-level task under the Nationwide Security System Maintenance, Repair and Installation Services contract for the USDA Animal and Plant Health Inspection Service (APHIS) National Centers for Animal Health facility in Ames, Iowa.

The contractor shall design, procure, and install video surveillance system enhancements at the Ames facility, with the Government providing specific equipment including thermal cameras, camera mounts, underground rated Category 6 cable, 18-foot camera poles, pole base enclosures, video transceiver and receiver devices, network power injectors, and network ports. The contractor must supply all labor, materials, tools, and equipment necessary for installation. Work includes installing approximately 600 feet of 1-1/4" PVC conduit underground along the southeast fence line and 900 feet along the east fence line, with installation of concrete pole bases, cable pulls, and three video surveillance cameras on each pole. All work must comply with NFPA codes, UL standards, OSHA requirements, and state and local building codes. The project must be completed within 120 calendar days from Notice to Proceed, with work limited to Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays. The facility is a biosecurity location containing biohazard materials, requiring contractor personnel to complete area-specific training, pass OFI Form 86C security checks, and follow all APHIS and USDA security policies and procedures. Contractor deliverables include three sets of as-built drawings, warranty information, and written certification of system completion. The Government will conduct an acceptance test within 10 days of completion request, and the contractor shall provide a one-year warranty covering all supplied equipment and materials, with 24-hour repair response time seven days a week including holidays.

View the file

Other files

File Type Posted
12639526Q0223 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BPA Order Level Statement of Work, Ames, IA Nationwide Security System Maintenance, Repair and Installation Services United States Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS) National Centers for Animal Health (NCAH)

SECTION 01 SUMMARY OF WORK

PART 1: GENERAL

1.1 DESCRIPTION

A. The intent of this specification is to provide the National Centers for Animal Health, specifically; located at 1920 Dayton Ave, Ames, Iowa 50010, with an infrastructure for adding security measures consisting of Video Surveillance modifications that will enhance the protection of the facility, assets and safety of personnel.

B. The contractor shall provide and install all equipment (except where noted), devices, system components, construction materials and all necessary appurtenances to complete this modification project.

1. The Government will provide only the following equipment:

a. Anchor bolts

b. Underground handholes

c. Video surveillance thermal cameras

d. Camera mounts

e. Underground rated category 6 cable

f. 18 ft. camera poles

g. Pole base enclosures

h. Video transceiver and receiver devices

i. Video security network and power injectors

j. Network ports for plugging in cameras

C. The contractor shall supply all labor and labor material, including tools, ladders, lifts, power equipment, etc., necessary to complete this project.

D. All work performed shall be coordinated and approved in advance by the Contracting Officer’s Representative.

E. Final placement of all Video System equipment and devices shall be coordinated and approved in advance by the Contracting Officer’s Representative.

1.2 REGULATORY REQUIREMENTS

A. The equipment (system control panels and devices specified), materials, installation, workmanship and operation shall conform to the most stringent applicable requirements of the most recent editions of the following publications and this specification unless otherwise noted:

1. National Fire Protection Association (NFPA)

a. NFPA 70 - National Electrical Code

b. NFPA 72 - National Fire Alarm Code

c. NFPA 101 - Safety to Life from Fire in Buildings and Structures

d. NFPA 1 - Uniform Fire Code

e. NFPA 5000 – Building Construction and Safety Code

2. Underwriters Laboratories, Inc. (UL)

a. Appropriate UL Standards

3. State and Local Building Codes as adopted by the Authority Having Jurisdiction (AHJ)

4. The Uniform Federal Accessibility Standards (UFAS)

5. Occupational Safety and Health Administration (OSHA)

6. Equipment Manufacturer Printed Instructions

1.3 COORDINATION

A. The contractor shall coordinate all work with the Contracting Officer's Representative.

B. The contractor shall submit an installation schedule for review and approval by the Contracting Officer's Representative within ten (10) days of task order award.

C. The contractor shall be solely responsible for coordinating work with all subcontractors and ensuring that all items of joint use in conjunction with installations are completed.

1.4 INTENT OF CONTRACT DRAWINGS

A. Government provided drawings, henceforth referred to as “Contract Drawings”, do not attempt to show complete details of building construction that may affect installation. Government provided diagrams of proposed systems are for reference only and do not necessarily show physical arrangement of all equipment and/or maximum number of devices. Minimum system requirements are shown.

B. Devices are shown diagrammatically only. System layout does not necessarily show maximum number of system components and should not be used for obtaining quantities for linear runs of conduits and wires. The contractor shall provide all conduits and wire wherever needed to complete installation of specific equipment required and provided by the contractor.

C. Locations of existing and Government concept devices are approximate and may be distorted for clarity in representation.

1.5 ACCESS TO SITE AND TRAFFIC RESTRICTIONS

A. Access to each individual site shall be arranged by the Contracting Officer's Representative according to the schedule submitted by the contractor and approved by the Contracting Officer’s Representative. The contractor shall coordinate and schedule his/her work under this contract to cause the least interference with the normal flow of visitor and employee traffic.

B. Available Work hours shall be Monday through Friday, 08:00 a.m. to 4:30 p.m., excluding Government holidays. Requests for exceptions to this schedule shall be made in writing forty-eight (48) hours in advance and approved by the Contracting Officer's Representative.

1.6 TIME FOR COMPLETION

A. All work on this project shall be completed within 120 calendar days from Notice to Proceed. Timely completion is of the essence for this project.

1.7 SPECIAL PROVISIONS

A. The building where work will be performed is a bio-security facility and contains biohazard materials; therefore, the contractor must complete any area specific training before entry and follow bio-security procedures for entering and exiting the facility. In addition, any tools or equipment carried into the facility must be decontaminated before they can be removed from the facility.

B. The contractor shall confine all operations to within the work limits of the project and exercise special care to maintain natural surroundings undamaged. Building surfaces that have been altered for the installation of system equipment shall be refinished to match original condition by skilled personnel of the trades involved at no additional expense to the Government.

C. Finished surfaces of existing facilities that are affected, marred, scratched, or damaged by the contractor shall be refinished to match original condition.

1. Patching material shall be of the same type, style, and thickness, and shall be finished to match existing adjacent surface construction in color and texture.

2. Patching material, paint color, paint material and paint application methods shall be approved in advance by the Contracting Officer’s Representative.

D. No building structural members shall be cut or altered without prior approval of the Contracting Officer's Representative.

E. Any damage resulting from contractor's operation shall be brought to the attention of the Contracting Officer's Representative immediately.

F. The contractor shall take all necessary and reasonable measures to keep the work site clean of trash and debris. Work areas shall be cleaned immediately as work in that area is completed, and before moving to a new work site. Place all trash and debris in OSHA approved containers, remove, and dispose of trash off site daily.

G. The contractor shall move all materials and equipment, including ladders and scaffolding from the site at the completion of each day's operation unless otherwise approved by the Contracting Officer's Representative.

H. The contractor shall provide proper safety equipment to workmen and ensure a safe environment for employees and the general public at all times. The contractor shall work to ensure free, unobstructed, and safe access to and about the work area.

END OF SECTION

SECTION 02 WORK RESTRICTIONS

PART 1: GENERAL

1.1 USE OF PREMISES

A. Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the work is approved.

B. Keep driveways and entrances serving premises clear and available to the Government, employees, visitors and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

C. Limited parking may be available on the site away from each facility.

D. All contractor staff shall pass an appropriate APHIS designated background investigation before performing any work. The contractor personnel who will perform work at the USDA, NCAH facilities will be required to complete and have a favorable determination of suitability for OFI Form 86C, Special Agreement Checks (SAC) prior to starting work under this contract.

1. The contractor shall provide a list of intended employees to the Contracting Officer’s Representative within three (3) calendar days of task order award.

2. The contractor shall keep the list of employees up to date throughout the project in the event of employee separation and transfer.

1.2 ADHERENCE TO SECURITY POLICIES AND PROCEDURES

A. The Contractor shall adhere to all Site, APHIS and USDA security policies and procedures including Code of Federal Regulations Requirements, Standard Operating Procedures, Security Directives, Security Procedures, General Orders, Post Orders and any applicable Government Policies and Procedures.

1. Failure to adhere to or violation of any above listed requirements, procedures, directives, orders and/or policies may result in criminal prosecution or contractor representative or contractor employee (violator) removal.

1.3 PROJECT ADVERTISEMENT RESTRICTION

A. The contractor shall not advertise in any media, including newsprint, radio, television, company promotional material and/or the World Wide Web (internet web site) any site or system specific information with regard to this project. The following details shall not be made public information:

1. Site name

2. Site address

3. Site mission or assets

4. Security package equipment or component manufacturers

B. The contractor may advertise the following information with regard to this project for company promotional use:

1. Name of Agency; Animal and Plant Health Inspection Service

2. Agency Mission Statement;

a. "Protecting American Agriculture" is the basic charge of the U.S. Department of Agriculture's (USDA) Animal and Plant Health Inspection Service (APHIS). APHIS provides leadership in ensuring the health and care of animals and plants. The agency improves agricultural productivity and competitiveness and contributes to the national economy and the public health.

3. Site city location; Ames, Iowa

4. General security package sub-system information; Access Control, Intrusion Detection and Video Systems.

5. General project cost and construction time period.

SECTION 03 MATERIALS AND EQUIPMENT

PART 1: GENERAL

1.1 DESCRIPTION

A. The work of this section consists of the general procedures for handling, storing, and protecting material and equipment.

B. The work of this section consists of the requirements and specifications of all Physical Security Package equipment and products.

1.2 TRANSPORTATION AND HANDLING

A. Arrange deliveries of materials in accordance with intended construction schedules; coordinate to avoid conflict with work and conditions at the site. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible. The contractor is encouraged to obtain materials in biodegradable or recyclable/reusable packaging which uses the minimum amount of packaging possible.

1.3 STORAGE AND PROTECTION

The contractor shall:

A. Properly store, protect, and carefully handle equipment and materials to prevent damage before and during installation. Equipment and materials shall be handled, stored, and protected in accordance with the manufacturer's recommendations and/or instructions. The Contracting Officer’s Representative will identify a room for storage of equipment and tools during installation. In addition:

1. EMT, conduit, wire mold and associated hardware shall be stored to provide protection from the weather and accidental damage.

2. Cable and wire shall be sealed, stored, and handled carefully to avoid damage to the outer covering or insulation, and damage from moisture and weather. Damaged or defective items shall be replaced with new items at no cost to the Government.

D.The contractor shall protect equipment on site; safeguarding of equipment shall be the sole responsibility of the contractor. The Government shall assume no responsibility for loss or damage occurring prior to completion of contract and acceptance of the respective systems.
PART 2:PRODUCTS

2.1 MATERIALS AND EQUIPMENT

A. Materials and equipment provided by the contractor under this contract shall be the standard product and current design of a manufacturer regularly engaged in the production of such equipment. The material and equipment shall be listed by the Underwriters Laboratories, Inc. (UL) or approved by the Factory Mutual (FM) if such standards exist for the equipment and materials specified. The UL authorized listing mark is acceptable as evidence that the material meets this requirement.

B. All materials and equipment provided by the contractor under this contract shall be commercial “off the shelf” products with an open distribution network.

C. Materials and equipment shall be used only for their intended use.

D. All contractor supplied equipment, components and materials shall be new and the manufacturer’s latest revision.

SECTION 04 EQUIPMENT INSTALLATION

PART 1: GENERAL

1.1 DESCRIPTION

A. The contractor shall install material/equipment to include all, conduits, grounding and associated hardware and required devices as set forth within these specifications in the following locations:

Southeast fence line

· Install approximately 600 feet of 1-1/4” size pvc conduit underground from exterior of Building C8 to concrete pole base.

· Place underground quazite pull boxes as needed.

· Install concrete pole base with anchor bolts, conduit and grounding equipment. Top of pole base will extend approximately 36” from ground surface.

· Pull provided underground rated category 6 wire from the Building C8 mechanical building support room to the mounted enclosure on the concrete pole base.

· Transition all underground pvc pipe to rigid metallic conduit where exposed above ground

· Program and install provided video surveillance cameras (3) on the pole.

East fence line

· Install approximately 900 feet of 1-1/4” size pvc conduit underground from exterior of Building C8 to concrete pole base.

· Place underground quazite pull box and additional boxes as needed.

· Install concrete pole base with anchor bolts, conduit and grounding equipment. Top of pole base will extend approximately 36” from ground surface.

· Pull provided underground rated category 6 wire from the Building C8 mechanical building support room to the mounted enclosure on the concrete pole base.

· Transition all underground pvc pipe to rigid metallic conduit where exposed above ground

· Program and install provided video surveillance cameras (3) on the pole.

Coordinate with the NCAH security section for exact locations and any other details needed.

PART 2: EXECUTION

2.1 EQUIPMENT INSTALLATION

A. The contractor shall perform work in accordance with the requirements of the National Fire Protection Association, National Electrical Code and the equipment manufacturer.

B. The contractor shall install system components and system wiring in accordance with the manufacturer's instructions. Manufacturer installation recommendations or instructions shall be considered as MANDATORY methods of installation for the purpose of this contract, unless the Government's specifications are more stringent, in which case the Government's specifications shall be adhered to.

C. The contractor shall label all cabinets, control panels, system component enclosures, splice cans and power supply cans on the inside of each respective enclosure with a commercial grade labeling device.

1. Each respective enclosure label will identify accurately as to use of the enclosure and location of field devices, i.e., controlled doors, area(s) of protection, power distribution, system type, etc.

2. Handwritten labels, or handwritten notes, inside any enclosure WILL NOT be accepted.

3. Labels shall be placed on the inside of each respective enclosure. Labels shall not be placed on the outside of any enclosure.

4. The labeling material, method, adhesion and information shall be approved in advance by the Contracting Officer’s Representative.

D. Provide "EARTH GROUND" system grounding to all system components. Grounding methods shall be approved in advance by Contracting Officer's Representative.

E. Wiring Specifications and Installation

1. The contractor shall:

a. Follow accepted practices, NEC codes and NFPA standards.

b. Label each circuit connector and cable in each control panel or system enclosure.

c. Permanently label or mark each conductor at both ends with permanent alphanumeric wire markers within four (4) inches of the wire termination. Markers shall be visible. Wire label information shall be referenced and included in the as-built drawings.

2. All Video System device system wiring shall be "homerun" to their respective control panels.

3. All wiring connections and interconnections not terminated under screw terminal blocks shall be made using sealant filled wire crimps. The use of wire nuts or similar type devices is not permitted.

4. No splicing of wires is permitted except within control panels or properly labeled terminal cabinets, and device junction boxes. No splicing of any type shall be permitted in pull boxes (to include crimp terminals).

5. All wiring information shall be included in project close-out submittal documents. Reference Section 05.

2.2 FIRE STOPPING/LABORATORY CONDUIT SEALANT

A. General: Fire stop all holes for conduit, piping, or other penetrations which pass through floor slabs, fire-rated walls, partitions with fire-rated doors, vertical service shafts, or any fire-rated assemblies.

1. Fire stop material shall be designed for use for each specific penetration generated by the contractor.

2. Fire stop material shall offer no less than one (1) hour fire rating.

SECTION 05 PROJECT CLOSEOUT

PART 1: GENERAL

1.1 DESCRIPTION

A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.

PART 2: EXECUTION

2.1 CLEANING

A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Thoroughly clean building interiors. Pick up all construction debris from the site. At time of final inspection, project shall be thoroughly cleaned and ready for use.

2.2 PROJECT RECORD DRAWINGS

A. AS-BUILT DRAWINGS: Three (3) sets of record drawings shall be prepared for the system. Drawings shall be legible, neat, complete and easily understood.

B. As-built drawings shall:

1. Reflect only the Access Control, Intrusion Detection and Video Systems and all associated equipment and components. Non-related elements shall not be included on the drawing.

2. Record actual construction, field changes, changes made by change order, details not on original contract drawings/floor plans or shop drawings.

3. Show all sizes and routing of conduit, junction, splice, power supply and control boxes, as well as wire and cable routing. Show each device location with associated device system address.

4. Include specific location of all end-of-line devices or resistors.

5. Include all wire and cable numbers.

C. On-site as-built drawings shall be kept up to date continuously during the system installation by the lead technician. Drawings shall be reviewed on a daily basis for accuracy and completeness, and be made available upon request for review by the Contracting Officer’s Representative.

D. All sets of keys to each lock shall be turned over to the Government upon completion of the installation. Each set of keys shall be properly and legibly marked and tagged. Loose keys will not be accepted.

E. All documents and items described above shall be submitted for approval prior to the final acceptance test by Government.

2.3 CLOSEOUT SUBMITTALS

A. Submit before Government Acceptance Test request.

1. Project Record Drawings: As specified above.

2. Warranty Information: As specified in this Section, Sub-Section 3.7.

2.4 PROJECT COMPLETION AND GOVERNMENT ACCEPTANCE TEST

A. Submit written certification that project, or designated portion of project, is complete, and request in writing a Government Acceptance Test. Contracting Officer shall schedule an acceptance test within ten (10) days of receipt of request.

2.5 ACCEPTANCE OF WORK

A. The Government Acceptance Test will only be performed after the contractor’s final system tests are performed and a letter of completion from the contractor is received.

1. Upon completion of the installation and prior to the acceptance test of the system by the Government, the lead technician shall inspect, test, and adjust the new video systems as needed.

2. Upon completion of the installation and prior to the Government Acceptance Test, the contractor shall provide to the Contracting Officer written certification confirming that the video surveillance systems has been installed to meet, or exceed, the manufacturer’s minimum system installation requirements as of the date of the letter of completion.

B. Total acceptance of a system will only be made after conducting the Government’s acceptance test. A letter of acceptance will be issued only after conducting the Government’s acceptance test, all deficiencies have been corrected, complete record document package and the instruction period have been provided to the Government.

C. If only designated portions have been inspected, tested, and accepted, a letter of partial acceptance will be issued for that portion of the work. However, final payment may be withheld until a letter of acceptance is issued.

D. The project manager, installing lead technician and the Contracting Officer’s Representative shall be in attendance during all acceptance testing.

E. The contractor shall be responsible for the performance of the final acceptance test and shall, to the satisfaction of the Government, demonstrate the function of the system and verify the correct operation of all system components, circuits, and programming. The contractor shall perform these tests in the presence of the Contracting Officer’s Representative.

F. The Government will use the system record drawings (as-builts), operation manuals, and system documents during the acceptance test procedure to verify the system operation as installed and programmed.

G. Test Equipment: All test equipment, instruments, tools, and labor required to conduct the Government’s acceptance test shall be made available by the installation contractor at the time of the test. The following equipment may be needed for testing:

1. Ladders and scaffolds as required for access to all installed equipment.

2. Multimeter for reading voltage, current, and resistance;

3. System programmer and/or tester;

4. Laptop computer with programming software for any required program revisions

5. Two-way radios, flashlights, and any additional supplies.

H. The items tested shall include, but not be limited to, the following:

1. Visual inspection of all installed equipment, components and construction materials.

2. Video equipment functions properly, including; switching and controlling of individual cameras, movement of pan/tilt/zoom cameras, fixed cameras, alarm functions and recording equipment.

3. Any test will initiate the proper system response in compliance with specifications.

4. Check of all documentation for accuracy and completeness.

2.6 DEFECTIVE MATERIAL

A. The contractor shall repair or replace at his/her expense any defective devices, equipment, or wiring. After corrections are made, the contractor shall again perform any and all testing required to demonstrate that the system is in full compliance with the contract drawings and specifications.

2.7 WARRANTY AND REPAIR

A. The contractor shall warranty all work and contractor supplied equipment and materials under this contract for a period of one (1) year from date of final acceptance for each facility and respective system. The contractor will be notified by telephone or letter of all deficiencies occurring during the warranty period.

B. The contractor shall provide repairs and service during the warranty period seven (7) days a week including holidays. Within twenty four (24) hours of a phone call from an authorized Government official, the contractor shall be on-site, determine the problem and submit a plan and schedule for correction and completion of the problem to the Contracting Officer’s Representative.

C. The contractor shall utilize technicians that maintain required licenses and system manufacturer certifications, as required by the appropriate regulatory authority or system manufacturer, and shall be directly related to the specific system (including; hardware, firmware and software versions), equipment and components in need of warranty related repair work.

D. Should the contractor fail to comply with the warranty requirements, the Government will have the option to make the necessary repairs and charge the contractor without any loss of warranty as provided by the contract.

E. Any warranty which is in conflict with the above requirements will not be acceptable.

END OF SPECIFICATIONS